A bidding model of neural network was presented to pursue the largest benefit according to the policy of separating power plants from network and bidding transaction. This model bases on the cost of power plant and it...A bidding model of neural network was presented to pursue the largest benefit according to the policy of separating power plants from network and bidding transaction. This model bases on the cost of power plant and its research object is a power plant in the market. The market clearing price (MCP) can be predicted and an optimized load curve can be decided in this model. The model may provide technical support for the power plant.展开更多
In many electrical grids worldwide, the rising amount of installed PV (photovoltaic) power entails a considerable influence of PV systems on grid quality and stability. Consequently, in the wake of the revised Germa...In many electrical grids worldwide, the rising amount of installed PV (photovoltaic) power entails a considerable influence of PV systems on grid quality and stability. Consequently, in the wake of the revised German medium voltage directives issued in 2009, new requirements for PV inverters have been established internationally. At Fraunhofer ISE's Inverter Laboratory, approximately 25 large PV inverters with a nominal power of up to 880 kVA have been characterized in the past three years. In this period, the focus of many inverter manufacturers has begun to shift from traditional European markets towards an international perspective. Therefore, experiences with numerous different grid codes have been gained by our team. This work summarizes the similarities and differences between these grid codes. Additionally, several requirements that have proved to be critical will be examined. Finally, the adequacy of these grid codes to guarantee the safe and reliable operation of electrical grids is discussed.展开更多
At present, electricity price to grid of domestic power plants is priced by the national administration based on the policy of "one power plant with one electricity price to grid," which is difficult to real...At present, electricity price to grid of domestic power plants is priced by the national administration based on the policy of "one power plant with one electricity price to grid," which is difficult to realize real bidding for access to grid in practice in a short term. This paper presents one kind of power-exchanging transaction model among price-varied power plants, which will be beneficial to price-varied power plants without any loss of profits of them and guarantee state-owned assets profits in minimum loss with no promotion of average price limit by power plants. Under ideal conditions, the computation results showed the sufficiency and necessity of power-exchanging transaction and maximum similarity with the requirements of optimized resources disposition in economics. The presented model is shown to be full of practicability and has been used in some part of power market.展开更多
An improved network flow algorithm, which includes the minimum cost network flow and the same period network flow, is proposed to solve the optimization of cascaded hydroelectric power plants in a competitive electric...An improved network flow algorithm, which includes the minimum cost network flow and the same period network flow, is proposed to solve the optimization of cascaded hydroelectric power plants in a competitive electricity market. The typical network flow is used to find the feasible flow and add the discharge water to different cascaded hydroelectric power plants at the same step. The same period network flow is used to find the optimal flow and add the power output at a different step. This new algorithm retains the advantages of the typical network flow, such as simplicity and ease of realization. The result of the case analysis indicates that the new algorithm can achieve high calculation precision and can be used to calculate the optimal operation of cascaded hydroelectric power plants.展开更多
文摘A bidding model of neural network was presented to pursue the largest benefit according to the policy of separating power plants from network and bidding transaction. This model bases on the cost of power plant and its research object is a power plant in the market. The market clearing price (MCP) can be predicted and an optimized load curve can be decided in this model. The model may provide technical support for the power plant.
文摘In many electrical grids worldwide, the rising amount of installed PV (photovoltaic) power entails a considerable influence of PV systems on grid quality and stability. Consequently, in the wake of the revised German medium voltage directives issued in 2009, new requirements for PV inverters have been established internationally. At Fraunhofer ISE's Inverter Laboratory, approximately 25 large PV inverters with a nominal power of up to 880 kVA have been characterized in the past three years. In this period, the focus of many inverter manufacturers has begun to shift from traditional European markets towards an international perspective. Therefore, experiences with numerous different grid codes have been gained by our team. This work summarizes the similarities and differences between these grid codes. Additionally, several requirements that have proved to be critical will be examined. Finally, the adequacy of these grid codes to guarantee the safe and reliable operation of electrical grids is discussed.
基金This research is supported by Special Science Fund on University Doctor Science Point of the Department of Education of China (20020698027).
文摘At present, electricity price to grid of domestic power plants is priced by the national administration based on the policy of "one power plant with one electricity price to grid," which is difficult to realize real bidding for access to grid in practice in a short term. This paper presents one kind of power-exchanging transaction model among price-varied power plants, which will be beneficial to price-varied power plants without any loss of profits of them and guarantee state-owned assets profits in minimum loss with no promotion of average price limit by power plants. Under ideal conditions, the computation results showed the sufficiency and necessity of power-exchanging transaction and maximum similarity with the requirements of optimized resources disposition in economics. The presented model is shown to be full of practicability and has been used in some part of power market.
文摘An improved network flow algorithm, which includes the minimum cost network flow and the same period network flow, is proposed to solve the optimization of cascaded hydroelectric power plants in a competitive electricity market. The typical network flow is used to find the feasible flow and add the discharge water to different cascaded hydroelectric power plants at the same step. The same period network flow is used to find the optimal flow and add the power output at a different step. This new algorithm retains the advantages of the typical network flow, such as simplicity and ease of realization. The result of the case analysis indicates that the new algorithm can achieve high calculation precision and can be used to calculate the optimal operation of cascaded hydroelectric power plants.