Deformation modulus of a rock mass(E_m) is one of the most important design parameters in construction of rock engineering projects such as underground excavations.However,difficulties are frequently encountered durin...Deformation modulus of a rock mass(E_m) is one of the most important design parameters in construction of rock engineering projects such as underground excavations.However,difficulties are frequently encountered during in-situ tests which are also time-consuming and expensive for determining this parameter.Although E_m is often estimated indirectly from proposed equations by different researchers,many of these equations cannot be used in case of problematic rock conditions(thinly bedded,highly jointed rock masses,etc.) as high quality core samples are required.This study aims to explore more practical and useful equation for E_m estimation using Rock Quality Designation(RQD) and point load index values.Comparisons were made between available empirical equations and the proposed E_m equation in terms of the estimation capacity.Multiple comparison tests(ANOVA) showed that E_m can be reliably estimated using proposed equation especially at the preliminary stages of projects.展开更多
In the ISO9000"input-output"process model,the concept of process quality is difficult to get the correct interpretation. From the"white box"theory of process,this paper puts forward the scientific ...In the ISO9000"input-output"process model,the concept of process quality is difficult to get the correct interpretation. From the"white box"theory of process,this paper puts forward the scientific meaning of the concept of process quality and the process quality model by taking the basic operating unit of 6M1E in the railway construction project for example. The basic operating unit system consists of technological natural process,operation process and management process;the process quality of the basic operating unit system depends on the interrelation and interaction among those three sub-processes,and also subjects to the impact of the external disturbance input factors. Finally,the cast-in-situ prestressed concrete continuous box girder construction process is utilized to elaborate the specific application of this theory in the quality management of the railway construction project.展开更多
In order to improve the efficiency in management of public work projects, screening and controlling influencing factors affecting the quality of a public work project is essential. This study synthesized 9 influential...In order to improve the efficiency in management of public work projects, screening and controlling influencing factors affecting the quality of a public work project is essential. This study synthesized 9 influential categories including 91 factors related to quality management of public works in Taiwan using a sequential analysis procedure. According to the Borda-values of influencing factors obtained from a first stage questionnaire, the number of primary factors selected by the re-sponsible entities and the design-supervisory entities were 44 and 45 respectively. A Fuzzy Analytic Hierarchy Process (FAHP) was used to prioritize and rank these factors. The top five factors ranked by the responsible entities were (1) introduction of the earned value analysis, (2) working efficiency, (3) environmental laws and regulations, (4) price-index fluctuation, and (5) on-site safety management. The top five factors ranked by the design-supervisory entities were (1) man power, (2) laws and regulations, (3) price-index fluctuation, (4) traffic conditions, and (5) faulty design.展开更多
Realistic models for saturation, capillary pressure and relative permeability s-p_c-kr relations are essential for accurate predictions in multiphase flow simulations. The primary object of this work is to investigate...Realistic models for saturation, capillary pressure and relative permeability s-p_c-kr relations are essential for accurate predictions in multiphase flow simulations. The primary object of this work is to investigate their influence on geological CO_2 sequestration processes. In this work, the hysteresis effects on simulation results predicting geological CO_2 storage are investigated on a synthetic 2D model and a geological setting built according to Aneth demonstration site. Simulation results showed that hysteretic relative permeability model should be included while the residual trapping mechanism is under investigation. The effects of hysteresis and WAG schemes were studied with a series of numerical simulations on a geological setting based on Aneth site. Our simulations demonstrate that the hysteresis effect is strong on residual trapping mechanisms and there is no significant effects of alternative WAG schemes for long term residual trapping in our conceptual model. The effects of WAG schemes and hysteresis are weak on dissolution trapping mechanisms.展开更多
With rapid development of PetroChina's Qinghai Oilfield, engineering construction quality becomes more and more important in infrastructure construction of the oilfield. Generally speaking, engineering construction q...With rapid development of PetroChina's Qinghai Oilfield, engineering construction quality becomes more and more important in infrastructure construction of the oilfield. Generally speaking, engineering construction quality is related both to national economic development and safety of people and assets. To turn a design map into a materialized object, the construction project involves a large number of elements, such as design, materials, machinery, landform, geological factors, meteorological factors, construction process, technological measures and supervision system. Therefore, quality control holds the key to a construction project.展开更多
This research management, exp and lores preliminarily the practices of quality management, management commitment in quality quality management implementation problems in construction projects in the context of Malaysi...This research management, exp and lores preliminarily the practices of quality management, management commitment in quality quality management implementation problems in construction projects in the context of Malaysian construction industry. The research applies semi-structured interview approach with twelve project management practitioners. The findings of the study indicate that the state of quality management in construction projects in Malaysia needs to be strengthened and there are problems in relation to quality management implementation that require attention and further research. The paper provides an insight on the state of quality management in construction projects in Malaysia.展开更多
基金the Karadeniz Technical University (KTU)for funding this work through the research(No.9706)
文摘Deformation modulus of a rock mass(E_m) is one of the most important design parameters in construction of rock engineering projects such as underground excavations.However,difficulties are frequently encountered during in-situ tests which are also time-consuming and expensive for determining this parameter.Although E_m is often estimated indirectly from proposed equations by different researchers,many of these equations cannot be used in case of problematic rock conditions(thinly bedded,highly jointed rock masses,etc.) as high quality core samples are required.This study aims to explore more practical and useful equation for E_m estimation using Rock Quality Designation(RQD) and point load index values.Comparisons were made between available empirical equations and the proposed E_m equation in terms of the estimation capacity.Multiple comparison tests(ANOVA) showed that E_m can be reliably estimated using proposed equation especially at the preliminary stages of projects.
基金Key Subject of Ministry of Railway Technology Research and Development Program(No.2011G010-D)Central University Funds for Basic Research(No.SWJTU12ZT12)
文摘In the ISO9000"input-output"process model,the concept of process quality is difficult to get the correct interpretation. From the"white box"theory of process,this paper puts forward the scientific meaning of the concept of process quality and the process quality model by taking the basic operating unit of 6M1E in the railway construction project for example. The basic operating unit system consists of technological natural process,operation process and management process;the process quality of the basic operating unit system depends on the interrelation and interaction among those three sub-processes,and also subjects to the impact of the external disturbance input factors. Finally,the cast-in-situ prestressed concrete continuous box girder construction process is utilized to elaborate the specific application of this theory in the quality management of the railway construction project.
文摘In order to improve the efficiency in management of public work projects, screening and controlling influencing factors affecting the quality of a public work project is essential. This study synthesized 9 influential categories including 91 factors related to quality management of public works in Taiwan using a sequential analysis procedure. According to the Borda-values of influencing factors obtained from a first stage questionnaire, the number of primary factors selected by the re-sponsible entities and the design-supervisory entities were 44 and 45 respectively. A Fuzzy Analytic Hierarchy Process (FAHP) was used to prioritize and rank these factors. The top five factors ranked by the responsible entities were (1) introduction of the earned value analysis, (2) working efficiency, (3) environmental laws and regulations, (4) price-index fluctuation, and (5) on-site safety management. The top five factors ranked by the design-supervisory entities were (1) man power, (2) laws and regulations, (3) price-index fluctuation, (4) traffic conditions, and (5) faulty design.
基金partly supported by scientific research fund SK201413 and YK201501 from Chinese Academy of Geological SciencesProject DEFOA-0000033 from U.S.Department of Energy
文摘Realistic models for saturation, capillary pressure and relative permeability s-p_c-kr relations are essential for accurate predictions in multiphase flow simulations. The primary object of this work is to investigate their influence on geological CO_2 sequestration processes. In this work, the hysteresis effects on simulation results predicting geological CO_2 storage are investigated on a synthetic 2D model and a geological setting built according to Aneth demonstration site. Simulation results showed that hysteretic relative permeability model should be included while the residual trapping mechanism is under investigation. The effects of hysteresis and WAG schemes were studied with a series of numerical simulations on a geological setting based on Aneth site. Our simulations demonstrate that the hysteresis effect is strong on residual trapping mechanisms and there is no significant effects of alternative WAG schemes for long term residual trapping in our conceptual model. The effects of WAG schemes and hysteresis are weak on dissolution trapping mechanisms.
文摘With rapid development of PetroChina's Qinghai Oilfield, engineering construction quality becomes more and more important in infrastructure construction of the oilfield. Generally speaking, engineering construction quality is related both to national economic development and safety of people and assets. To turn a design map into a materialized object, the construction project involves a large number of elements, such as design, materials, machinery, landform, geological factors, meteorological factors, construction process, technological measures and supervision system. Therefore, quality control holds the key to a construction project.
文摘This research management, exp and lores preliminarily the practices of quality management, management commitment in quality quality management implementation problems in construction projects in the context of Malaysian construction industry. The research applies semi-structured interview approach with twelve project management practitioners. The findings of the study indicate that the state of quality management in construction projects in Malaysia needs to be strengthened and there are problems in relation to quality management implementation that require attention and further research. The paper provides an insight on the state of quality management in construction projects in Malaysia.