上软下硬地层矩形顶管施工关键技术探讨
1
作者 何展通 《中文科技期刊数据库(全文版)工程技术》 2024年第6期0098-0102,共5页
以往矩形顶管工程在上软下硬地层中顶进的案例较少,且相关的技术措施总结较为缺乏。对以往工程案例进行分析,发现在上软下硬地层中矩形顶管施工存在刀具易磨损、机头向软弱土层偏移、姿态难控等问题。依托南京南站北广场地下行人过街通... 以往矩形顶管工程在上软下硬地层中顶进的案例较少,且相关的技术措施总结较为缺乏。对以往工程案例进行分析,发现在上软下硬地层中矩形顶管施工存在刀具易磨损、机头向软弱土层偏移、姿态难控等问题。依托南京南站北广场地下行人过街通道工程,为应对上软下硬地层中顶管施工的难点,对顶管机刀具、壳体及土仓进行了改造,并对土层下方所遇硬岩层实施钻孔破碎的预处理措施。该工程的顺利贯通验证了所采取的施工技术措施有效可行。 展开更多
关键词 矩形顶管法 上软下硬地层 岩层预处理 矩形顶管机改造
下载PDF
基坑围护结构地下连续墙遇微风化岩施工技术优化研究及应用 被引量:3
2
作者 司海峰 《广东土木与建筑》 2009年第12期20-22,共3页
广州地铁三号线同和站基坑围护结构地下连续墙施工中遇到微风化岩层,通过技术方案优化后采用吊脚连续墙,以及施工预处理超前梅花钻工艺,达到了预定的工期目标并取得极大的工程效益。
关键词 连续墙成槽 微风化岩层 吊脚连续墙 岩层预处理 超前梅花钻孔
下载PDF
In-situ stress measurements and stress change monitoring to monitor overburden caving behaviour and hydraulic fracture pre-conditioning 被引量:6
3
作者 Puller Jesse W. Mills Ken W. +1 位作者 Jeffrey Rob G. Walker Rick J. 《International Journal of Mining Science and Technology》 SCIE EI CSCD 2016年第1期103-110,共8页
A coal mine in New South Wales is longwall mining 300 m wide panels at a depth of 160–180 m directly below a 16–20 m thick conglomerate strata. As part of a strategy to use hydraulic fracturing to manage potential w... A coal mine in New South Wales is longwall mining 300 m wide panels at a depth of 160–180 m directly below a 16–20 m thick conglomerate strata. As part of a strategy to use hydraulic fracturing to manage potential windblast and periodic caving hazards associated with these conglomerate strata,the in-situ stresses in the conglomerate were measured using ANZI strain cells and the overcoring method of stress relief. Changes in stress associated with abutment loading and placement of hydraulic fractures were also measured using ANZI strain cells installed from the surface and from underground. Overcore stress measurements have indicated that the vertical stress is the lowest principal stress so that hydraulic fractures placed ahead of mining form horizontally and so provide effective pre-conditioning to promote caving of the conglomerate strata. Monitoring of stress changes in the overburden strata during longwall retreat was undertaken at two different locations at the mine. The monitoring indicated stress changes were evident 150 m ahead of the longwall face and abutment loading reached a maximum increase of about7.5 MPa. The stresses ahead of mining change gradually with distance to the approaching longwall and in a direction consistent with the horizontal in-situ stresses. There was no evidence in the stress change monitoring results to indicate significant cyclical forward abutment loading ahead of the face. The forward abutment load determined from the stress change monitoring is consistent with the weight of overburden strata overhanging the goaf indicated by subsidence monitoring. 展开更多
关键词 Stress measurementOverburdenHydraulic fracturing Longwall
下载PDF
复杂环境下大尺寸土压平衡矩形顶管施工的应用实践 被引量:3
4
作者 周爱民 《工业技术创新》 2022年第2期157-161,共5页
受复杂地质条件和所处环境影响,大尺寸土压平衡矩形顶管施工存在诸多工程难点。以韶光地铁站为研究对象,从地质补勘、顶管机选型、岩层预处理、顶进控制、泥浆置换、姿态测量与纠偏等方面提出顶管施工的应用控制策略。地质补勘详细查明... 受复杂地质条件和所处环境影响,大尺寸土压平衡矩形顶管施工存在诸多工程难点。以韶光地铁站为研究对象,从地质补勘、顶管机选型、岩层预处理、顶进控制、泥浆置换、姿态测量与纠偏等方面提出顶管施工的应用控制策略。地质补勘详细查明地层构造特征,明确岩土物理力学性质,确定顶进模式和顶进参数;依据勘察数据,顶管机选型中优选多刀盘旋转开挖形式,提出刀盘布置;为降低工程风险,实施岩层预处理,对中风化泥质粉砂岩层进行预处理,有效避免开挖盲区;工程实施中,重点监控顶进控制和姿态测量与纠偏,测算顶进施工土压力设定值,采用自学习控制算法调整顶进姿态;根据监测数据及时调整注浆量和注浆压力,防止后期沉降,实施泥浆置换工程。针对复杂环境提出了安全施工规程,强化重点举措,确定大尺寸土压平衡矩形顶管施工在复杂环境下的保安全、保质量的工程实践案例。 展开更多
关键词 复杂环境 大尺寸土压平衡矩形顶管 岩层预处理 顶进施工 泥浆置换 安全施工