期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
深部工作面近距离跨采巷道围岩加固技术 被引量:10
1
作者 王念雷 《煤炭科学技术》 CAS 北大核心 2018年第S2期10-14,共5页
基于回采工作面跨开拓巷道回采的技术研究与实践,根据工作面接续规划,姚桥煤矿7271工作面将跨越-850 m轨道大巷进行回采,该工作面距离轨道大巷最小法距2.3 m,为保证矿井通风、排水及其他系统的正常运行,确保工作面安全顺利推进,做到工... 基于回采工作面跨开拓巷道回采的技术研究与实践,根据工作面接续规划,姚桥煤矿7271工作面将跨越-850 m轨道大巷进行回采,该工作面距离轨道大巷最小法距2.3 m,为保证矿井通风、排水及其他系统的正常运行,确保工作面安全顺利推进,做到工作面回采及回采后轨道大巷不垮落、不冒顶、变形量满足生产需求,综合工作面围岩应力分析、支护加固理论各项技术研究,采取了轨道大巷围岩支护综合加固方案,实现了轨道大巷围岩变形量技术的可控性,验证了轨道大巷近距离上覆煤层安全可靠回采的技术可行性。 展开更多
关键词 应力简析 围岩加固 变形观测 数据分析 工程评定
下载PDF
Analytical solution for evaluating deformation response of existing metro tunnel due to excavation of adjacent foundation pit 被引量:9
2
作者 QIU Ju-tao JIANG Jie +2 位作者 ZHOU Xiao-jun ZHANG Yue-feng PAN Ying-dong 《Journal of Central South University》 SCIE EI CAS CSCD 2021年第6期1888-1900,共13页
The excavation of foundation pit generates soil deformation around existing metro tunnel with shield driving method,which may lead to the deformation of tunnel lining.It is a challenge to evaluate the deformation of s... The excavation of foundation pit generates soil deformation around existing metro tunnel with shield driving method,which may lead to the deformation of tunnel lining.It is a challenge to evaluate the deformation of shield tunnel accurately and take measures to reduce the tunnel upward displacement as much as possible for geotechnical engineers.A new simplified analytical method is proposed to predict the longitudinal deformation of existing metro tunnel due to excavation unloading of adjacent foundation pit in this paper.Firstly,the additional stress of soils under vertical axisymmetric load in layered soil is obtained by using elastic multi-layer theory.Secondly,the metro tunnel is regarded as a Timoshenko beam supported by Winkler foundation so that the shear effect of tunnels can be taken into account.The additional stress acting on the tunnel due to excavation unloading in layered soil are compared with that in homogeneous soil.Additionally,the effectiveness of the analytical solution is verified via two actual cases.Moreover,parametric analysis is conducted to investigate the responses of the metro tunnel by considering such factors as the variation of subgrade coefficient,offset distance from the excavation center to tunnel longitudinal axis as well as equivalent shear stiffness.The proposed method can be used to provide theoretical basis for similar engineering project. 展开更多
关键词 metro tunnel simplified analytical method additional stress Timoshenko beam Winkler foundation
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部