期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
定向井阵列侧向测井层厚-围岩影响分析及快速校正 被引量:1
1
作者 冯加明 刘迪仁 +3 位作者 倪小威 徐观佑 敖旋峰 徐思慧 《断块油气田》 CAS 北大核心 2018年第5期593-597,625,共6页
定向井阵列侧向测井响应由于受井斜、层厚、围岩等环境因素的影响,难以真实反映储层电阻率。通过建立三维球状介质模型,利用有限元法对定向井阵列侧向测井的响应特性进行研究,分析了三维地层模型下井斜角及层厚、围岩变化对阵列侧向测... 定向井阵列侧向测井响应由于受井斜、层厚、围岩等环境因素的影响,难以真实反映储层电阻率。通过建立三维球状介质模型,利用有限元法对定向井阵列侧向测井的响应特性进行研究,分析了三维地层模型下井斜角及层厚、围岩变化对阵列侧向测井响应的影响。研究表明,直井、斜井及水平井阵列侧向测井响应规律存在明显差异。井斜角越大,仪器受层厚及围岩的影响越大。当目的层厚小于8 m时,不同围岩电阻率对视电阻率的影响较大。构建了不同井斜角条件下的阵列侧向测井层厚-围岩校正图版,并通过数据分析手段,得出围岩、层厚的非线性快速校正公式及快速校正图版,与正演模拟图版具有较好的一致性,可用于定向井阵列侧向测井响应的快速实时校正。 展开更多
关键词 定向井 阵列侧向测井 井斜角 层厚-围岩 快速校正
下载PDF
Roadway layout for recycling residual coal pillar in room-and-pillar mining of thick coal seam 被引量:2
2
作者 Jin Gan Wang Lianguo +2 位作者 Zhang Jihua Hu Minjun Duan Ning 《International Journal of Mining Science and Technology》 SCIE EI CSCD 2015年第5期729-734,共6页
In the context of a room-and-pillar mining gob in Shanxi province in China,this paper numerically investigates the stress distribution and deformation rules of roadway surrounding rocks at various locations of residua... In the context of a room-and-pillar mining gob in Shanxi province in China,this paper numerically investigates the stress distribution and deformation rules of roadway surrounding rocks at various locations of residual coal pillars in room-and-pillar mining gobs using software FLAC3 D.It is found that the concentrated stress beneath coal pillars distributes in a shape of ellipse.A reasonable roadway layout is then proposed.In this design,it is indicated that roadways should be designed to avoid the supporting zones of pillars with increasing compression and take into account the roof falling and crushing in the upper gob.According to the surrounding rock deformation characteristics and mining roadway locations as well as the supporting principles of timely support,rock reinforcing,piecewise management and suiting local conditions,a new asymmetric shield supporting plan is proposed.The field surveying results show that this supporting plan can effectively control the roadway rock deformation,thus guarantee the safe and smooth construction of roadways. 展开更多
关键词 Room-and-pillar mine Residual coal pillar Repeated mining Roadway layout Asymmetric support
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部