On basis of ground stress surveying and analysis of physical nature and mechanics character of rock, the deformation mechanism of west main roadway in Zhangshuanglou Mine is studied. It is put forward that engineering...On basis of ground stress surveying and analysis of physical nature and mechanics character of rock, the deformation mechanism of west main roadway in Zhangshuanglou Mine is studied. It is put forward that engineering mechanics nature, infiltration of water and concentrated stress on pillar are the main factors to affect stability of the west main roadway. The overall thinking used to restore the roadway is raised.展开更多
The research process,main contents,methods and conclusions for some major engineering geological problems of the Three Gorges Project (TGP) are reviewed and introduced,including dam site selection,regional tectonic st...The research process,main contents,methods and conclusions for some major engineering geological problems of the Three Gorges Project (TGP) are reviewed and introduced,including dam site selection,regional tectonic stability and seismic activity,stability of reservoir bank and reservoir-induced earthquake.Meanwhile,the above mentioned engineering geological problems are evaluated according to the preliminary test results since TGP operation and impoundment in 2003.展开更多
文摘On basis of ground stress surveying and analysis of physical nature and mechanics character of rock, the deformation mechanism of west main roadway in Zhangshuanglou Mine is studied. It is put forward that engineering mechanics nature, infiltration of water and concentrated stress on pillar are the main factors to affect stability of the west main roadway. The overall thinking used to restore the roadway is raised.
文摘The research process,main contents,methods and conclusions for some major engineering geological problems of the Three Gorges Project (TGP) are reviewed and introduced,including dam site selection,regional tectonic stability and seismic activity,stability of reservoir bank and reservoir-induced earthquake.Meanwhile,the above mentioned engineering geological problems are evaluated according to the preliminary test results since TGP operation and impoundment in 2003.