冷竹关闸首工程崩积堆层中防渗墙的施工
1
作者 刘绍宝 李洪飞 楚学勇 《东北水利水电》 2003年第5期44-45,共2页
冷竹关闸首工程防渗墙施工中遇崩积堆地层,给施工带来相当大的难度。此次施工中,首先采用预爆破处理,以加速地层稳定,同时对施工平台采取了加固措施。本文对冷竹关崩积堆地层成墙的施工过程做了详细的介绍。
关键词 崩积堆 防渗墙 冷竹关水电站
下载PDF
Bending behavior of double-row stabilizing piles with constructional time delay 被引量:11
2
作者 Yang YU Yue-quan SHANG Hong-yue SUN 《Journal of Zhejiang University-Science A(Applied Physics & Engineering)》 SCIE EI CAS CSCD 2012年第8期596-609,共14页
The bending behavior of double-row stabilizing plies is associated with the constructional time delay(CTD),which can be defined as the time interval between the installations of the front stabilizing pile and the rear... The bending behavior of double-row stabilizing plies is associated with the constructional time delay(CTD),which can be defined as the time interval between the installations of the front stabilizing pile and the rear stabilizing pile.This paper investigates the effect of CTD on the bending moments of double-row stabilizing piles and a method for determining the optimal CTD is proposed.The stabilizing pile is modeled as a cantilever pile embedded in the Winkler elastic foundation.A triangular distributed earth pressure is assumed on the pile segment in the sliding layer.The front stabilizing pile and the rear stabilizing pile are connected by a beam with pinned joints.The analytical solutions of bending moments on the front and the rear stabilizing piles are derived and the accuracy of bending moment solutions is validated by comparing the tensile strain measured from the Hongyan landslide project,Taizhou,Zhejiang,China.It is concluded that CTD has a significant influence on the bending moments of double-row stabilizing piles.An optimal CTD can be obtained when the maximum tensile stress in the front stabilizing pile is equal to that in the rear stabilizing pile,which is 1.4 months for the Hongyan landslide project. 展开更多
关键词 Subgrade reaction LANDSLIDE Stabilizing pile Constructional time delay (CTD) Bending moment