庆元抽水蓄能电站装机容量选择研究
1
作者 訾天亮 庞金龙 《水利水电工程设计》 2024年第3期69-72,共4页
为研究浙江省庆元抽水蓄能电站技术经济合理的装机容量指标,着重分析了浙江省抽水蓄能电站需求空间及本工程的建设条件等主要影响因素,拟定了3个装机容量方案,重点针对工程布置方案、电力系统作用及经济指标等方面开展技术经济综合比较... 为研究浙江省庆元抽水蓄能电站技术经济合理的装机容量指标,着重分析了浙江省抽水蓄能电站需求空间及本工程的建设条件等主要影响因素,拟定了3个装机容量方案,重点针对工程布置方案、电力系统作用及经济指标等方面开展技术经济综合比较,以技术经济优、电力系统贡献大为原则,提出了推荐方案。研究思路可为同类型抽水蓄能电站装机容量选择提供参考。 展开更多
关键词 装机容量选择 抽水蓄能电站需求空间 工程建设条件 技术经济比较
下载PDF
Applications of Pre-Geological Prediction in Tunnel Construction 被引量:1
2
作者 YANG Hui-jun WANG Meng-shu LIU Gao 《Journal of China University of Mining and Technology》 EI 2005年第3期203-207,共5页
Pre-geological prediction (PGP) is defined as the prediction of engineering geologic condition and hy-drogeological condition certain distance ahead of the working face. The purpose of this paper is to introduce mainl... Pre-geological prediction (PGP) is defined as the prediction of engineering geologic condition and hy-drogeological condition certain distance ahead of the working face. The purpose of this paper is to introduce mainlygeologic survey before and in excavation, to clarify their emphasis on PGP. At the same time, the technique is appliedto an engineering case, the longest highway tunnel in Gansu province. Data of geological survey of outside tunnels,sound wave detection, and geologic sketch for both tunnel face and sidewalls within the tunnel are analyzed. Afteranalyzing these data, long-term pre-geological prediction forecasting basic geological conditions of fault 4 such aslithology, scope, location, etc., and short-term and more accurate pre-geological prediction are reported. 展开更多
关键词 pre-geological prediction geologic survey tunnel construction
下载PDF
Non-coupled charge explosion and geo-mechanical dynamics
3
作者 Zhou Fengjun Li Xiaojun +1 位作者 Zhou Li Zheng Lei 《Engineering Sciences》 2012年第4期2-6,11,共6页
The non-coupled charge explosion and geo-mechanical dynamics problem in real air condition is studied in this paper. It analyzes and calculates the problem by using the real air state equations. Through researching on... The non-coupled charge explosion and geo-mechanical dynamics problem in real air condition is studied in this paper. It analyzes and calculates the problem by using the real air state equations. Through researching on the non-coupled charge rock bench blasting with big clearance of air, its result indicates that the borehole wall reflection overpressure is far higher than strength of rock, but much lower than detonation front pressure of the charge. So non-coupled charge explosion blasting engineering is very successful. Furthermore, it introduces the method of shaft forming by blasting once and the new tube room technology. And the non-coupled charge explosion is used successfully in the method of shaft forming by blasting once. As it drills and blasts in the top and removes the broken rock from the bottom tunnel, it increases the construction efficiency significantly. This paper has important reference on the improvement of the large-span underground engineering construction. 展开更多
关键词 non-coupled charge the real air state equations shock wave the method of shaft forming by blastingonce the new tube room technology
下载PDF