吕家坨矿巷道小夹角大跨度开口掘进技术研究 被引量:1
1
作者 尹红波 《内蒙古煤炭经济》 2016年第11期138-138,146,共2页
介绍吕家坨矿6271掘进工作面基本情况和6271轨道巷开口掘进的技术措施,通过此工作面6271轨道巷小夹角大跨度开口掘进支护工艺实践的分析,保证了小夹角大跨度台棚巷道开口的顺利施工和支护强度的满足需要,并满足了后期准备安装的使用要... 介绍吕家坨矿6271掘进工作面基本情况和6271轨道巷开口掘进的技术措施,通过此工作面6271轨道巷小夹角大跨度开口掘进支护工艺实践的分析,保证了小夹角大跨度台棚巷道开口的顺利施工和支护强度的满足需要,并满足了后期准备安装的使用要求。对其他掘进工作面开口掘进工作提供借鉴。 展开更多
关键词 开口掘进 大跨度 三角区 联合支护
下载PDF
煤矿掘进机拐弯开口掘进施工巷道 被引量:3
2
作者 任五星 《同煤科技》 2015年第4期48-49,52,共3页
利用钢丝绳吊挂转载机做作直线运动实现煤矿掘进机拐弯开口掘进施工巷道。介绍了装置的制造、安装、使用方法、技术特征、操作安全注意事项、使用价值等。
关键词 机掘工作面 掘进机拐弯开口掘进 转载机吊挂
下载PDF
拐弯巷道掘进机直接开口施工工艺 被引量:3
3
作者 孙晋文 《江西煤炭科技》 2017年第2期184-186,共3页
为提高掘进效率和施工安全性,以屯兰矿12412顺槽绕道施工为例,采用掘进机直接开口掘进施工工艺,安全顺利实现拐弯巷道全程机械化掘进。
关键词 拐弯巷道 机械化掘进 掘进开口 施工工艺
下载PDF
Lake Mead Intake No. 3 被引量:2
4
作者 Jon Hurt Claudio Cimiotti 《Engineering》 SCIE EI 2017年第6期880-887,共8页
As a result of a sustained drought in the Southwestern United States, and in order to maintain existing water capacity in the Las Vegas Valley, the Southern Nevada Water Authority constructed a new deep- water intake ... As a result of a sustained drought in the Southwestern United States, and in order to maintain existing water capacity in the Las Vegas Valley, the Southern Nevada Water Authority constructed a new deep- water intake (Intake No. 3) located in Lake Mead. The project included a 185 m deep shaft, 4.7 km tunnel under very difficult geological conditions, and marine works for a submerged intake. This paper presents the experience that was gained during the design and construction and the innovative solutions that were developed to handle the difficult conditions that were encountered during tunneling with a dual- mode slurry tunnel-boring machine (TBM) in up to 15 bar (l bar = l0s Pa) pressure. Specific attention is given to the main challenges that were overcome during the TBM excavation, which included the mode of operation, face support pressures, pre-excavation grouting, and maintenance; to the construction of the intake, which involved deep underwater shaft excavation with blasting using shaped charges; to the construction of the innovative over 1200 t concrete-and-steel intake structure; to the placement of the intake structure in the underwater shaft; and to the docking and connection to an intake tunnel excavated by hybrid TBM. 展开更多
关键词 Sub-aqueous tunneling Tunnel-boring machine excavation Water intakes