Opening horizontal slit in the middle web of the beam end formed a new type of artificial plastic hinge. The calculation formulas about the hinge’s interior force and bearing capacity are set up. Based on these, the ...Opening horizontal slit in the middle web of the beam end formed a new type of artificial plastic hinge. The calculation formulas about the hinge’s interior force and bearing capacity are set up. Based on these, the condition of transfer, the location of crack and the cracking length of the artificial plastic hinge were studied further. The calculation method for the ductility factor was also presented. The calculation results and the test ones were compatible.展开更多
A realistic kinetic Monte Carlo (KMC) simulation model with physical parameters is developed, which well reproduces the heteroepitaxial growth of multilayered Ni thin film on Cu(100) surfaces at room temperature. ...A realistic kinetic Monte Carlo (KMC) simulation model with physical parameters is developed, which well reproduces the heteroepitaxial growth of multilayered Ni thin film on Cu(100) surfaces at room temperature. The effects of mass transport between interlayers and edge diffusion of atoms along the islands are included in the simulation model, and the surface roughness and the layer distribution versus total coverage are calculated. Speeially, the simulation model reveals the transition of growth mode with coverage and the difference between the Ni heteroepitaxy on Cu(100) and the Ni homoepitaxy on Ni(100). Through comparison of KMC simulation with the real scanning tunneling microscopy (STM) experiments, the Ehrlich-Schwoebel (ES) barrier Ees is estimated to be 0.18±0.02 eV for Ni/Cu(100) system while 0.28 eV for Ni/Ni(100). The simulation also shows that the growth mode depends strongly on the thickness of thin film and the surface temperature, and the critical thickness of growth mode transition is dependent on the growth condition such as surface temperature and deposition flux as well.展开更多
In view of the problems and the weaknesses of component-based software ( CBS ) reliability modeling and analysis, and a lack of consideration for real debugging circumstance of integration tes- ting, a CBS reliabili...In view of the problems and the weaknesses of component-based software ( CBS ) reliability modeling and analysis, and a lack of consideration for real debugging circumstance of integration tes- ting, a CBS reliability process analysis model is proposed incorporating debugging time delay, im- perfect debugging and limited debugging resources. CBS integration testing is formulated as a multi- queue muhichannel and finite server queuing model (MMFSQM) to illustrate fault detection process (FDP) and fault correction process (FCP). A unified FCP is sketched, given debugging delay, the diversities of faults processing and the limitations of debugging resources. Furthermore, the impacts of imperfect debugging on fault detection and correction are explicitly elaborated, and the expres- sions of the cumulative number of fault detected and corrected are illustrated. Finally, the results of numerical experiments verify the effectiveness and rationality of the proposed model. By comparison, the proposed model is superior to the other models. The proposed model is closer to real CBS testing process and facilitates software engineer' s quantitatively analyzing, measuring and predicting CBS reliability. K展开更多
文摘Opening horizontal slit in the middle web of the beam end formed a new type of artificial plastic hinge. The calculation formulas about the hinge’s interior force and bearing capacity are set up. Based on these, the condition of transfer, the location of crack and the cracking length of the artificial plastic hinge were studied further. The calculation method for the ductility factor was also presented. The calculation results and the test ones were compatible.
基金the State Key Basic Research Development Project of China under Grant No.2006CB708612the Key Project of Science and Technology of Zhejiang Province under Grant No.2007C21120
文摘A realistic kinetic Monte Carlo (KMC) simulation model with physical parameters is developed, which well reproduces the heteroepitaxial growth of multilayered Ni thin film on Cu(100) surfaces at room temperature. The effects of mass transport between interlayers and edge diffusion of atoms along the islands are included in the simulation model, and the surface roughness and the layer distribution versus total coverage are calculated. Speeially, the simulation model reveals the transition of growth mode with coverage and the difference between the Ni heteroepitaxy on Cu(100) and the Ni homoepitaxy on Ni(100). Through comparison of KMC simulation with the real scanning tunneling microscopy (STM) experiments, the Ehrlich-Schwoebel (ES) barrier Ees is estimated to be 0.18±0.02 eV for Ni/Cu(100) system while 0.28 eV for Ni/Ni(100). The simulation also shows that the growth mode depends strongly on the thickness of thin film and the surface temperature, and the critical thickness of growth mode transition is dependent on the growth condition such as surface temperature and deposition flux as well.
基金Supported by the National High Technology Research and Development Program of China(No.2008AA01A201)the National Natural Science Foundation of China(No.60503015)+1 种基金the National Key R&D Program of China(No.2013BA17F02)the Shandong Province Science and Technology Program of China(No.2011GGX10108,2010GGX10104)
文摘In view of the problems and the weaknesses of component-based software ( CBS ) reliability modeling and analysis, and a lack of consideration for real debugging circumstance of integration tes- ting, a CBS reliability process analysis model is proposed incorporating debugging time delay, im- perfect debugging and limited debugging resources. CBS integration testing is formulated as a multi- queue muhichannel and finite server queuing model (MMFSQM) to illustrate fault detection process (FDP) and fault correction process (FCP). A unified FCP is sketched, given debugging delay, the diversities of faults processing and the limitations of debugging resources. Furthermore, the impacts of imperfect debugging on fault detection and correction are explicitly elaborated, and the expres- sions of the cumulative number of fault detected and corrected are illustrated. Finally, the results of numerical experiments verify the effectiveness and rationality of the proposed model. By comparison, the proposed model is superior to the other models. The proposed model is closer to real CBS testing process and facilitates software engineer' s quantitatively analyzing, measuring and predicting CBS reliability. K