期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
邢台矿建下充填开采关键设备选型应用及改进 被引量:1
1
作者 谢瑞峰 张武东 《科技资讯》 2014年第25期80-82,共3页
本文通过邢台矿7606工作面的概况的介绍,针对邢台矿建下开采关键设备进行了选型分析、配套研究及应用,证明了建下开采关键设备选型是可行的。为其他相似条件下充填开采提供了可借鉴的经验,对矿区的可持续发展具有重要的理论和实际意义。
关键词 建下充填 开采 关键 设备 选型 应用 改进
下载PDF
Waste-filling in fully-mechanized coal mining and its application 被引量:27
2
作者 MIAO Xie-xing ZHANG Ji-xiong FENG Mei-mei 《Journal of China University of Mining and Technology》 EI 2008年第4期479-482,共4页
A fully-mechanized coal mining (FMCM) technology capable of filling up the goaf with wastes (including solid wastes) is described. Industrial tests have proved that by using this technology not only can waste be re-us... A fully-mechanized coal mining (FMCM) technology capable of filling up the goaf with wastes (including solid wastes) is described. Industrial tests have proved that by using this technology not only can waste be re-used but also coal resources can be exploited with a higher recovery rate without removing buildings located over the working faces. Two special devices, a hydraulic support and a scraper conveyor, run side-by-side on the same working face to simultaneously realize mining and filling. These are described in detail. The tests allow analysis of rock pressure and ground subsidence when backfilling techniques are employed. These values are compared to those from mining without using backfilling techniques, under the same geological conditions. The concept of equivalent mining height is proposed based on theoretical analysis of rock pressure and ground subsidence. The upper limits of the rock pressure and ground subsidence can be estimated in backfilling mining using this concept along with traditional engineering formulae. 展开更多
关键词 fully-mechanized coal mining coal mining with gangue backfilling mining under buildings railways and water bodies rock pressure around coal face control of ground subsidence
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部