期刊文献+
共找到3篇文章
< 1 >
每页显示 20 50 100
良心隧道右线进口段山体位移引起洞身变形的治理和研究
1
作者 李建华 《现代商贸工业》 2007年第12期269-270,共2页
重点介绍了陕西省西安-汉中高速公路良心隧道工程进口段以山体位移引起洞身变形的治理过程及技术研究。
关键词 良心隧道 山体位移 洞身变形
下载PDF
Analysis on Dam-Breaking Mode of Tangjiashan Barrier Dam in Beichuan County 被引量:7
2
作者 HU Xiewen LUO Gang +2 位作者 LV Xiaoping HUANG Runqiu SHI Yubin 《Journal of Mountain Science》 SCIE CSCD 2011年第2期354-362,共9页
Tangjiashan landslide is a typical high-speed consequent landslide of medium-steep dip angle. This landslide triggered by earthquake took place in about semi-minute. The relative sliding displacement is 900 meters, so... Tangjiashan landslide is a typical high-speed consequent landslide of medium-steep dip angle. This landslide triggered by earthquake took place in about semi-minute. The relative sliding displacement is 900 meters, so average sliding speed is about 30 meters per second. The longitudinal length of barrier dam which is formed by high-speed landslide along river is 803.4 meters; and maximum width crossing river is 611.8 meters. And its volume is estimated about 20.37 million steres. Through detailed geological investigation of the barrier dam, together with early geological information before earthquake, geological structures of the barrier dam and its stability of upstream and downstream slopes are studied when water level reaches different elevations in condition of continual after shocks with seismic intensity of 7 or 8 Richter scale. On this basis, dam-breaking mode of barrier dam is discussed deeply. Thereby, analytic results provide significant guidance and advices to front headquarters of Tangjiashan barrier dam, so that some proper engineering measures can be implemented and flood discharge can be carried out well. 展开更多
关键词 Tangjiashan Barrier Dam High-speed landslide Blocking river Dam-breaking
下载PDF
云南南景高速阿比村隧道加宽带突泥涌水原因分析与处治技术 被引量:6
3
作者 陈俊武 李国锋 +3 位作者 王明江 杨峰 王安民 仝跃 《现代隧道技术》 CSCD 北大核心 2022年第S01期858-865,共8页
云南地处横断山区,受印度洋与欧亚板块挤压作用,地质条件差,围岩破碎富水,隧道施工时常发生突泥涌水工程问题。阿比村隧道为南涧至景东高速公路的控制性工程,隧道施工过程中左洞ZK30+569~594段加宽带出现突泥涌水。通过现场测斜孔监测... 云南地处横断山区,受印度洋与欧亚板块挤压作用,地质条件差,围岩破碎富水,隧道施工时常发生突泥涌水工程问题。阿比村隧道为南涧至景东高速公路的控制性工程,隧道施工过程中左洞ZK30+569~594段加宽带出现突泥涌水。通过现场测斜孔监测及数值计算和综合分析,揭示隧道上方山体位移成因及发展规律;进一步采用地质钻孔确定坍塌体的规模,重新设计初期支护、二次衬砌厚度和配筋等参数;依据位移数据与地质钻孔成果,提出隧道突泥涌水段的综合处治措施。现场实施及后续监测表明:隧道加宽带突泥涌水处治效果良好,可为类似工程提供参考和借鉴经验。 展开更多
关键词 隧道 软岩 突泥涌水 山体位移 处治措施
下载PDF