Pre-geological prediction (PGP) is defined as the prediction of engineering geologic condition and hy-drogeological condition certain distance ahead of the working face. The purpose of this paper is to introduce mainl...Pre-geological prediction (PGP) is defined as the prediction of engineering geologic condition and hy-drogeological condition certain distance ahead of the working face. The purpose of this paper is to introduce mainlygeologic survey before and in excavation, to clarify their emphasis on PGP. At the same time, the technique is appliedto an engineering case, the longest highway tunnel in Gansu province. Data of geological survey of outside tunnels,sound wave detection, and geologic sketch for both tunnel face and sidewalls within the tunnel are analyzed. Afteranalyzing these data, long-term pre-geological prediction forecasting basic geological conditions of fault 4 such aslithology, scope, location, etc., and short-term and more accurate pre-geological prediction are reported.展开更多
The non-coupled charge explosion and geo-mechanical dynamics problem in real air condition is studied in this paper. It analyzes and calculates the problem by using the real air state equations. Through researching on...The non-coupled charge explosion and geo-mechanical dynamics problem in real air condition is studied in this paper. It analyzes and calculates the problem by using the real air state equations. Through researching on the non-coupled charge rock bench blasting with big clearance of air, its result indicates that the borehole wall reflection overpressure is far higher than strength of rock, but much lower than detonation front pressure of the charge. So non-coupled charge explosion blasting engineering is very successful. Furthermore, it introduces the method of shaft forming by blasting once and the new tube room technology. And the non-coupled charge explosion is used successfully in the method of shaft forming by blasting once. As it drills and blasts in the top and removes the broken rock from the bottom tunnel, it increases the construction efficiency significantly. This paper has important reference on the improvement of the large-span underground engineering construction.展开更多
文摘Pre-geological prediction (PGP) is defined as the prediction of engineering geologic condition and hy-drogeological condition certain distance ahead of the working face. The purpose of this paper is to introduce mainlygeologic survey before and in excavation, to clarify their emphasis on PGP. At the same time, the technique is appliedto an engineering case, the longest highway tunnel in Gansu province. Data of geological survey of outside tunnels,sound wave detection, and geologic sketch for both tunnel face and sidewalls within the tunnel are analyzed. Afteranalyzing these data, long-term pre-geological prediction forecasting basic geological conditions of fault 4 such aslithology, scope, location, etc., and short-term and more accurate pre-geological prediction are reported.
文摘The non-coupled charge explosion and geo-mechanical dynamics problem in real air condition is studied in this paper. It analyzes and calculates the problem by using the real air state equations. Through researching on the non-coupled charge rock bench blasting with big clearance of air, its result indicates that the borehole wall reflection overpressure is far higher than strength of rock, but much lower than detonation front pressure of the charge. So non-coupled charge explosion blasting engineering is very successful. Furthermore, it introduces the method of shaft forming by blasting once and the new tube room technology. And the non-coupled charge explosion is used successfully in the method of shaft forming by blasting once. As it drills and blasts in the top and removes the broken rock from the bottom tunnel, it increases the construction efficiency significantly. This paper has important reference on the improvement of the large-span underground engineering construction.