Durability zonation standard (DZS) is proposed to provide useful parameters for durable concrete structure design. It deals not only with the influence of environment on structures, but also with types, functions an...Durability zonation standard (DZS) is proposed to provide useful parameters for durable concrete structure design. It deals not only with the influence of environment on structures, but also with types, functions and importance of structures based on the theory of life cycle cost(LCC). First, the basic concept of DZS for concrete structure design is defined. Then the basic principles for DZS are established. The factors for zonation according to natural environmental conditions and structural importance are identified. The usefulness of DZS by citing a real application for concrete highway bridges in Zhejiang Province is demonstrated. Finally, durability regulations are provided accordingly to zonation.展开更多
This paper introduces the high-speed electrical multiple unit (EMO) life cycle, including the design, manufacturing, testing, and maintenance stages. It also presents the train control and monitoring system (TCMS)...This paper introduces the high-speed electrical multiple unit (EMO) life cycle, including the design, manufacturing, testing, and maintenance stages. It also presents the train control and monitoring system (TCMS) software development platform, the TCMS testing and verification bench, the EMU driving simulation platform, and the EMU remote data transmittal and maintenance platform. All these platforms and benches combined together make up the EMU life cycle cost (LCC) system. Each platform facilitates EMU LCC management and is an important part of the system.展开更多
For an energy-efficient induction machine, the life-cycle cost (LCC) usually is the most important index to the consumer. With this target, the optimization design of a motor is a complex nonlinear problem with constr...For an energy-efficient induction machine, the life-cycle cost (LCC) usually is the most important index to the consumer. With this target, the optimization design of a motor is a complex nonlinear problem with constraints. To solve the problem, the authors introduce a united random algorithm. At first, the problem is divided into two parts, the optimal rotor slots and the optimization of other dimensions. Before optimizing the rotor slots with genetic algorithm ( GA), the second part is solved with TABU algorithm to simplify the problem. The numerical results showed that this method is better than the method using a traditional algorithm.展开更多
Indonesian National Electricity Company (PT.PLN (Persero)) has planned to install additional high voltage undersea cable for circuit llI and IV Java-Bali to fulfill electricity demand in Bali. This project was mor...Indonesian National Electricity Company (PT.PLN (Persero)) has planned to install additional high voltage undersea cable for circuit llI and IV Java-Bali to fulfill electricity demand in Bali. This project was more prefered compared to building another power plant in Bali which could raise social and cultural resistance. Life cycle cost method was used to complete the financial feasibility study to ensure if the project has economic benefit, and the asset would be used effectively and efficiently along its benefit period. In this paper, a life cycle cost will be simulated to analyze which alternative is the most profitable: installation circuit III and IV in 2012 or installation circuit III in 2012 and circuit IV in 2017 in accordance with load forecasting demand. This study is used to help the management to make a decision about the project.展开更多
Reliable service life data of building products are of great importance when completing environmental LCA (life cycle assessment) reviews, for LCC (life cycle costing) and for maintenance planning tasks. A researc...Reliable service life data of building products are of great importance when completing environmental LCA (life cycle assessment) reviews, for LCC (life cycle costing) and for maintenance planning tasks. A research project was set up to answer the following research questions: (1) what are reliable service life data of current used building products; and (2) how can generic data about the service lives of building products be tailored to specific project circumstances using the "factor method" described in the ISO (International Standard Organization) 15686 Series: "Buildings and Constructed Assets-Service-Life Planning". Experts of industry organisations for building materials and products made a final judgement of the new established reference service lives. Reference service lives of building products may show a large unknown bandwidth around the average. That will make the bandwidth of estimated service lives, taking the project situation of building components into account, very big. Experts have raised objections to the use the factor method for deriving mathematically a bandwidth of estimated service lives of a building product from the reference service life of the product. A practical analytical application of the factor method has been made by describing all factors and underlying criteria and a reference situation.展开更多
Above ground gas storage devices for compressed air energy storage(CAES) have three types:air storage tanks,gas cylinders,and gas storage pipelines.A cost model of these gas storage devices is established on the basis...Above ground gas storage devices for compressed air energy storage(CAES) have three types:air storage tanks,gas cylinders,and gas storage pipelines.A cost model of these gas storage devices is established on the basis of whole life cycle cost(LCC) analysis.The optimum parameters of the three types are determined by calculating the theoretical metallic raw material consumption of these three devices and considering the difficulties in manufacture and the influence of gas storage device number.The LCCs of the three types are comprehensively analyzed and compared.The result reveal that the cost of the gas storage pipeline type is lower than that of the other two types.This study may serve as a reference for designing large-scale CAES systems.展开更多
基金The Key Project of National Natural Science Foun-dation of China (No50538070)
文摘Durability zonation standard (DZS) is proposed to provide useful parameters for durable concrete structure design. It deals not only with the influence of environment on structures, but also with types, functions and importance of structures based on the theory of life cycle cost(LCC). First, the basic concept of DZS for concrete structure design is defined. Then the basic principles for DZS are established. The factors for zonation according to natural environmental conditions and structural importance are identified. The usefulness of DZS by citing a real application for concrete highway bridges in Zhejiang Province is demonstrated. Finally, durability regulations are provided accordingly to zonation.
文摘This paper introduces the high-speed electrical multiple unit (EMO) life cycle, including the design, manufacturing, testing, and maintenance stages. It also presents the train control and monitoring system (TCMS) software development platform, the TCMS testing and verification bench, the EMU driving simulation platform, and the EMU remote data transmittal and maintenance platform. All these platforms and benches combined together make up the EMU life cycle cost (LCC) system. Each platform facilitates EMU LCC management and is an important part of the system.
文摘For an energy-efficient induction machine, the life-cycle cost (LCC) usually is the most important index to the consumer. With this target, the optimization design of a motor is a complex nonlinear problem with constraints. To solve the problem, the authors introduce a united random algorithm. At first, the problem is divided into two parts, the optimal rotor slots and the optimization of other dimensions. Before optimizing the rotor slots with genetic algorithm ( GA), the second part is solved with TABU algorithm to simplify the problem. The numerical results showed that this method is better than the method using a traditional algorithm.
文摘Indonesian National Electricity Company (PT.PLN (Persero)) has planned to install additional high voltage undersea cable for circuit llI and IV Java-Bali to fulfill electricity demand in Bali. This project was more prefered compared to building another power plant in Bali which could raise social and cultural resistance. Life cycle cost method was used to complete the financial feasibility study to ensure if the project has economic benefit, and the asset would be used effectively and efficiently along its benefit period. In this paper, a life cycle cost will be simulated to analyze which alternative is the most profitable: installation circuit III and IV in 2012 or installation circuit III in 2012 and circuit IV in 2017 in accordance with load forecasting demand. This study is used to help the management to make a decision about the project.
文摘Reliable service life data of building products are of great importance when completing environmental LCA (life cycle assessment) reviews, for LCC (life cycle costing) and for maintenance planning tasks. A research project was set up to answer the following research questions: (1) what are reliable service life data of current used building products; and (2) how can generic data about the service lives of building products be tailored to specific project circumstances using the "factor method" described in the ISO (International Standard Organization) 15686 Series: "Buildings and Constructed Assets-Service-Life Planning". Experts of industry organisations for building materials and products made a final judgement of the new established reference service lives. Reference service lives of building products may show a large unknown bandwidth around the average. That will make the bandwidth of estimated service lives, taking the project situation of building components into account, very big. Experts have raised objections to the use the factor method for deriving mathematically a bandwidth of estimated service lives of a building product from the reference service life of the product. A practical analytical application of the factor method has been made by describing all factors and underlying criteria and a reference situation.
基金supported by grants from the National High-Tech Research and Development Projects(863)of China(No.2013AA050801)the International S&T Cooperation Projects of China(No.2014DFA60600)
文摘Above ground gas storage devices for compressed air energy storage(CAES) have three types:air storage tanks,gas cylinders,and gas storage pipelines.A cost model of these gas storage devices is established on the basis of whole life cycle cost(LCC) analysis.The optimum parameters of the three types are determined by calculating the theoretical metallic raw material consumption of these three devices and considering the difficulties in manufacture and the influence of gas storage device number.The LCCs of the three types are comprehensively analyzed and compared.The result reveal that the cost of the gas storage pipeline type is lower than that of the other two types.This study may serve as a reference for designing large-scale CAES systems.