The optimal scheduling of multi-product batch process is studied and a new mathematics model targeting the maximum profit is proposed, which can be solved by the modified genetic algorithm (MGA) with mixed coding (seq...The optimal scheduling of multi-product batch process is studied and a new mathematics model targeting the maximum profit is proposed, which can be solved by the modified genetic algorithm (MGA) with mixed coding (sequence coding and decimal coding) developed by us. In which, the partially matched cross over (PMX) and reverse mutation are used for the sequence coding, whereas the arithmetic crossover and heteropic mutation are used for the decimal coding. In addition, the relationship between production scale and production cost is analyzed and the maximum profit is always a trade-off of the production scale and production cost. Two examples are solved to demonstrate the effectiveness of the method.展开更多
Trends in modern industry show a tendency towards demassovization of production as a response to the customers' specific needs for unique and personalized products. This provokes significant changes in the processes ...Trends in modern industry show a tendency towards demassovization of production as a response to the customers' specific needs for unique and personalized products. This provokes significant changes in the processes of manufacturing, assembly, and testing The cost of such a type of production can be reduced by employing highly productive reconfigurable equipment with proper software to enable optimization. This paper presents a decision support extension for directing of hydraulic cylinders to assembly-testing lines using fuzzy logic in the Enterprise Resource Planning system of a small size production in a factory in Bulgaria. Different assembly-testing lines are flexibly assigned to the specific cylinder's parameters by the developed fuzzy system on the basis of the overlapping of parameters in the hydraulic cylinders classification. The final decision on the line assigned in case of alternatives is made through accounting for the minimal cylinder delay time. The effectiveness of the approach is assessed by simulation. It leads to an increase of the efficiency of the assembly-testing flow lines, a reduction of the time needed for hydraulic cylinders assembling and testing and balanced loading of the modules.展开更多
文摘The optimal scheduling of multi-product batch process is studied and a new mathematics model targeting the maximum profit is proposed, which can be solved by the modified genetic algorithm (MGA) with mixed coding (sequence coding and decimal coding) developed by us. In which, the partially matched cross over (PMX) and reverse mutation are used for the sequence coding, whereas the arithmetic crossover and heteropic mutation are used for the decimal coding. In addition, the relationship between production scale and production cost is analyzed and the maximum profit is always a trade-off of the production scale and production cost. Two examples are solved to demonstrate the effectiveness of the method.
文摘Trends in modern industry show a tendency towards demassovization of production as a response to the customers' specific needs for unique and personalized products. This provokes significant changes in the processes of manufacturing, assembly, and testing The cost of such a type of production can be reduced by employing highly productive reconfigurable equipment with proper software to enable optimization. This paper presents a decision support extension for directing of hydraulic cylinders to assembly-testing lines using fuzzy logic in the Enterprise Resource Planning system of a small size production in a factory in Bulgaria. Different assembly-testing lines are flexibly assigned to the specific cylinder's parameters by the developed fuzzy system on the basis of the overlapping of parameters in the hydraulic cylinders classification. The final decision on the line assigned in case of alternatives is made through accounting for the minimal cylinder delay time. The effectiveness of the approach is assessed by simulation. It leads to an increase of the efficiency of the assembly-testing flow lines, a reduction of the time needed for hydraulic cylinders assembling and testing and balanced loading of the modules.