A two-sided assembly line is typically found in plants producing large-sized products. Its advantages over a one-sided line and the difficulties faced in two-sided line balancing problems were discussed. A mathematica...A two-sided assembly line is typically found in plants producing large-sized products. Its advantages over a one-sided line and the difficulties faced in two-sided line balancing problems were discussed. A mathematical model for two-ALB problem was suggested. A modification of the “ranked positional weight” method, namely two-ALB RPW for two-ALB problems was developed. Experiments were carried out to verify the performance of the proposed method and the results show that it is effective in solving two-sided assembly line balancing problems.展开更多
In a manufacturing industry, mixed model assembly line(MMAL) is preferred in order to meet the variety in product demand. MMAL balancing helps in assembling products with similar characteristics in a random fashion. T...In a manufacturing industry, mixed model assembly line(MMAL) is preferred in order to meet the variety in product demand. MMAL balancing helps in assembling products with similar characteristics in a random fashion. The objective of this work aims in reducing the number of workstations, work load index between stations and within each station. As manual contribution of workers in final assembly line is more, ergonomics is taken as an additional objective function. Ergonomic risk level of a workstation is evaluated using a parameter called accumulated risk posture(ARP), which is calculated using rapid upper limb assessment(RULA) check sheet. This work is based on the case study of an MMAL problem in Rane(Madras) Ltd.(India), in which a problem based genetic algorithm(GA) has been proposed to minimize the mentioned objectives. The working of the genetic operators such as selection, crossover and mutation has been modified with respect to the addressed MMAL problem. The results show that there is a significant impact over productivity and the process time of the final assembled product, i.e., the rate of production is increased by 39.5% and the assembly time for one particular model is reduced to 13 min from existing 18 min. Also, the space required using the proposed assembly line is only 200 m2 against existing 350 m2. Further, the algorithm helps in reducing workers fatigue(i.e., ergonomic friendly).展开更多
A network plan model of ship erection was established based on the network planning technology and the work-package breakdown system. The load-oriented production control method was introduced to build up a throughput...A network plan model of ship erection was established based on the network planning technology and the work-package breakdown system. The load-oriented production control method was introduced to build up a throughput diagram model thus it is possible to describe the ship erection process numerically. Based on the digitalized models some cases of production balance of ship erection were studied and three balance indexes were put forward, they are the load balance rate, the input manpower balance rate and the maximum gantry crane operating times. Such an analytic method based on the balance evaluation is the important foundation for digitization and intelligentization of shipyard production management.展开更多
The rotor initial unbalance of an aeroengine gas generator of turboshaft engine seriously affects rotor assembly process.To reasonably optimize rotor assembly process,the effect analyses of rotor initial unbalance of ...The rotor initial unbalance of an aeroengine gas generator of turboshaft engine seriously affects rotor assembly process.To reasonably optimize rotor assembly process,the effect analyses of rotor initial unbalance of single disc and combined discs on rotor dynamic characteristics are firstly implemented in respect of the dispersity of rotor initial unbalance.It is found that the most important factors contributing to rotor vibration are the unbalances of the first stage compressor disc and the second stage turbine disc.However,reducing the mass of two discs conflicts with the control of the whole gas generator rotor balance resulting from the unbalance increase of single components.Thus,we further analyze the key control factors of affecting rotor initial unbalance,and give the strict control measures of centrifugal impeller runout in the assembly process by adjusting the angle of central tie rod axis.The purpose of this measures to make the assembly process simpler and more effective for timely controlling rotor initial unbalance.The efforts of this study validate that the proposed method is workable for the rotor tightened by a central tie rod and possesses the significant meaning of practical application in engineering.展开更多
A balancing problem for a mixed model assembly line with uncertain task processmg Ume anO daily model mixed changes is considered, and the objective is to minimize the work variances between stations in the line. For ...A balancing problem for a mixed model assembly line with uncertain task processmg Ume anO daily model mixed changes is considered, and the objective is to minimize the work variances between stations in the line. For the balancing problem for the scenario-based robust assembly line with a finitely large number of potential scenarios, the direct solution methodology considering all potential scenarios is quite time-consuming. A scenario relaxation algorithm that embeds genetic al- gorithm is developed. This new algorithm guarantees termination at an optimal robust solution with relatively short running time, and makes it possible to solve robust problems with large quantities of potential scenarios. Extensive computational results are reported to show the efficiency and effectiveness of the proposed algorithm.展开更多
基金Key Projectof Scientific and TechnologicalCommittee of Shanghai(No.0 3 11110 0 5 )
文摘A two-sided assembly line is typically found in plants producing large-sized products. Its advantages over a one-sided line and the difficulties faced in two-sided line balancing problems were discussed. A mathematical model for two-ALB problem was suggested. A modification of the “ranked positional weight” method, namely two-ALB RPW for two-ALB problems was developed. Experiments were carried out to verify the performance of the proposed method and the results show that it is effective in solving two-sided assembly line balancing problems.
基金support and help of many individuals in the SASTRA University
文摘In a manufacturing industry, mixed model assembly line(MMAL) is preferred in order to meet the variety in product demand. MMAL balancing helps in assembling products with similar characteristics in a random fashion. The objective of this work aims in reducing the number of workstations, work load index between stations and within each station. As manual contribution of workers in final assembly line is more, ergonomics is taken as an additional objective function. Ergonomic risk level of a workstation is evaluated using a parameter called accumulated risk posture(ARP), which is calculated using rapid upper limb assessment(RULA) check sheet. This work is based on the case study of an MMAL problem in Rane(Madras) Ltd.(India), in which a problem based genetic algorithm(GA) has been proposed to minimize the mentioned objectives. The working of the genetic operators such as selection, crossover and mutation has been modified with respect to the addressed MMAL problem. The results show that there is a significant impact over productivity and the process time of the final assembled product, i.e., the rate of production is increased by 39.5% and the assembly time for one particular model is reduced to 13 min from existing 18 min. Also, the space required using the proposed assembly line is only 200 m2 against existing 350 m2. Further, the algorithm helps in reducing workers fatigue(i.e., ergonomic friendly).
基金the Key Scientific Research Project from MOE & MOF of China "Knowledge-based Ship-designHyper Integrated Platform (KSHIP)"
文摘A network plan model of ship erection was established based on the network planning technology and the work-package breakdown system. The load-oriented production control method was introduced to build up a throughput diagram model thus it is possible to describe the ship erection process numerically. Based on the digitalized models some cases of production balance of ship erection were studied and three balance indexes were put forward, they are the load balance rate, the input manpower balance rate and the maximum gantry crane operating times. Such an analytic method based on the balance evaluation is the important foundation for digitization and intelligentization of shipyard production management.
文摘The rotor initial unbalance of an aeroengine gas generator of turboshaft engine seriously affects rotor assembly process.To reasonably optimize rotor assembly process,the effect analyses of rotor initial unbalance of single disc and combined discs on rotor dynamic characteristics are firstly implemented in respect of the dispersity of rotor initial unbalance.It is found that the most important factors contributing to rotor vibration are the unbalances of the first stage compressor disc and the second stage turbine disc.However,reducing the mass of two discs conflicts with the control of the whole gas generator rotor balance resulting from the unbalance increase of single components.Thus,we further analyze the key control factors of affecting rotor initial unbalance,and give the strict control measures of centrifugal impeller runout in the assembly process by adjusting the angle of central tie rod axis.The purpose of this measures to make the assembly process simpler and more effective for timely controlling rotor initial unbalance.The efforts of this study validate that the proposed method is workable for the rotor tightened by a central tie rod and possesses the significant meaning of practical application in engineering.
基金Supported by the National High Technology Research and Development Programme of China (No. 2006AA04Z160) and the National Natural Science Foundation of China ( No. 60874066).
文摘A balancing problem for a mixed model assembly line with uncertain task processmg Ume anO daily model mixed changes is considered, and the objective is to minimize the work variances between stations in the line. For the balancing problem for the scenario-based robust assembly line with a finitely large number of potential scenarios, the direct solution methodology considering all potential scenarios is quite time-consuming. A scenario relaxation algorithm that embeds genetic al- gorithm is developed. This new algorithm guarantees termination at an optimal robust solution with relatively short running time, and makes it possible to solve robust problems with large quantities of potential scenarios. Extensive computational results are reported to show the efficiency and effectiveness of the proposed algorithm.