do虽然是个人人都熟悉的词,但对于它的用法并非所有的人都能运用自如。其实,在英语会话中,do含义之多,用途之广实非其他词所能及。现仅就其在口语中的常用法略谈一二。 1.和别人第一次见面或遇到不大熟悉的人时,最适当的问侯语,当首推Ho...do虽然是个人人都熟悉的词,但对于它的用法并非所有的人都能运用自如。其实,在英语会话中,do含义之多,用途之广实非其他词所能及。现仅就其在口语中的常用法略谈一二。 1.和别人第一次见面或遇到不大熟悉的人时,最适当的问侯语,当首推How do you do?了,它可以用在任何场合。除此之外,我们还可以用 How are you doing?来问侯。展开更多
Based on the preferential continuation method proposed by Pawlowski (1995), we propose a method and procedure for gravity anomaly separation with the preferential upward continuation operator in the case that the va...Based on the preferential continuation method proposed by Pawlowski (1995), we propose a method and procedure for gravity anomaly separation with the preferential upward continuation operator in the case that the various sources are uncorrelated with one another and the continuation height is enough large. We also present a method for estimating optimum upward-continuation height, based on analyzing the characteristics of the preferential upward continuation operators of a synthesized gravity anomaly varying with different continuation heights. The method is tested on the raw Bouguer gravity data over an iron deposit. The result shows that the method separates the data into regional anomaly and residual anomaly efficiently and clearly.展开更多
Rockfalls are one of the hazards that may be associated with open pit mining. The majority of rockfalls occur due to the existing conditions of slopes, such as back break, fractures and joints. Constructing a berm on ...Rockfalls are one of the hazards that may be associated with open pit mining. The majority of rockfalls occur due to the existing conditions of slopes, such as back break, fractures and joints. Constructing a berm on the catch bench is a popular method for the mitigation of rockfall hazards in open pit mining.The width of the catch bench and the height of the berm play a major role in the open pit bench design.However, there is no systematic method currently available to optimize the size of these parameters. This study proposes a novel methodology which calculates the optimum catch bench width by integrating the rockfall simulation model and genetic algorithm into a Simulation-Optimization Model. The proposed methodology is useful when used to determine the minimum catch bench width, or the maximum overall slope angle, insuring that a sufficient factor of safety of the slope is included while maximizing the overall profitability of the open pit mine.展开更多
China's newly enacted Breakwater Design Specifications(JTS154-2011) explicitly state that breakwaters with water depths greater than 20 m are categorized as deep-water breakwaters, and emphasize that design princi...China's newly enacted Breakwater Design Specifications(JTS154-2011) explicitly state that breakwaters with water depths greater than 20 m are categorized as deep-water breakwaters, and emphasize that design principles, methods and construction requirements are different from those of common shallow water breakwaters. However, the specifications do not make any mention of how to choose wave force calculation methods of deep-water breakwaters. To study the feasibility of different formulae for wave force estimation of deep water combined breakwaters, the wave force calculated by the Sainflou's, Goda's, modified Goda's and specifications' methods are compared for various water depths and wave heights in this paper. The calculated results are also compared with experimental data. The total horizontal forcing and the pattern of pressure distributions are presented. Comparisons show that the wave pressure distributions by the four methods are similar, but the total horizontal forces are different. The results obtained by the Goda's method and the specified formulae are much closer to the experimental data. As for the wave force estimation for the deepwater mixed embankment foundation bed parapet, the Goda's formula is applied in the case with a water depth of less than 42 m. The Specifications method is suitable for standing waves. In the wave force estimates of breastworks, Sainflou's and the modified Gaoda's formulae are no longer applicable for the foundation bed of mixed embankment.展开更多
Pile-slab structure roadbed is a new form of ballastless track for high speed railway. Due to lack of corresponding design code, based on the analysis of its structure characteristics and application requirements, it ...Pile-slab structure roadbed is a new form of ballastless track for high speed railway. Due to lack of corresponding design code, based on the analysis of its structure characteristics and application requirements, it is proposed to carry out load effect combination according to ultimate limit state and serviceability limit state, and the most unfavorable combination of each state is chosen to carry through design calculation for pile-slab structure. Space model of pile-slab structure can be simplified as a plane flame model, by using the orthogonal test method, and the design parameter of pile-slab structure is optimized. Moreover, based on the engineering background of Suining-Chongqing high-speed railway, the dynamic deformation characteristics of pile-slab structure roadbed are further researched by carrying on the indoor dynamic model test. The test results show that the settlement after construction of subgrade satisfies the requirement of settlement control to build ballastless track on soil subgrade for high-speed railway. Slab structure plays the role of arch shell as load is transmitted from slab to pile, and the vertical dynamic stress of subgrade soil is approximately of "K" form distribution with the depth. The distribution of pile stress is closely related to soil characteristics, which has an upset triangle shape where the large dynamic stress is at the top. Pile compared with soil shares most dynamic stress. Pile structure expands the depth of the dynamic response of subgrade has limited effect on dynamic response. These results can provide subgrade. and improves the stress of subgrade soil, and the speed of train scientific basis for pile-slab structure roadbed used on soil展开更多
The aim of this paper is to obtain numerical solutions of the one-dimensional,two-dimensional and coupled Burgers' equations through the generalized differential quadrature method(GDQM).The polynomial-based differ...The aim of this paper is to obtain numerical solutions of the one-dimensional,two-dimensional and coupled Burgers' equations through the generalized differential quadrature method(GDQM).The polynomial-based differential quadrature(PDQ) method is employed and the obtained system of ordinary differential equations is solved via the total variation diminishing Runge-Kutta(TVD-RK) method.The numerical solutions are satisfactorily coincident with the exact solutions.The method can compete against the methods applied in the literature.展开更多
As an important geophysical tool,high density electrical technique infers the underground geological structures by processing and inverting the apparent resistivity data.Currently,the false anomalies have been frequen...As an important geophysical tool,high density electrical technique infers the underground geological structures by processing and inverting the apparent resistivity data.Currently,the false anomalies have been frequently occurred in the graph of apparent resistivity pseudo-section or inverted geoelectrical section obtained from high-density electrical technique,and are difficult to remove.In this study,the authors explain the mechanism of the false anomalies and put forward the horizontal differential field method to identify the false anomalies.Based on the analysis of modeling results,this method is applied in the surveying data in Xinlei Quarry of Jiuquan,and the results confirm the effectiveness of the horizontal differential field method.展开更多
Well logging technology in coalbed methane (CBM) exploration may develop in two directions: one is the novel well logging methods; the other is the new interpretation methods for the conventional logging data, on w...Well logging technology in coalbed methane (CBM) exploration may develop in two directions: one is the novel well logging methods; the other is the new interpretation methods for the conventional logging data, on which the authors of this paper concentrated mainly. The paper introduced several methods in calculating with well logs such important parameters as porosity, permeability and gas content of CBM reservoir and evaluated their effectiveness. A new method of well logging data interpretation was put forward for coalbed recognition, i.e., the combination of the principal component analysis and the wavelet transform. The authors find that the second principal component (PCA2) contains much more information of coalbed in the coal-bearing series and the reconstruction signal from the detailed wavelet coefficients at level 4 (PCA24) and 5 (PCA25) highlights the signature ofcoalbeds. In terms of the characteristics of CBM reservoir in China, the authors summarized the key points in the application of well logging technique to CBM exploration, and gave a guideline for further related research work.展开更多
Many problems in applied mathematics lead to ordinary differential equation. In this paper, a considerable refinement and improvement of the Euler's method obtained using PSO (particle swarm optimization) was prese...Many problems in applied mathematics lead to ordinary differential equation. In this paper, a considerable refinement and improvement of the Euler's method obtained using PSO (particle swarm optimization) was presented. PSO is a technique based on the cooperation between particles. The exchange of information between these particles allows to resolve difficult problems. This approach is carefully handled and tested with an illustrated example.展开更多
文摘do虽然是个人人都熟悉的词,但对于它的用法并非所有的人都能运用自如。其实,在英语会话中,do含义之多,用途之广实非其他词所能及。现仅就其在口语中的常用法略谈一二。 1.和别人第一次见面或遇到不大熟悉的人时,最适当的问侯语,当首推How do you do?了,它可以用在任何场合。除此之外,我们还可以用 How are you doing?来问侯。
基金supported jointly by projects of the 863 Program (Grant Nos.2006AA06Z111,2006AA06A201-3,and 20060109A1002-0201-03)
文摘Based on the preferential continuation method proposed by Pawlowski (1995), we propose a method and procedure for gravity anomaly separation with the preferential upward continuation operator in the case that the various sources are uncorrelated with one another and the continuation height is enough large. We also present a method for estimating optimum upward-continuation height, based on analyzing the characteristics of the preferential upward continuation operators of a synthesized gravity anomaly varying with different continuation heights. The method is tested on the raw Bouguer gravity data over an iron deposit. The result shows that the method separates the data into regional anomaly and residual anomaly efficiently and clearly.
文摘Rockfalls are one of the hazards that may be associated with open pit mining. The majority of rockfalls occur due to the existing conditions of slopes, such as back break, fractures and joints. Constructing a berm on the catch bench is a popular method for the mitigation of rockfall hazards in open pit mining.The width of the catch bench and the height of the berm play a major role in the open pit bench design.However, there is no systematic method currently available to optimize the size of these parameters. This study proposes a novel methodology which calculates the optimum catch bench width by integrating the rockfall simulation model and genetic algorithm into a Simulation-Optimization Model. The proposed methodology is useful when used to determine the minimum catch bench width, or the maximum overall slope angle, insuring that a sufficient factor of safety of the slope is included while maximizing the overall profitability of the open pit mine.
基金supported by the Shandong Sci-tech Development Plan(Item No.2008GGB01099)
文摘China's newly enacted Breakwater Design Specifications(JTS154-2011) explicitly state that breakwaters with water depths greater than 20 m are categorized as deep-water breakwaters, and emphasize that design principles, methods and construction requirements are different from those of common shallow water breakwaters. However, the specifications do not make any mention of how to choose wave force calculation methods of deep-water breakwaters. To study the feasibility of different formulae for wave force estimation of deep water combined breakwaters, the wave force calculated by the Sainflou's, Goda's, modified Goda's and specifications' methods are compared for various water depths and wave heights in this paper. The calculated results are also compared with experimental data. The total horizontal forcing and the pattern of pressure distributions are presented. Comparisons show that the wave pressure distributions by the four methods are similar, but the total horizontal forces are different. The results obtained by the Goda's method and the specified formulae are much closer to the experimental data. As for the wave force estimation for the deepwater mixed embankment foundation bed parapet, the Goda's formula is applied in the case with a water depth of less than 42 m. The Specifications method is suitable for standing waves. In the wave force estimates of breastworks, Sainflou's and the modified Gaoda's formulae are no longer applicable for the foundation bed of mixed embankment.
基金Foundation item: Project(2013CB036405) supported by the National Basic Research Program of China Project(KZZD-EW-05) supported by the Key Research Program of the Chinese Academy of Sciences
文摘Pile-slab structure roadbed is a new form of ballastless track for high speed railway. Due to lack of corresponding design code, based on the analysis of its structure characteristics and application requirements, it is proposed to carry out load effect combination according to ultimate limit state and serviceability limit state, and the most unfavorable combination of each state is chosen to carry through design calculation for pile-slab structure. Space model of pile-slab structure can be simplified as a plane flame model, by using the orthogonal test method, and the design parameter of pile-slab structure is optimized. Moreover, based on the engineering background of Suining-Chongqing high-speed railway, the dynamic deformation characteristics of pile-slab structure roadbed are further researched by carrying on the indoor dynamic model test. The test results show that the settlement after construction of subgrade satisfies the requirement of settlement control to build ballastless track on soil subgrade for high-speed railway. Slab structure plays the role of arch shell as load is transmitted from slab to pile, and the vertical dynamic stress of subgrade soil is approximately of "K" form distribution with the depth. The distribution of pile stress is closely related to soil characteristics, which has an upset triangle shape where the large dynamic stress is at the top. Pile compared with soil shares most dynamic stress. Pile structure expands the depth of the dynamic response of subgrade has limited effect on dynamic response. These results can provide subgrade. and improves the stress of subgrade soil, and the speed of train scientific basis for pile-slab structure roadbed used on soil
文摘The aim of this paper is to obtain numerical solutions of the one-dimensional,two-dimensional and coupled Burgers' equations through the generalized differential quadrature method(GDQM).The polynomial-based differential quadrature(PDQ) method is employed and the obtained system of ordinary differential equations is solved via the total variation diminishing Runge-Kutta(TVD-RK) method.The numerical solutions are satisfactorily coincident with the exact solutions.The method can compete against the methods applied in the literature.
文摘As an important geophysical tool,high density electrical technique infers the underground geological structures by processing and inverting the apparent resistivity data.Currently,the false anomalies have been frequently occurred in the graph of apparent resistivity pseudo-section or inverted geoelectrical section obtained from high-density electrical technique,and are difficult to remove.In this study,the authors explain the mechanism of the false anomalies and put forward the horizontal differential field method to identify the false anomalies.Based on the analysis of modeling results,this method is applied in the surveying data in Xinlei Quarry of Jiuquan,and the results confirm the effectiveness of the horizontal differential field method.
基金This work was supported by Scientific Research Foundation for the Returned Overseas Chinese Scholars, State Education Ministry (2006331), China Postdoctoral Science Foundation (20070411106) and Open Fund of Key Laboratory of Depositional Mineralization & Sedimentary Mineral, Shandong Province (DMSM200802).
文摘Well logging technology in coalbed methane (CBM) exploration may develop in two directions: one is the novel well logging methods; the other is the new interpretation methods for the conventional logging data, on which the authors of this paper concentrated mainly. The paper introduced several methods in calculating with well logs such important parameters as porosity, permeability and gas content of CBM reservoir and evaluated their effectiveness. A new method of well logging data interpretation was put forward for coalbed recognition, i.e., the combination of the principal component analysis and the wavelet transform. The authors find that the second principal component (PCA2) contains much more information of coalbed in the coal-bearing series and the reconstruction signal from the detailed wavelet coefficients at level 4 (PCA24) and 5 (PCA25) highlights the signature ofcoalbeds. In terms of the characteristics of CBM reservoir in China, the authors summarized the key points in the application of well logging technique to CBM exploration, and gave a guideline for further related research work.
文摘Many problems in applied mathematics lead to ordinary differential equation. In this paper, a considerable refinement and improvement of the Euler's method obtained using PSO (particle swarm optimization) was presented. PSO is a technique based on the cooperation between particles. The exchange of information between these particles allows to resolve difficult problems. This approach is carefully handled and tested with an illustrated example.