期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
阿尔及利亚承包工程中属地人工成本浅析
1
作者 王静 《中文科技期刊数据库(全文版)经济管理》 2023年第3期33-36,共4页
随着国家“一带一路”倡议的持续推进,政策沟通、设施联通、贸易畅通、资金融通、民心相通在内的“五通”是沿线国家间合作的主要领域,其中,基础设施互联互通是“一带一路”倡议的优先领域。因此,中国建筑企业加快“走出去”的步伐,加... 随着国家“一带一路”倡议的持续推进,政策沟通、设施联通、贸易畅通、资金融通、民心相通在内的“五通”是沿线国家间合作的主要领域,其中,基础设施互联互通是“一带一路”倡议的优先领域。因此,中国建筑企业加快“走出去”的步伐,加深“大海外”战略的实践力度,加大“海外基地”的布局投资,成为“一带一路”倡议的践行者、先行者。对于企业,盈利是其生存的根本动力,如何在海外“大建设”中获得理想的效益,就必须在建设过程中分析成本、控制成本、节约成本,而属地人工成本是工程成本中主要的构成部分。 展开更多
关键词 阿尔及利亚 属地人工 成本 工程承包
下载PDF
Illumination of parameter contributions on uneven break: phenomenon in underground stoping mines 被引量:2
2
作者 Jang Hyongdoo Topal Erkan Kawamura Youhei 《International Journal of Mining Science and Technology》 SCIE EI CSCD 2016年第6期1095-1100,共6页
One of the most serious conundrum facing the stope production in underground metalliferous mining is uneven break (UB: unplanned dilution and ore-loss). Although the UB has a huge economic fallout to the entire min... One of the most serious conundrum facing the stope production in underground metalliferous mining is uneven break (UB: unplanned dilution and ore-loss). Although the UB has a huge economic fallout to the entire mining process, it is practically unavoidable due to the complex causing mechanism. In this study, the contribution of ten major UB causative parameters ha,; been scrutinised based on a published UB predicting artificial neuron network (ANN) model to put UB under the engineering management. Two typical ANN sensitivity analysis methods, i.e., connection weight algorithm (CWA) and profile method (PM) have been applied. As a result of CWA and PM applications, adjusted Qrate (AQ) revealed as the most influential parameter to UB with contribution of 22,40% in CWA and 20,48% in PM respectively. The findings of this study can be used as an important reference in stope design, production, and reconciliation stages on underground stoping mine. 展开更多
关键词 Unplanned dilution Ore-loss Underground metalliferous mining Uneven break Artificial neuron network
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部