During the excavation of three-parallel-hole tunnel, the tunnel might collapse due to over-stress as a result of inadequate rock pillar width. Treating the rock overburden depth, rock strength, and rock pillar width a...During the excavation of three-parallel-hole tunnel, the tunnel might collapse due to over-stress as a result of inadequate rock pillar width. Treating the rock overburden depth, rock strength, and rock pillar width as variables, a series of 3D numerical analysis was carried out to examine the effect of each variable on the safety of the tunnel, in particular the rock pillar. A stress strength ratio (SSR) was used to define whether the safety of the rock pillar was exceeded. A simple design chart for the case of three-parallel-hole tunnel, which took into account the influence of overburden depth, rock pillar width, and rock strength, was also proposed for used in the preliminary design stage.展开更多
文摘During the excavation of three-parallel-hole tunnel, the tunnel might collapse due to over-stress as a result of inadequate rock pillar width. Treating the rock overburden depth, rock strength, and rock pillar width as variables, a series of 3D numerical analysis was carried out to examine the effect of each variable on the safety of the tunnel, in particular the rock pillar. A stress strength ratio (SSR) was used to define whether the safety of the rock pillar was exceeded. A simple design chart for the case of three-parallel-hole tunnel, which took into account the influence of overburden depth, rock pillar width, and rock strength, was also proposed for used in the preliminary design stage.