Taking the construction of PPP project of Guangzhou North Railway Station Comprehensive Transportation Hub as an example,the related measures of construction project quality management and cost control are discussed i...Taking the construction of PPP project of Guangzhou North Railway Station Comprehensive Transportation Hub as an example,the related measures of construction project quality management and cost control are discussed in detail,and it is hoped to have reference.展开更多
Engineering project management refers to the management through the whole process of engineering construction, including quality, time project time limit, safety, cost, environmental protection, and innovation, etc. T...Engineering project management refers to the management through the whole process of engineering construction, including quality, time project time limit, safety, cost, environmental protection, and innovation, etc. The most important thing for construction enterprises to improve market competitiveness is to reduce enterprise costs by decreasing resource consumption in the construction, and control the consumptions within the project budget.展开更多
In the current economic situation, strengthening the contract management of the construction cost has a beautifully role. At the same time, according to construction project cost management, the scientific management ...In the current economic situation, strengthening the contract management of the construction cost has a beautifully role. At the same time, according to construction project cost management, the scientific management of the contract, can promote the reasonable and balanced investment cost allocation in the quality and safety and other aspects of the project, so that the construction project can obtain higher added value, and to further promote China' s economic construction and accelerate the pace of the city. This paper first briefly elaborates our construction project cost of the contract management on the present situation, and some problems are analyzed and discussed, and then puts forward some suggestions on the measures and countermeasures for cost management of construction engineering contract.展开更多
Cost estimation has its proven importance as one of essential factors for project success. The aim of this research is to predict the early project cost using neural network. Early project cost represents a key compon...Cost estimation has its proven importance as one of essential factors for project success. The aim of this research is to predict the early project cost using neural network. Early project cost represents a key component in business unit decisions. The most important factors influencing on the parametric cost estimation in construction building projects in Gaza Strip were defined and investigated. A questionnaire survey and relative index ranking technique were used to conclude the most important factors. Fourteen most effective factors were identified. One hundred and six case studies from real executed construction project in Gaza Strip were collected for training and testing the model. The cases were prepared to be used in cost estimate neural networks model. Eighty percent of case studies were used to train and test the model. The remaining 20% was used for model verification. The results revealed the ability to the model to predict cost estimate to an acceptable degree of accuracy. The minimum squares error with 0.005 in training stage and 0.021 in testing stage were recorded.展开更多
Construction project management as an important branch of management science has its own characteristics; it was known as an important aspect of project management in the 21 st century. Construction companies now face...Construction project management as an important branch of management science has its own characteristics; it was known as an important aspect of project management in the 21 st century. Construction companies now face a more complex competitive environment and more powerful competitors. In order to compete for the market and living space, Enterprises should be in a strategic height, cultivate long- term competitive advantage. Cost management is a new tool to enhance the competitiveness of enterprises, Popularization and application of Construction project management to the scientific development of the project management made the following three aspects urgent requirement. First. establish a scientific system for the construction project management. Construction Project Management knowledge system is the foundation and needs for Construction Project Management scientific and professional.展开更多
That budget estimate exceeds estimate, budget exceeds budget estimate, and actual budget exceeds budget usually exists in the management of construction project cost, suggesting the cost management and control of cons...That budget estimate exceeds estimate, budget exceeds budget estimate, and actual budget exceeds budget usually exists in the management of construction project cost, suggesting the cost management and control of construction project are not the management and control of product cost in a general sense. In terms of construction project, cost management and control is the core of the project and is implemented throughout all stages of the project, so it is complicated system engineering. In this paper, construction project cost composition and its management measures are mainly discussed.展开更多
After the completion of design, the construction project shall begin its implementation, which should be taken effective measures to strengthen the management of project cost and properly manage the funds to achieve t...After the completion of design, the construction project shall begin its implementation, which should be taken effective measures to strengthen the management of project cost and properly manage the funds to achieve the overall goal of the construction projects. Control of the project cost in the project implementation is mainly divided into bidding, contracting, construction and settlement. The following is the analysis and discussions of the author's experiences to the control of the project cost in the project implementation and the management measures.展开更多
One of the most important tasks of security is the quality of the project substation substation construction project management, construction project management, including project bidding and engineering, electrical e...One of the most important tasks of security is the quality of the project substation substation construction project management, construction project management, including project bidding and engineering, electrical engineering and civil construction, engineering, quality control, safety management and supervision costs control, on-site supervision over the links, these links chain, indivisible, so long as a part of the management problems, will lead the entire construction project management effectiveness be affected, so it must be every link control and management work done, in order to guarantee the quality of the entire substation, in order to make security of supply substations, electrical safety and vital interests of users are protected. In this paper, the author details the three aspects substation construction management of the project, namely the concept of substation engineering, project management and construction safety, through these three aspects, the author analyzes the construction project management substation existing problems, To solve these problems and issues proposed some measures and construction process that need attention. It launched separately from the design, schedule, quality and other aspects of security and research, and in the course of the study stressed the importance of coordination between elements of construction and construction sectors as well as cooperation between the construction, explains the importance of the project cost control.展开更多
Internal quality audits are a key activity in the quality management ofoil projects.Quality management aims at meeting project quality requirements,coordinatingproject progress,assisting in controlling project costs,a...Internal quality audits are a key activity in the quality management ofoil projects.Quality management aims at meeting project quality requirements,coordinatingproject progress,assisting in controlling project costs,and realizing continuousimprovement in project quality management.展开更多
文摘Taking the construction of PPP project of Guangzhou North Railway Station Comprehensive Transportation Hub as an example,the related measures of construction project quality management and cost control are discussed in detail,and it is hoped to have reference.
文摘Engineering project management refers to the management through the whole process of engineering construction, including quality, time project time limit, safety, cost, environmental protection, and innovation, etc. The most important thing for construction enterprises to improve market competitiveness is to reduce enterprise costs by decreasing resource consumption in the construction, and control the consumptions within the project budget.
文摘In the current economic situation, strengthening the contract management of the construction cost has a beautifully role. At the same time, according to construction project cost management, the scientific management of the contract, can promote the reasonable and balanced investment cost allocation in the quality and safety and other aspects of the project, so that the construction project can obtain higher added value, and to further promote China' s economic construction and accelerate the pace of the city. This paper first briefly elaborates our construction project cost of the contract management on the present situation, and some problems are analyzed and discussed, and then puts forward some suggestions on the measures and countermeasures for cost management of construction engineering contract.
文摘Cost estimation has its proven importance as one of essential factors for project success. The aim of this research is to predict the early project cost using neural network. Early project cost represents a key component in business unit decisions. The most important factors influencing on the parametric cost estimation in construction building projects in Gaza Strip were defined and investigated. A questionnaire survey and relative index ranking technique were used to conclude the most important factors. Fourteen most effective factors were identified. One hundred and six case studies from real executed construction project in Gaza Strip were collected for training and testing the model. The cases were prepared to be used in cost estimate neural networks model. Eighty percent of case studies were used to train and test the model. The remaining 20% was used for model verification. The results revealed the ability to the model to predict cost estimate to an acceptable degree of accuracy. The minimum squares error with 0.005 in training stage and 0.021 in testing stage were recorded.
文摘Construction project management as an important branch of management science has its own characteristics; it was known as an important aspect of project management in the 21 st century. Construction companies now face a more complex competitive environment and more powerful competitors. In order to compete for the market and living space, Enterprises should be in a strategic height, cultivate long- term competitive advantage. Cost management is a new tool to enhance the competitiveness of enterprises, Popularization and application of Construction project management to the scientific development of the project management made the following three aspects urgent requirement. First. establish a scientific system for the construction project management. Construction Project Management knowledge system is the foundation and needs for Construction Project Management scientific and professional.
文摘That budget estimate exceeds estimate, budget exceeds budget estimate, and actual budget exceeds budget usually exists in the management of construction project cost, suggesting the cost management and control of construction project are not the management and control of product cost in a general sense. In terms of construction project, cost management and control is the core of the project and is implemented throughout all stages of the project, so it is complicated system engineering. In this paper, construction project cost composition and its management measures are mainly discussed.
文摘After the completion of design, the construction project shall begin its implementation, which should be taken effective measures to strengthen the management of project cost and properly manage the funds to achieve the overall goal of the construction projects. Control of the project cost in the project implementation is mainly divided into bidding, contracting, construction and settlement. The following is the analysis and discussions of the author's experiences to the control of the project cost in the project implementation and the management measures.
文摘One of the most important tasks of security is the quality of the project substation substation construction project management, construction project management, including project bidding and engineering, electrical engineering and civil construction, engineering, quality control, safety management and supervision costs control, on-site supervision over the links, these links chain, indivisible, so long as a part of the management problems, will lead the entire construction project management effectiveness be affected, so it must be every link control and management work done, in order to guarantee the quality of the entire substation, in order to make security of supply substations, electrical safety and vital interests of users are protected. In this paper, the author details the three aspects substation construction management of the project, namely the concept of substation engineering, project management and construction safety, through these three aspects, the author analyzes the construction project management substation existing problems, To solve these problems and issues proposed some measures and construction process that need attention. It launched separately from the design, schedule, quality and other aspects of security and research, and in the course of the study stressed the importance of coordination between elements of construction and construction sectors as well as cooperation between the construction, explains the importance of the project cost control.
文摘Internal quality audits are a key activity in the quality management ofoil projects.Quality management aims at meeting project quality requirements,coordinatingproject progress,assisting in controlling project costs,and realizing continuousimprovement in project quality management.