期刊文献+
共找到3篇文章
< 1 >
每页显示 20 50 100
港口机械配套件加工工段建设
1
作者 陈贻平 张浩 季剑聪 《港口装卸》 2019年第6期42-44,62,共4页
以港口机械配套件精加工车间的设备布局和生产模式为研究对象,针对原生产模式存在的生产周期长、在制品多、搬运距离长、等待时间长等问题,根据生产现场实际运行情况,采取工艺优化、工装升级、快速流动、并行生产、现场管理等多种改进方... 以港口机械配套件精加工车间的设备布局和生产模式为研究对象,针对原生产模式存在的生产周期长、在制品多、搬运距离长、等待时间长等问题,根据生产现场实际运行情况,采取工艺优化、工装升级、快速流动、并行生产、现场管理等多种改进方式,将原先以工序为单位串行加工的车间生产方式,转变成以产品为核心前后工序并行制造的工段制生产方式,大幅提升了生产效率与经济效益。 展开更多
关键词 港机配套件加工 精益生产 工艺优化 工段建设
下载PDF
如何当好工段长
2
作者 郝嘉驹 《建设科技(重庆)》 1992年第2期39-39,30,共2页
关键词 工段管理 工段 工段建设 企业 民主管理
下载PDF
Examining Construction Quality Supervision and Organization Procedures for BOT Projects by Comparing with DBB Projects
3
作者 Leu Wen Hao Andrew S. Chang 《Journal of Civil Engineering and Architecture》 2011年第5期412-420,共9页
Adopting the BOT (build-operate-transfer) delivery method has brought opportunities and challenges in construction time and quality for urban infrastructure. Many studies investigate the upstream issues of BOT proje... Adopting the BOT (build-operate-transfer) delivery method has brought opportunities and challenges in construction time and quality for urban infrastructure. Many studies investigate the upstream issues of BOT projects such as concessionaire selection criteria and risk factors. But the project execution becomes complicated such as the escalated quality supervision organization and procedure at the construction stage. This extra supervision may have constituted hidden redundancies as waste to economic sustainability. This paper investigated construction quality supervision of BOT projects to pinpoint adequate degree of supervision and detect redundant organization and procedures. The study adopted ten subway construction projects as cases in which five were from the traditional design-bid-build (DBB) and five from the BOT methods. Thirty six project participants including owners, contractors, designers, and concessionaire managers of the ten projects were interviewed to tell their views on these issues. The quality supervision measures of the DBB projects were used as the baseline and compared with those of the BOT projects. The research results show that the construction quality seems no difference for the DBB and BOT projects. Construction quality comes out of supervision but excessive supervision organization and procedures do not necessarily improve quality. This finding indicates that adequate degree of supervision is enough to achieve required quality to save immense paperwork for large construction projects. 展开更多
关键词 BOT DBB quality supervision quality organization and procedure subway construction.
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部