The methodology of visual simulation for a tunnel engineering construction schedule is presented. Visualization of simulation model, calculation and result of construction schedule simulation is realized, and the cons...The methodology of visual simulation for a tunnel engineering construction schedule is presented. Visualization of simulation model, calculation and result of construction schedule simulation is realized, and the construction simulation and the resource optimization of tunnel engineering are made. A risk analysis and a decision-making method of tunnel engineering construction schedule based on visual simulation are presented. Furthermore, using S curve theory and schedule management method, the real-time management and control method of tunnel engineering construction based on visual simulation is presented. The application to the tunnel engineering construction schedule analysis and management shows the feasibility and effectiveness of the method presented in this paper.展开更多
Today, most construction projects in urban environments are complex high-rise buildings that present unique challenges, including local building ordinances and restrictions, adjoining public and residential areas, nar...Today, most construction projects in urban environments are complex high-rise buildings that present unique challenges, including local building ordinances and restrictions, adjoining public and residential areas, narrow sidewalks and streets, and underground utilities, all of which require extensive planning and tight schedules. A major problem facing such projects is to formulate realistic schedules that will make it possible to meet contractual completion dates with limited resources and budgets. The scheduling software products currently used in construction projects, which include Primavera P6, Microsoft Project, etc., are not actually applied as a scheduling tool in practical construction projects, which instead generally depend on Microsoft Excel or a bar-chart. This is because the existing scheduling programs cannot provide more user-oriented schedule format such as representing two-way multiple overlapping relationships. To overcome this deficiency, the BDM (beeline diagramming method) is proposed as a new networking technique in 2010. But two-way multiple overlapping relationships generate the loop in a conventional schedule computation process. This paper addresses the loop phenomenon of two-way multiple overlapping relationships in a BDM network as well as proposes the solutions of them, and then presents a practical application of two-way multiple overlapping relationships at a real project.展开更多
With rapid development of PetroChina's Qinghai Oilfield, engineering construction quality becomes more and more important in infrastructure construction of the oilfield. Generally speaking, engineering construction q...With rapid development of PetroChina's Qinghai Oilfield, engineering construction quality becomes more and more important in infrastructure construction of the oilfield. Generally speaking, engineering construction quality is related both to national economic development and safety of people and assets. To turn a design map into a materialized object, the construction project involves a large number of elements, such as design, materials, machinery, landform, geological factors, meteorological factors, construction process, technological measures and supervision system. Therefore, quality control holds the key to a construction project.展开更多
基金Supported by National Natural Science Foundation of China (No.50539120)Natural Fund for Distinguished Young Scholars of China(No.50525927)
文摘The methodology of visual simulation for a tunnel engineering construction schedule is presented. Visualization of simulation model, calculation and result of construction schedule simulation is realized, and the construction simulation and the resource optimization of tunnel engineering are made. A risk analysis and a decision-making method of tunnel engineering construction schedule based on visual simulation are presented. Furthermore, using S curve theory and schedule management method, the real-time management and control method of tunnel engineering construction based on visual simulation is presented. The application to the tunnel engineering construction schedule analysis and management shows the feasibility and effectiveness of the method presented in this paper.
文摘Today, most construction projects in urban environments are complex high-rise buildings that present unique challenges, including local building ordinances and restrictions, adjoining public and residential areas, narrow sidewalks and streets, and underground utilities, all of which require extensive planning and tight schedules. A major problem facing such projects is to formulate realistic schedules that will make it possible to meet contractual completion dates with limited resources and budgets. The scheduling software products currently used in construction projects, which include Primavera P6, Microsoft Project, etc., are not actually applied as a scheduling tool in practical construction projects, which instead generally depend on Microsoft Excel or a bar-chart. This is because the existing scheduling programs cannot provide more user-oriented schedule format such as representing two-way multiple overlapping relationships. To overcome this deficiency, the BDM (beeline diagramming method) is proposed as a new networking technique in 2010. But two-way multiple overlapping relationships generate the loop in a conventional schedule computation process. This paper addresses the loop phenomenon of two-way multiple overlapping relationships in a BDM network as well as proposes the solutions of them, and then presents a practical application of two-way multiple overlapping relationships at a real project.
文摘With rapid development of PetroChina's Qinghai Oilfield, engineering construction quality becomes more and more important in infrastructure construction of the oilfield. Generally speaking, engineering construction quality is related both to national economic development and safety of people and assets. To turn a design map into a materialized object, the construction project involves a large number of elements, such as design, materials, machinery, landform, geological factors, meteorological factors, construction process, technological measures and supervision system. Therefore, quality control holds the key to a construction project.