期刊文献+
共找到3篇文章
< 1 >
每页显示 20 50 100
国标《装饰石材矿山露天开采工程设计规范》大纲审查会暨项目启动会召开
1
《中国建材资讯》 2011年第4期2-2,共1页
2011年5月12日国标《装饰石材矿山露天开采工程设计规范》大纲审查会暨项目启动会在北京召开。住房和城乡建设部标准定额司张磊主任出席会议并讲话。
关键词 审查会 工程计规范 项目启动会 主编单位 标准定额 中国建材 建筑材料工业 标准化协会 工程勘测设
原文传递
Research on Geological Structure Inversion Method with Acoustic Computed Tomography and Borehole Data 被引量:1
2
作者 GUO Qiang LIANG Zhi-wei LIAO Zheng-biao 《Journal of Shanghai Jiaotong university(Science)》 EI 2013年第3期284-288,共5页
This article firstly proposes two problems related to geological structure inversion with acoustic computed tomography (CT): ① the results surveyed are different from true stratum layers; ② the existing acoustic CT ... This article firstly proposes two problems related to geological structure inversion with acoustic computed tomography (CT): ① the results surveyed are different from true stratum layers; ② the existing acoustic CT inversion methods are based on wave's travel route and velocity analysis, which is short of comprehensive analysis of the revealed geological data. Then, it puts forward the method of applying the borehole data to revise acoustic CT investigation result through controlling the boundary velocity. This method comprehensively uses acoustic data and borehole data to invert the rock masses' shear wave speed. Comparing to calculating the rock mass' wave speed with acoustic data alone, it makes full use of the information, and the results obtained are closer to real stratum. Finally, it applies the method to engineering project and the results gotten with the method are more accurate, which shows the reliability and accuracy of the method. 展开更多
关键词 borehole acoustic computed tomography (CT) borehole data velocity correction minimum path algorithm
原文传递
Back-Analysis of the Response of Shield Tunneling by 3D Finite Element Method
3
作者 ZHANG Zi-xin SHEN Mang-jie TENC Li 《Journal of Shanghai Jiaotong university(Science)》 EI 2013年第3期298-305,共8页
This paper presents a numerical back-analysis of the response of a shield tunnel during construction. An important issue in the construction of shallow tunnels, especially in soft ground conditions, is the surface set... This paper presents a numerical back-analysis of the response of a shield tunnel during construction. An important issue in the construction of shallow tunnels, especially in soft ground conditions, is the surface settlement caused by shield tunneling. The tunnel test system with 10 m length, 7 m width and 6.7 m height, which was completed in China in 2009, is a research shield tunnel system. Using shield tunneling technique known as earth pressure balance (EPB) and slurry shield method, it could be excavated in a region consisting of original soft soils, such as silty clay, and different types of underlain soft soils. Based on the test results, the real-life tunnel response can be analyzed by back-analysis technique. The back-analysis technique is adapted to the three-dimensional finite element method (FEM). Parameter analyses are calibrated to study the behavior of the multi-scale diameter tunnel under various conditions. The suggested multi-scale model results show a well agreement between the prediction and the measurement. 展开更多
关键词 shield tunneling finite element method (FEM) surface settlement multi-scale model
原文传递
上一页 1 下一页 到第
使用帮助 返回顶部