Micro-seismic phenomena, occurring when rock masses are subjected to forces and failures, allow the determination of their unstable states and failure zones by analyzing micro-seismic signals. We first present the pri...Micro-seismic phenomena, occurring when rock masses are subjected to forces and failures, allow the determination of their unstable states and failure zones by analyzing micro-seismic signals. We first present the principles of micro-seismic monitoring and location, as well as an underground explosion-proof micro-seismic monitoring system. Given a practical engineering application, we describe the application of micro-seismic monitoring technology in determining the height of a "two-zone" overburden, i.e., a caving zone and a fracture zone, the width of a coal-pillar section and the depth of failure of a floor. The workfaces monitored accomplished safe and highly efficient mining based on our micro-seismic monitoring results and provide direct proof of the reliability and validity of micro-seismic monitoring technology.展开更多
Monitoring data from the Three Gorges Project show that the resulted tensile stresses are mainly distributed within the front section of the internal anchoring section which is often measuring 2.5 m in length. The com...Monitoring data from the Three Gorges Project show that the resulted tensile stresses are mainly distributed within the front section of the internal anchoring section which is often measuring 2.5 m in length. The composition of two early strength cement grout mixes marked as R_3350 and R_7350 was successfully developed to accelerate anchoring facilities installation and to reduce its intervention with the shiplock construction. It was measured that the ground water pH value in the sidewall slopes of the permanent navigation shiplock during the construction period was close to 8. Based on those characteristics it is concluded that the groundwater is weakly corrosive to steel material and will appear as non-corrosive to the steel wire strands embedded in the cement grout set. The advanced model of 3 MN unbonded anchor cables with double anti-corrosion protection(including the corrugated pipe) is developed to meet the needs of stabilizing the high sidewall rock slopes of the permanent navigation shiplock on the Three Gorges Project.展开更多
The general design and layout of the double-line five-step ship-lock,the water delivery technique for high head ship-lock,the key technical problems of fully lined ship-lock and the monitoring techniques for large-sca...The general design and layout of the double-line five-step ship-lock,the water delivery technique for high head ship-lock,the key technical problems of fully lined ship-lock and the monitoring techniques for large-scale miter gates and hoisting equipment under complicated operation conditions of Three Gorges Project (TGP) are introduced.Since the operation of ship-lock in 2003,the operation practice has proved that the design techniques are advanced,rational and reliable.The design and construction of the fully lined ship-lock promotes the development of design theory and practice of ship-lock projects,which makes the construction technology of ship-lock in the world reach a new level.展开更多
The present situation of lacking fast and effective coal and gas outburst prediction techniques will lead to long out- burst prevention cycles and poor accurate prediction effects and slows down coal roadway drive spe...The present situation of lacking fast and effective coal and gas outburst prediction techniques will lead to long out- burst prevention cycles and poor accurate prediction effects and slows down coal roadway drive speed seriously. Also, due to historical and economic reasons, some coal mines in China are equipped with poor safety equipment, and the staff professional capability is low. What's worse, artificial and mine geological conditions have great influences on the traditional technologies of coal and gas outburst prediction. Therefore, seeking a new fast and efficient coal and gas outburst prediction method is nec- essary. By using system engineering theory, combined with the current mine production conditions and based on the coal and gas outburst composite hypothesis, a coal and gas outburst spatiotemporal forecasting system was established. This system can guide forecasting work schedule, optimize prediction technologies, carry out step-by-step prediction and eliminate hazard hier- archically. From the point of view of application, the proposed system improves the prediction efficiency and accuracy. On this basis, computational intelligence methods to construct disaster information analysis platform were used. Feed-back results pro- vide decision support to mine safety supervisors.展开更多
基金supported by the National Basic Research Program of China (No. 2010CB226805)the National Natural Science Foundation of China (No. 50874103)+1 种基金the State Laboratory Fund (No. SKLGDUEK0905)the Talent Introduction Fund of Anhui University of Science & Technology
文摘Micro-seismic phenomena, occurring when rock masses are subjected to forces and failures, allow the determination of their unstable states and failure zones by analyzing micro-seismic signals. We first present the principles of micro-seismic monitoring and location, as well as an underground explosion-proof micro-seismic monitoring system. Given a practical engineering application, we describe the application of micro-seismic monitoring technology in determining the height of a "two-zone" overburden, i.e., a caving zone and a fracture zone, the width of a coal-pillar section and the depth of failure of a floor. The workfaces monitored accomplished safe and highly efficient mining based on our micro-seismic monitoring results and provide direct proof of the reliability and validity of micro-seismic monitoring technology.
文摘Monitoring data from the Three Gorges Project show that the resulted tensile stresses are mainly distributed within the front section of the internal anchoring section which is often measuring 2.5 m in length. The composition of two early strength cement grout mixes marked as R_3350 and R_7350 was successfully developed to accelerate anchoring facilities installation and to reduce its intervention with the shiplock construction. It was measured that the ground water pH value in the sidewall slopes of the permanent navigation shiplock during the construction period was close to 8. Based on those characteristics it is concluded that the groundwater is weakly corrosive to steel material and will appear as non-corrosive to the steel wire strands embedded in the cement grout set. The advanced model of 3 MN unbonded anchor cables with double anti-corrosion protection(including the corrugated pipe) is developed to meet the needs of stabilizing the high sidewall rock slopes of the permanent navigation shiplock on the Three Gorges Project.
文摘The general design and layout of the double-line five-step ship-lock,the water delivery technique for high head ship-lock,the key technical problems of fully lined ship-lock and the monitoring techniques for large-scale miter gates and hoisting equipment under complicated operation conditions of Three Gorges Project (TGP) are introduced.Since the operation of ship-lock in 2003,the operation practice has proved that the design techniques are advanced,rational and reliable.The design and construction of the fully lined ship-lock promotes the development of design theory and practice of ship-lock projects,which makes the construction technology of ship-lock in the world reach a new level.
文摘The present situation of lacking fast and effective coal and gas outburst prediction techniques will lead to long out- burst prevention cycles and poor accurate prediction effects and slows down coal roadway drive speed seriously. Also, due to historical and economic reasons, some coal mines in China are equipped with poor safety equipment, and the staff professional capability is low. What's worse, artificial and mine geological conditions have great influences on the traditional technologies of coal and gas outburst prediction. Therefore, seeking a new fast and efficient coal and gas outburst prediction method is nec- essary. By using system engineering theory, combined with the current mine production conditions and based on the coal and gas outburst composite hypothesis, a coal and gas outburst spatiotemporal forecasting system was established. This system can guide forecasting work schedule, optimize prediction technologies, carry out step-by-step prediction and eliminate hazard hier- archically. From the point of view of application, the proposed system improves the prediction efficiency and accuracy. On this basis, computational intelligence methods to construct disaster information analysis platform were used. Feed-back results pro- vide decision support to mine safety supervisors.