期刊文献+
共找到3篇文章
< 1 >
每页显示 20 50 100
阜石路(西四环-西五环)城市快速路交通组织设计研究 被引量:4
1
作者 张玉轻 《市政技术》 2009年第1期14-18,共5页
介绍了北京市阜石路(西四环-西五环)城市快速路的交通组织设计实例,对城市建成区快速路立面空间形态——平铺路(常规的)与高架路进行综合分析比较,提出了最优方案和对城市建成区既有道路上改建快速路的交通组织设计应考虑的问题及其对策。
关键词 城市快速路 平铺路 高架路 交通组织设计
下载PDF
北京阜石路(西四环—西五环)道路横断面设计探讨
2
作者 蒋陆一 张玉轻 +1 位作者 王京京 韩可率 《市政技术》 2009年第3期207-212,共6页
横断面设计是实现城市道路设计新理念的载体之一,它的合理性关系到交通安全、环保以及城市用地的经济与城市面貌的观瞻,是整个道路设计中的重要环节。结合北京阜石路工程实例,对道路横断面设计中应该考虑的问题进行了探索、研究和总结。
关键词 道路 横断面 高架路 平铺路 方案分析
下载PDF
A Preliminary Analysis of the Tomography Problems in Constructing Bridge and Dike-Road across Taiwan Strait
3
作者 GUO Lu-can PENG Fuman 《CT理论与应用研究(中英文)》 2004年第3期61-63,共3页
The construction of the bridge across Taiwan Strait has been studied for a long time and the feasibility study that has attracted attention among scientists and engineers on both sides of the Taiwan Strait[1-4].The ke... The construction of the bridge across Taiwan Strait has been studied for a long time and the feasibility study that has attracted attention among scientists and engineers on both sides of the Taiwan Strait[1-4].The key question is whether this bridge and dike-road across Taiwan Strait can be constructed with present technology under such complex geological conditions or not.The results of current researches indicate that the sea floor of the Strait is covered with a horizontal layer composed of both the Pleistocene and the Holocene sandstone and shale with a thickness of about 200~300m.The distance from Pingtan island to China's Xinzhu seashore is 124 km,which might be connected by 4-6 section bridges and 5-7 section of dike-roads,and serve as a best program of the route in the north Strait section.The NE offshore fault along the Fujian coast and that along the west coast of Taiwan,China are the major tectonic lines separated by several NW faults under the upper horizontal layer,these fault 3D feature may be detecting by geo-tomography technique,which can help to deal with the foundation of bridge and dike-road piers.It is judged that the construction of bridge and dike-road beginning from Pingtan to the China's Xinzhu seashore is worth recommendation.In the procedure of the construction of large and high height bridges,must consider the steel structural member be detected by industrial CT technology,and might detect the pier of bridge and dike-road which built by steel tube and reinforced concrete at dike-roads two side,in order to get the hard basement and getting the depth of the pier extend below the sea-floor by the seismic tomographic detection method. 展开更多
关键词 Taiwan Strait tomography problem Pingtan Island constructing bridge dike-road
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部