急倾斜较薄特厚煤层巷柱-综采放顶煤开采技术 被引量:3
1
作者 张戈 陈健 郭志强 《煤矿现代化》 2009年第4期95-97,共3页
综合我国急倾斜煤层水平分层综采放顶煤和水平分段巷柱式放顶煤两种采煤方法的技术优点,提出在厚度10~20m的急倾斜煤层内使用”巷柱-综采放顶煤”开采技术。介绍了该采煤方法的巷道布置、通风系统、回采工艺,以及阶段高度确定、煤层... 综合我国急倾斜煤层水平分层综采放顶煤和水平分段巷柱式放顶煤两种采煤方法的技术优点,提出在厚度10~20m的急倾斜煤层内使用”巷柱-综采放顶煤”开采技术。介绍了该采煤方法的巷道布置、通风系统、回采工艺,以及阶段高度确定、煤层弱化、防灭火等关键技术。 展开更多
关键词 急倾斜 综采 巷柱 巷柱-综采放顶煤 方法
下载PDF
Trial of small gateroad pillar in top coal caving longwall mining of large mining height 被引量:8
2
作者 Li Huamin Syd Peng +4 位作者 Li Huigui Xu Yongxiang Yuan Ruifu Yue Shuaishuai Li Kun 《International Journal of Mining Science and Technology》 SCIE EI CSCD 2016年第1期139-147,共9页
Coal seams in Tashan Mine of Datong Coal Group in China average 15 m thick and have been mined by the top coal caving longwall mining method of large mining height. Mining height was 3.8 m and the top coal caving heig... Coal seams in Tashan Mine of Datong Coal Group in China average 15 m thick and have been mined by the top coal caving longwall mining method of large mining height. Mining height was 3.8 m and the top coal caving height was 11.2 m. The gateroad pillar between panels was 38 m. During retreat mining,serious bumps occurred in the gateroads on both sides of the pillar affecting safety production. Therefore,pillarless mining was experimented. Using numerical modeling and comparative study of cases of similar mining condition,it was decided to employ a 6 m wide pillar,rather than the previous 38 m wide pillar.Support system for the gateroads was designed and implemented. During gateroad development,pillar failure conditions and entry deformation were monitored. Hydraulic fracturing method was employed to cut off the K3 sandstone along the entry rib so as to reduce the abutment pressure induced during retreat mining. Support reinforcement method combining grouting and advanced reinforcement methods was proposed to insure stable gateroad ahead of mining. Methane drainage and nitrogen injection were implemented to eliminate hazards associated with mine fire and spontaneous combustion. Since the development of gateroad has just completed,and retreat mining has not begun,the effectiveness of the proposed methods is unknown at this point. However,monitoring will continue until after mining.The results will be published in a separate paper. 展开更多
关键词 Large mining heightSmall gateroad pillarTop coal caving longwall miningHydraulic fracturingGob-side entry driving
下载PDF