期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
岩巷掘进超前临时支护的应用探讨
1
作者 杨猛 毛宏珠 《科技创新与应用》 2012年第11期77-77,共1页
在岩巷掘进施工过程中,临时支护是一道必不可少的工序,对安全生产和正规循环组织的影响都非常大。从巷道爆破后临时支护方面入手,结合五沟煤矿实际条件,对传统临时支护施工工艺进行了优化,提出了超前临时支护工艺设计参数及方法,并应用... 在岩巷掘进施工过程中,临时支护是一道必不可少的工序,对安全生产和正规循环组织的影响都非常大。从巷道爆破后临时支护方面入手,结合五沟煤矿实际条件,对传统临时支护施工工艺进行了优化,提出了超前临时支护工艺设计参数及方法,并应用于实践中,取得了良好的效果。 展开更多
关键词 煤矿 临时支护 岩巷应用
下载PDF
Stress and deformation analysis on deep surrounding rock at different time stages and its application 被引量:9
2
作者 Li Ming Mao Xianbiao +3 位作者 Yu Yuanlin Li Kai Ma Chao Peng Yan 《International Journal of Mining Science and Technology》 SCIE EI 2012年第3期301-306,共6页
Based on the characteristics of the deep circular tunnel, the surrounding rock was divided into three regions: the cracked region, the plastic region and the viscoelastic region. The process of rock stress deformatio... Based on the characteristics of the deep circular tunnel, the surrounding rock was divided into three regions: the cracked region, the plastic region and the viscoelastic region. The process of rock stress deformation and change was divided into three stages after the roadway excavation. By using the elastic-plastic mechanics theory, the analytical solutions of the surrounding stress and displacement at different stages and the radii of cracked and plastic regions were formulated. We additionally explained the surrounding rock stress and displacement which appeared in practical project. Simultaneously, based on the problem which emerged from a mine in Xuzhou during the excavating process of rock roadway's transport, we got the theoretical solutions for the stress and displacement in the process of rock roadway's excavation and considered that the broken area of rock roadway was largely loosing circle. The results indicate that according to the rheological characteristics of surrounding rock, in the primeval excavation of rock roadway, we should increase the length of anchor bolt and cooperate it with anchor nets cable-U steel supporting frame. In addition, when the deformation rate of the surrounding rock is descending after the 15 days' excavation, we should use the "three anchor" supporting method (anchor bolt spray, anchor note and anchor rove) and set aside about 20 cm as the reserved deformation laver. 展开更多
关键词 Surrounding rockStress displacementViscoelasticityBroken rock zone
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部