期刊文献+
共找到5篇文章
< 1 >
每页显示 20 50 100
工民建工程的质量检测浅析
1
作者 古丽加汗·克衣木 《城市建设(下旬)》 2011年第3期118-118,共1页
随着近年来全民质量意识的不断提高和科技的不断进步,我国工民建的工程质量总体水平稳步提升,但仍然存在着这样哪样的问题,工民建质量事故依然层不穷,直接影响到我们社会的发展。在这样的形势下,就更要求建设单位重视工程质量的检... 随着近年来全民质量意识的不断提高和科技的不断进步,我国工民建的工程质量总体水平稳步提升,但仍然存在着这样哪样的问题,工民建质量事故依然层不穷,直接影响到我们社会的发展。在这样的形势下,就更要求建设单位重视工程质量的检测,通过各种质量检测手向社会提供科学,准确,公正的检测数据,并以此为依据高效合理地对工民建工程行管理控制。 展开更多
关键词 工民 工程行管理 控制
下载PDF
Upper Lillooet River Hydroelectric Project: The Challenges of Constructing a Power Tunnel for Run-of-River Hydro Projects in Mountainous British Columbia 被引量:1
2
作者 Nichole Boultbee Oliver Robson +1 位作者 Serge Moalli Rich Humphries 《Engineering》 2018年第2期96-102,共7页
The Upper Lillooet River Hydroelectric Project (ULHP) is a run-of-river power generation scheme located near Pemberton, British Columbia, Canada, consisting of two separate hydroelectric facilities (HEFs) with a c... The Upper Lillooet River Hydroelectric Project (ULHP) is a run-of-river power generation scheme located near Pemberton, British Columbia, Canada, consisting of two separate hydroelectric facilities (HEFs) with a combined capacity of 106.7 MW. These HEFs are owned by the Upper Lillooet River Power Limited Partnership and the Boulder Creek Power Limited Partnership, and civil and tunnel construction was completed by CRT-ebc. The Upper Lillooet River HEF includes the excavation ofa 6 m wide by 5.5 m high and approximately 2500 m long tunnel along the Upper Lillooet River Valley. The project is in a moun- tainous area; severe restrictions imposed by weather conditions and the presence of sensitive wildlife species constrained the site operations in order to limit environmental impacts. The site is adjacent to the Mount Meager Volcanic Complex, the most recently active volcano in Western Canada. Tunneling conditions were very challenging, including a section through deposits associated with the most recent eruption from Mount Meager Volcanic Complex (-2360 years before the present). This tunnel section included welded breccia and unconsolidated deposits composed of loose pumice, organics (that represent an old forest floor), and till, before entering the underlying tonalite bedrock. The construction of this section of the tunnel required cover grouting, umbrella support, and excavation with a combination of road header, hydraulic hammer, and drilling-and-blasting method. This paper provides an overview of the project, a summary of the key design and construction schedule challenges, and a description of the successful excavation of the tunnel through deposits associated with the recent volcanic activity. 展开更多
关键词 Run-of-river hydro project Power tunnel Umbrella support Canopy tubes Volcanic depositsPumiceRoadheader Environmental constraints
下载PDF
A novel method of photographic geological logging based on parallel image sequence in small tunnel
3
作者 毛羽丰 李浩 +2 位作者 何燕兰 杨彪 吴铭飞 《Journal of Central South University》 SCIE EI CAS CSCD 2016年第8期2092-2100,共9页
Small tunnels such as engineering geological exploratory tunnels and mine roadways are generally narrow, which make the existing photographic geological logging technique inapplicable. Therefore, geological logging of... Small tunnels such as engineering geological exploratory tunnels and mine roadways are generally narrow, which make the existing photographic geological logging technique inapplicable. Therefore, geological logging of exploratory tunnels has always been taking the method of manual sketch work which has low efficiency and poor informatization degree of products, and it is a technical issue requiring urgent settlement for geological logging of small tunnels. This paper proposes and studies novel methods of photographic geological logging suitable for small tunnels, including image acquisition, image orientation control, image geometric correction, unfolded image map generation and geological attitude measurement, etc. Experiments show that the method can meet the precision requirement of geological logging. The novel method helps to realize the fast acquisition and processing of image-based geological logging data for small tunnels, and the forms of logging result are more abundant and more applicable to informatized management and application of geological logging data. 展开更多
关键词 close-range photogrammetry TUNNEL image correction photographic geological logging
下载PDF
The Need for Building Science Education
4
作者 Joseph Laquatra 《Journal of Civil Engineering and Architecture》 2015年第7期775-779,共5页
As the demand for high-performance housing grows, so does the need for improvements in building science education. Trial and error has long been the method for learning how to avoid problems in the construction of ene... As the demand for high-performance housing grows, so does the need for improvements in building science education. Trial and error has long been the method for learning how to avoid problems in the construction of energy-efficient housing, including water intrusion and mold growth. Building codes have addressed these issues in prescriptive ways that were not evidence-based. Stricter building codes or builder licensing requirements are not necessarily the solutions to problems associated with misunderstandings about building science. Motivating professionals currently involved in the housing industry to learn through continuing education is a start, but the core problem must be addressed by including building science education in curricula related to architecture, engineering, construction management and other fields. The long-term solution is to include building science education in academic construction management programs. The purpose of this paper is to review the history of what has come to be known as building science and its importance to the residential construction industry. Problems that result from a lack of knowledge about the field are covered and a potential solution is proposed. 展开更多
关键词 Building science education high-performance housing academic programs.
下载PDF
Application of Management Information System Planning in Concurrent Engineering for Wooden Furniture Industry
5
作者 Sakkarin Choodoung Uttapol Smutkupt 《Chinese Business Review》 2013年第2期124-130,共7页
This research is a development in management information system (MIS) planning based on operation analysis and development according to concurrent engineering approach and reestablishment of database management. Acc... This research is a development in management information system (MIS) planning based on operation analysis and development according to concurrent engineering approach and reestablishment of database management. According to our case study industry, such industry currently used traditional network systems such as LAN, and "Bus Network" Network Topology. Client/Server distributed computing has a problem with database management in data redundancy, data inconsistency, and data independency. For Network Topology, Bus Network has problem with multitasking since the network are able to handle only a set of data at a time so the traffic problem will occur when multiple users request for the service. Thus, such condition is inconsistent with concurrent engineering which must be able to access the data simultaneously. As a consequence, this study develops a network system, network system of working system, using LAN and "Star Network" network topology. The file server processing distributed is an application while database is stored in host computer or file server but the data will be processed in users' computer. When the user needs to access the data, file server will send it to the user and the user can further analysis or manage such data in the user computer, so called "Hierarchical Database Model". Hierarchical database structure is easily developed like general organization command structure with different level of responsibility. In details, the data level in the database is divided into three levels including DBI, DB2, and DB3, so development of simultaneously systemic flow and access of various critical data is performed in parallel. Furthermore, this is consistent with access of all three data levels including: Level 1 is overall dataflow of both inside and outside the organization; Level 2 is dataflow of each division in the organization; and Level 3 is dataflow of subunit in each division in the organization. After systemize flow and access of data with concurrent engineering as mentioned, it provided optimal efficiency in the whole production system management reducing loss in the whole system of the organization 展开更多
关键词 management information system concurrent engineering wooden furniture
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部