An optimization method for time-delayed feedback control of partially observable linear building structures subjected to seismic excitation is proposed. A time-delayed control problem of partially observable linear bu...An optimization method for time-delayed feedback control of partially observable linear building structures subjected to seismic excitation is proposed. A time-delayed control problem of partially observable linear building structure under horizontal ground acceleration excitation is formulated and converted into that of completely observable linear structure by using separation principle. The time-delayed control forces are approximately expressed in terms of control forces without time delay. The control system is then governed by Itoe stochastic differential equations for the conditional means of system states and then transformed into those for the conditional means of modal energies by using the stochastic averaging method for quasi-Hamiltonian systems. The control law is assumed to be modal velocity feedback control with time delay and the unknown control gains are determined by the modal performance indices. A three-storey building structure is taken as example to illustrate the proposal method and the numerical results are confirmed by using Monte Carlo simulation.展开更多
Dutch building regulation is under construction. After the report of the commission "Fundamentele Verkenning Bouw" in 2008, several studies have been done on the principals that the commission outlined in its report...Dutch building regulation is under construction. After the report of the commission "Fundamentele Verkenning Bouw" in 2008, several studies have been done on the principals that the commission outlined in its report. Local authorities and parties in construction were invited to start experiments with a more privatized system of building control. But this faced a lack of participation, partly due to the impact of the crisis. The minister responsible for housing and construction invited in 2011 a "Bouwteam" to develop an agenda for action for construction. In 2012, 17 action teams started to focus, speed up and simplify the planning and development of construction. Recently, the two teams related to building regulation presented their plans. The first was a roadmap towards private building control, the second, a proposal for an independent body to answer questions on constructions plans that do intrinsically but not legally meet the standards of building regulation. There is considerable controversy regarding the way that this implementation team is paving its path towards private building control. While the minister for housing conformed himself to a subsidized private implementing team, the Dutch Parliament has expressed its own priorities for regulation: insured guarantee to protect users and owners, a role for local authorities regarding safety and acceptance of buildings and simplification of building regulation and control for simple construction works. The parliament held a round-table conference to get informed about private building control. Recently, a proposal by the minister for housing was discussed. Further debate will be needed to decide about the next steps in innovation building regulation, which will take place in the upcoming months. ERB/RIGO (Foundation Expert Centre Regulations in Building/Research Institute for Real Estate) have developed own proposals for the public-private relation regarding development and construction of buildings. They expect that their proposals might be of help. The proposals are laid down in several publications and partly realized in experimental development of "to be approved" technical solutions. This paper reflects on the differences between their proposals and these of the roadmap, on the possible outcome of the ongoing debate and its implications, legal and technical, on building regulation and on legal and contractual liability. This paper tries to give an inside view on the development of regulation and the pros and cons of the proposals, starting from a theoretical outline of building regulation.展开更多
The developed modem control systems and buildings management resource systems would be effective if they are based on previously established optimal conditions during the building design. This is one of the key issues...The developed modem control systems and buildings management resource systems would be effective if they are based on previously established optimal conditions during the building design. This is one of the key issues for a responsible architecture. The focus of this paper is on sustainable design methods and techniques for saving resources and their management throughout the building lifecycle. The main subject of the present article is the characteristics of these methods and their fundamental role in sustainable resource management during the building operation. The results which are based on conducted case studies of European and international practice in the construction of sustainable buildings are implemented here. Key features of a comprehensive approach for design and construction are outlined via comparative analysis, as well as various systems for the evaluation of sustainability for already constructed buildings. The mostly used criteria and indicators for sustainability are systematized, including those related to resource consumption. By analyzing a specific example, the role of sustainable design methods is justified as an important prerequisite for effective management of building resources in the process building maintenance. According to the conducted studies, during the longest life cycle period of a building, by implementation of control systems and resource management of building, the costs are successfully optimized. Specific directions that prove the effectiveness of such systems are systematized in the paper. Innovative approaches, complex methods and measures for design and management of buildings resources are presented as results of this study.展开更多
In 2008, two governmental committees presented their conclusions on strengthening the role of the private building sector in building control. In 2011, three new studies were commissioned by the government to address ...In 2008, two governmental committees presented their conclusions on strengthening the role of the private building sector in building control. In 2011, three new studies were commissioned by the government to address perceived problems. One of them was an integral study, executed by ERB (Foundation Expertcentre Regulations in Building), RIGO (Research Institute for Real Estate) and TNO (Research Institute for Applied Technologies), to innovate the whole building regulations system. It led to proposals to redefine responsibility and liability for all parties. This study states that by an effort of yearly £100 million, unnecessary costs up to £l billion can be avoided and a real quality push will take place in the building and real estate markets. The goals to reach are to minimize the administrative burden for the building owner and to enforce the construction industry to build conforming to the regulations. This paper discusses the ERB study and the given proposals. The ERB study demonstrated that a quality push is needed which potential will lead to less costs for building owners. It also shows that proven solutions, part of the regulations, might be of help for all parties involved.展开更多
Taking Sutong Bridge as the object investigated, the correctness of the geometry control method is verified by numerical simulation analysis. Taking the impact of geometric nonlinearity into account, the impacts of st...Taking Sutong Bridge as the object investigated, the correctness of the geometry control method is verified by numerical simulation analysis. Taking the impact of geometric nonlinearity into account, the impacts of structural geo- metric profile induced by temporary loads and temperature field during the construction procedure are investigated. The simulation results indicate that only the stage state of the structure during construction is affected. Satisfied outcome of construction control can be achieved based on ~eometrv control method.展开更多
基金the National Natural Science Foundation of China (Nos. 10332030 and 10772159)the Research Fund for theDoctoral Program of Higher Education of China (No. 20060335125)
文摘An optimization method for time-delayed feedback control of partially observable linear building structures subjected to seismic excitation is proposed. A time-delayed control problem of partially observable linear building structure under horizontal ground acceleration excitation is formulated and converted into that of completely observable linear structure by using separation principle. The time-delayed control forces are approximately expressed in terms of control forces without time delay. The control system is then governed by Itoe stochastic differential equations for the conditional means of system states and then transformed into those for the conditional means of modal energies by using the stochastic averaging method for quasi-Hamiltonian systems. The control law is assumed to be modal velocity feedback control with time delay and the unknown control gains are determined by the modal performance indices. A three-storey building structure is taken as example to illustrate the proposal method and the numerical results are confirmed by using Monte Carlo simulation.
文摘Dutch building regulation is under construction. After the report of the commission "Fundamentele Verkenning Bouw" in 2008, several studies have been done on the principals that the commission outlined in its report. Local authorities and parties in construction were invited to start experiments with a more privatized system of building control. But this faced a lack of participation, partly due to the impact of the crisis. The minister responsible for housing and construction invited in 2011 a "Bouwteam" to develop an agenda for action for construction. In 2012, 17 action teams started to focus, speed up and simplify the planning and development of construction. Recently, the two teams related to building regulation presented their plans. The first was a roadmap towards private building control, the second, a proposal for an independent body to answer questions on constructions plans that do intrinsically but not legally meet the standards of building regulation. There is considerable controversy regarding the way that this implementation team is paving its path towards private building control. While the minister for housing conformed himself to a subsidized private implementing team, the Dutch Parliament has expressed its own priorities for regulation: insured guarantee to protect users and owners, a role for local authorities regarding safety and acceptance of buildings and simplification of building regulation and control for simple construction works. The parliament held a round-table conference to get informed about private building control. Recently, a proposal by the minister for housing was discussed. Further debate will be needed to decide about the next steps in innovation building regulation, which will take place in the upcoming months. ERB/RIGO (Foundation Expert Centre Regulations in Building/Research Institute for Real Estate) have developed own proposals for the public-private relation regarding development and construction of buildings. They expect that their proposals might be of help. The proposals are laid down in several publications and partly realized in experimental development of "to be approved" technical solutions. This paper reflects on the differences between their proposals and these of the roadmap, on the possible outcome of the ongoing debate and its implications, legal and technical, on building regulation and on legal and contractual liability. This paper tries to give an inside view on the development of regulation and the pros and cons of the proposals, starting from a theoretical outline of building regulation.
文摘The developed modem control systems and buildings management resource systems would be effective if they are based on previously established optimal conditions during the building design. This is one of the key issues for a responsible architecture. The focus of this paper is on sustainable design methods and techniques for saving resources and their management throughout the building lifecycle. The main subject of the present article is the characteristics of these methods and their fundamental role in sustainable resource management during the building operation. The results which are based on conducted case studies of European and international practice in the construction of sustainable buildings are implemented here. Key features of a comprehensive approach for design and construction are outlined via comparative analysis, as well as various systems for the evaluation of sustainability for already constructed buildings. The mostly used criteria and indicators for sustainability are systematized, including those related to resource consumption. By analyzing a specific example, the role of sustainable design methods is justified as an important prerequisite for effective management of building resources in the process building maintenance. According to the conducted studies, during the longest life cycle period of a building, by implementation of control systems and resource management of building, the costs are successfully optimized. Specific directions that prove the effectiveness of such systems are systematized in the paper. Innovative approaches, complex methods and measures for design and management of buildings resources are presented as results of this study.
文摘In 2008, two governmental committees presented their conclusions on strengthening the role of the private building sector in building control. In 2011, three new studies were commissioned by the government to address perceived problems. One of them was an integral study, executed by ERB (Foundation Expertcentre Regulations in Building), RIGO (Research Institute for Real Estate) and TNO (Research Institute for Applied Technologies), to innovate the whole building regulations system. It led to proposals to redefine responsibility and liability for all parties. This study states that by an effort of yearly £100 million, unnecessary costs up to £l billion can be avoided and a real quality push will take place in the building and real estate markets. The goals to reach are to minimize the administrative burden for the building owner and to enforce the construction industry to build conforming to the regulations. This paper discusses the ERB study and the given proposals. The ERB study demonstrated that a quality push is needed which potential will lead to less costs for building owners. It also shows that proven solutions, part of the regulations, might be of help for all parties involved.
基金National Science and Technology Supporting Program of China ( No. 2006BAG04B03)
文摘Taking Sutong Bridge as the object investigated, the correctness of the geometry control method is verified by numerical simulation analysis. Taking the impact of geometric nonlinearity into account, the impacts of structural geo- metric profile induced by temporary loads and temperature field during the construction procedure are investigated. The simulation results indicate that only the stage state of the structure during construction is affected. Satisfied outcome of construction control can be achieved based on ~eometrv control method.