期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
联想TOP10之问
1
作者 博客中国 《软件工程师》 2004年第5期18-22,共5页
习惯了激昂的高速增长的联想,已经陷入长达两年的胶着和停滞。这两年,是中国企业开始显露国际竞争力的两年,在最困难的情况下,华为、TCL等公司业已开始强劲地逆势而上,可是联想的四处突围仍然显得十分茫然,团队的士气和业绩也都明显进... 习惯了激昂的高速增长的联想,已经陷入长达两年的胶着和停滞。这两年,是中国企业开始显露国际竞争力的两年,在最困难的情况下,华为、TCL等公司业已开始强劲地逆势而上,可是联想的四处突围仍然显得十分茫然,团队的士气和业绩也都明显进入了负循环;这两年,是进入WTO之后,跨国IT企业适应、调整和蓄势待发的两年,可是联想仍然没有做好打更艰苦的战争的准备;这两年,是全球IT行业转折的两年,整个产业即将进入新的大发展阶段,可是联想的未来方向依然不确定,新的突破点也依旧不那么明晰……现在,联想成为第一个加入奥运TOP10计划的中国企业,在为联想欢呼鼓舞的同时,我们不禁思考TOP10计划能为联想带来什么?这一宏大的计划能否启动联想新的发展引擎?联想的成功勿容置疑,但质疑联想的一些不足,也并不会对联想已有的成就造成任何损害,相反,只会使联想的形象更加客观、更加真实,只会使联想人的心态更加坦然、更加平和,只会使联想走进一片更广阔的天地。接近和呈现这些问题本身,为联想的发展解放思想,为中国IT业发展获得新思维,就是我们争论的意愿、价值和意义所在。 展开更多
关键词 IT行业 联想集团 发展战略 市场策路 TOP10
下载PDF
Aspects of Railway Capacity and Occupation Time Estimation
2
作者 Jozef Gasparik Vladislav Zitricky 《Journal of Civil Engineering and Architecture》 2014年第3期322-331,共10页
The priority of the EU transport policy in railway sector is to open up the railway market. The objective is to provide railway undertakings with access to the railway network on equal terms. The main problem is deter... The priority of the EU transport policy in railway sector is to open up the railway market. The objective is to provide railway undertakings with access to the railway network on equal terms. The main problem is determining the infrastructure capacity. A variety of methodologies are used across Europe for the capacity estimation of railway infrastructure. This diversity has forced railway infrastructure managers to seek a new, common methodology. The UIC methodology is an easy way to calculate the capacity consumption. However, there the possibility to expound this methodology in different ways, which can result in different capacity consumptions. There isan advantage to improve this methodology and to set a clear and unified method of occupation time estimation. The fundamental improvement to UIC methodology is the definition of the occupation time by the trains. This paper gives a description of Slovak and UIC methodologies as a basis for a newly developed approach. The new way of estimation of the capacity consumption (occupation time) is based on a graphic approach. The new methodology concerns the estimation of the infrastructure occupation time and is a conceptual framework developed by the authors for an easier evaluation of occupation time in train traffic diagrams. The new methodology makes the UIC methodology more usable and enables more exact results to be obtained from infrastructure capacity examination. 展开更多
关键词 Methodology for capacity estimation train traffic diagram occupation square occupation rate buffer time.
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部