In this thesis,construction industries face with the major challenges are cost overruns and time delays, which have existed in most of projects, especially in developing countries. Construction projects and the enviro...In this thesis,construction industries face with the major challenges are cost overruns and time delays, which have existed in most of projects, especially in developing countries. Construction projects and the environment are increasingly complex, thus it has greater demands on project managers and cost managers that deliver processes on time. However the process of construction is limited to unforeseeable and variable factors, resulting from many sources. The aim of the report is to analyze determining factors about causing budget overrun and time delays by reviewing and identifying past cases. Furthermore, the construction process is made up of three critical phases, i.e. conception, design, construction. Generally, the majority of time delays and cost overrun happen in the period of construction, where many factors are always unforeseeable, and time delays usually associate with cost overruns. (Chan and Kumaraswamy, 1997)展开更多
Zhejiang Small and medium enterprises have had major achievements adapting to the trend of economic development and it encountered bottlenecks. During the development process, there are malpractices, such as the paren...Zhejiang Small and medium enterprises have had major achievements adapting to the trend of economic development and it encountered bottlenecks. During the development process, there are malpractices, such as the parent wind, system's lacking of science, epitaxial growth, excessive dependence on the international market, and ineffective management mode. Based on the central economic work conference, changing management and enterprise strategy adjustment are inevitable choices of Zhejiang small and medium-sized enterprises" management mode development.展开更多
文摘In this thesis,construction industries face with the major challenges are cost overruns and time delays, which have existed in most of projects, especially in developing countries. Construction projects and the environment are increasingly complex, thus it has greater demands on project managers and cost managers that deliver processes on time. However the process of construction is limited to unforeseeable and variable factors, resulting from many sources. The aim of the report is to analyze determining factors about causing budget overrun and time delays by reviewing and identifying past cases. Furthermore, the construction process is made up of three critical phases, i.e. conception, design, construction. Generally, the majority of time delays and cost overrun happen in the period of construction, where many factors are always unforeseeable, and time delays usually associate with cost overruns. (Chan and Kumaraswamy, 1997)
文摘Zhejiang Small and medium enterprises have had major achievements adapting to the trend of economic development and it encountered bottlenecks. During the development process, there are malpractices, such as the parent wind, system's lacking of science, epitaxial growth, excessive dependence on the international market, and ineffective management mode. Based on the central economic work conference, changing management and enterprise strategy adjustment are inevitable choices of Zhejiang small and medium-sized enterprises" management mode development.