期刊文献+
共找到3篇文章
< 1 >
每页显示 20 50 100
主动雷达导引头屋顶试验和高架试验系统
1
作者 毕铭 《制导与引信》 2002年第2期37-39,共3页
介绍了主动雷达导引头的两种试验方法:屋顶模拟试验和高架演示试验.屋顶模拟试验是主动雷达导引头与模拟信号源对接试验,用来考核主动雷达导引头在全功率辐射条件下的技术性能.高架演示试验是主动雷达导引头和实际目标的联合试验,用来... 介绍了主动雷达导引头的两种试验方法:屋顶模拟试验和高架演示试验.屋顶模拟试验是主动雷达导引头与模拟信号源对接试验,用来考核主动雷达导引头在全功率辐射条件下的技术性能.高架演示试验是主动雷达导引头和实际目标的联合试验,用来检验主动雷达导引头的探测跟踪能力. 展开更多
关键词 主动雷达导引头 屋顶试验 高架试验 模拟试验
下载PDF
Similar material simulation research on movement law of roof over-lying strata in stope of fully mechanized caving face with large mining height 被引量:2
2
作者 ZHU Yong-jian PENG Gang 《Journal of Coal Science & Engineering(China)》 2010年第1期6-10,共5页
Similar material simulation test W9-15 101 fully mechanized caving face with was carried out in a geological model of large mining height in the Liuhuanggou Colliery, in Xinjiang Uigur Autonomous Region. The roof over... Similar material simulation test W9-15 101 fully mechanized caving face with was carried out in a geological model of large mining height in the Liuhuanggou Colliery, in Xinjiang Uigur Autonomous Region. The roof overlying strata movement law in the stope of a fully mechanized caving face with large mining height was studied and show that the roof overlying strata in the stope of a fully mechanized caving face with large mining height can be formed into a stable arch structure; the fracture rock beam is formed resembling a "bond beam", but it has essentially the structure of "multi-span beams" under the big structure of the stable arch. The roof overlying strata movement law in the stope of a fully mechanized caving face with large mining height is similar to that of the common, fully mechanized caving stope, which is determined by the deformation and instability of the structure of "multi-span beams". But because of the differences between the mining heights, the peak pressure in the stope of a fully mechanized caving face with large mining height is smaller while the affected area of abutment pressure is wider in the front of the working face; this is the obvious difference in abutment pressure between the stope of a fully mechanized caving face with large mining height and that of the common. 展开更多
关键词 fully mechanized caving face with large mining height STOPE roof overlyingstrata stable arch structure
下载PDF
Wind tunnel testing of wind pressures on a large gymnasium roof
3
作者 傅继阳 吴玖荣 梁枢果 《Journal of Central South University》 SCIE EI CAS 2011年第2期521-529,共9页
A wind tunnel test was conducted for a large steel gymnasium structure. Simultaneous pressure measurements were made on its entire ellipsoidal roof in a simulated suburban boundary layer flow field. Special attention ... A wind tunnel test was conducted for a large steel gymnasium structure. Simultaneous pressure measurements were made on its entire ellipsoidal roof in a simulated suburban boundary layer flow field. Special attention is paid to the charaeteristics of fluctuating wind pressures in different zones on the roof. Some selected results are presented: 1) correlations between fluctuating wind pressures on both roof surfaces, 2) eigenvalues and eigenvectors of covariance matrices of the fluctuating wind pressures, 3) probability distributions of the fluctuating wind pressures, and 4) statistical characteristics of peak factor. Furthermore, the applicability of the quasi-steady approach is discussed in detail. Based on the results, an empirical formula for estimating the minimum pressure coefficients, using a peak factor approach, is presented. Comparison of the minimum pressure coefficients determined by the proposed formula and those obtained from the wind tunnel tests is made to examine the applicability and accuracy of the proposed formula. 展开更多
关键词 long-span roof wind pressure wind tunnel test gymnasium roof
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部