Taking the construction of PPP project of Guangzhou North Railway Station Comprehensive Transportation Hub as an example,the related measures of construction project quality management and cost control are discussed i...Taking the construction of PPP project of Guangzhou North Railway Station Comprehensive Transportation Hub as an example,the related measures of construction project quality management and cost control are discussed in detail,and it is hoped to have reference.展开更多
The turn-key construction project is implemented in Taiwan not by a single company but by a make-shift group of several companies. Hence,problems to coordinate the professional construction management (PCM) and the su...The turn-key construction project is implemented in Taiwan not by a single company but by a make-shift group of several companies. Hence,problems to coordinate the professional construction management (PCM) and the supervising architectural company often occur for the lack of long-term experience to work together. The various factors that affect the implementation of turn-key projects currently practiced in Taiwan are analyzed using the analytic network process (ANP). The objective is to study how the twelve key factors in the four layers of "Role assignment","Signing contract","Operational procedures" and "Losing capital investment" affect the progress of implementing the turn-key project in Taiwan. The results reveal that "Delay in payment" has the most negative influence with 15.62% weighing factor; "Latent risk" comes next with 11.14% weighing factor,and "Responsibility of construction company for project quality" is the third with 10.79% weighing factor.展开更多
Construction project management as an important branch of management science has its own characteristics; it was known as an important aspect of project management in the 21 st century. Construction companies now face...Construction project management as an important branch of management science has its own characteristics; it was known as an important aspect of project management in the 21 st century. Construction companies now face a more complex competitive environment and more powerful competitors. In order to compete for the market and living space, Enterprises should be in a strategic height, cultivate long- term competitive advantage. Cost management is a new tool to enhance the competitiveness of enterprises, Popularization and application of Construction project management to the scientific development of the project management made the following three aspects urgent requirement. First. establish a scientific system for the construction project management. Construction Project Management knowledge system is the foundation and needs for Construction Project Management scientific and professional.展开更多
After the completion of design, the construction project shall begin its implementation, which should be taken effective measures to strengthen the management of project cost and properly manage the funds to achieve t...After the completion of design, the construction project shall begin its implementation, which should be taken effective measures to strengthen the management of project cost and properly manage the funds to achieve the overall goal of the construction projects. Control of the project cost in the project implementation is mainly divided into bidding, contracting, construction and settlement. The following is the analysis and discussions of the author's experiences to the control of the project cost in the project implementation and the management measures.展开更多
That budget estimate exceeds estimate, budget exceeds budget estimate, and actual budget exceeds budget usually exists in the management of construction project cost, suggesting the cost management and control of cons...That budget estimate exceeds estimate, budget exceeds budget estimate, and actual budget exceeds budget usually exists in the management of construction project cost, suggesting the cost management and control of construction project are not the management and control of product cost in a general sense. In terms of construction project, cost management and control is the core of the project and is implemented throughout all stages of the project, so it is complicated system engineering. In this paper, construction project cost composition and its management measures are mainly discussed.展开更多
文摘Taking the construction of PPP project of Guangzhou North Railway Station Comprehensive Transportation Hub as an example,the related measures of construction project quality management and cost control are discussed in detail,and it is hoped to have reference.
文摘The turn-key construction project is implemented in Taiwan not by a single company but by a make-shift group of several companies. Hence,problems to coordinate the professional construction management (PCM) and the supervising architectural company often occur for the lack of long-term experience to work together. The various factors that affect the implementation of turn-key projects currently practiced in Taiwan are analyzed using the analytic network process (ANP). The objective is to study how the twelve key factors in the four layers of "Role assignment","Signing contract","Operational procedures" and "Losing capital investment" affect the progress of implementing the turn-key project in Taiwan. The results reveal that "Delay in payment" has the most negative influence with 15.62% weighing factor; "Latent risk" comes next with 11.14% weighing factor,and "Responsibility of construction company for project quality" is the third with 10.79% weighing factor.
文摘Construction project management as an important branch of management science has its own characteristics; it was known as an important aspect of project management in the 21 st century. Construction companies now face a more complex competitive environment and more powerful competitors. In order to compete for the market and living space, Enterprises should be in a strategic height, cultivate long- term competitive advantage. Cost management is a new tool to enhance the competitiveness of enterprises, Popularization and application of Construction project management to the scientific development of the project management made the following three aspects urgent requirement. First. establish a scientific system for the construction project management. Construction Project Management knowledge system is the foundation and needs for Construction Project Management scientific and professional.
文摘After the completion of design, the construction project shall begin its implementation, which should be taken effective measures to strengthen the management of project cost and properly manage the funds to achieve the overall goal of the construction projects. Control of the project cost in the project implementation is mainly divided into bidding, contracting, construction and settlement. The following is the analysis and discussions of the author's experiences to the control of the project cost in the project implementation and the management measures.
文摘That budget estimate exceeds estimate, budget exceeds budget estimate, and actual budget exceeds budget usually exists in the management of construction project cost, suggesting the cost management and control of construction project are not the management and control of product cost in a general sense. In terms of construction project, cost management and control is the core of the project and is implemented throughout all stages of the project, so it is complicated system engineering. In this paper, construction project cost composition and its management measures are mainly discussed.