Based on the geological condition of Zhangxiaolou deep mine in Xuzhou mining area, under 986 m in depth, 20.6-31.6 MPa in maximum horizontal principal stress, and friable and fractured surrounding rock, test researche...Based on the geological condition of Zhangxiaolou deep mine in Xuzhou mining area, under 986 m in depth, 20.6-31.6 MPa in maximum horizontal principal stress, and friable and fractured surrounding rock, test researches on partial relieving pressure were completed for the entry with U-steel arched yielding support. The relieving pressure parameters, technology process and results of springing blasting by boreholes and excavating pockets in the two sides of entry were introduced. It is demonstrated that springing will not be shaped under the condition of single borehole arrangement after exploded, the arrangement by a group, it will make borehole bottom form springing in 0.6-0.8 m in diameter, that convergence of two sides and roof to floor have some increments by using springing blasting for reliving pressure. This kind of method for reliving pressure is not suitable to use in the deep mine, and that the convergence of two sides obviously declined by excavating pocket in two sides, it can be still used in the entry with metal support, while maintenance of entry in deep mines is difficult, and can not be supported by bolt or bolt with wire mesh.展开更多
The scalloped medium-length hole blasting mining method used in Dahongshan Copper Mine accounted for more than 61%of the total amount of mining,but the large boulder yield restricted the intensity of ore supply for mi...The scalloped medium-length hole blasting mining method used in Dahongshan Copper Mine accounted for more than 61%of the total amount of mining,but the large boulder yield restricted the intensity of ore supply for mines,and the average boulder yield was as high as 22.7%.In order to develop the mine production efficiency,the circular medium-length hole blasting technology was proposed and field tests were carried out.The test results showed that circular medium-length hole blasting mining can reduce the average boulder yield to 10.3%.Compared with the traditional scalloped medium-length hole blasting mining,the average boulder yield was decreased by 12.4%.The daily yield of ore for the panel on duty was increased by 152.29 t,and the growth rate was 51.1%.The new technology can reduce the time for the handling of boulder and the consumption of explosives and detonators for recrushing,and increase the efficiency of mining while reduce the mining cost,which has received good blasting effects.展开更多
基金Supported by the Key Project of the National Natural Science Foundation (50490273)
文摘Based on the geological condition of Zhangxiaolou deep mine in Xuzhou mining area, under 986 m in depth, 20.6-31.6 MPa in maximum horizontal principal stress, and friable and fractured surrounding rock, test researches on partial relieving pressure were completed for the entry with U-steel arched yielding support. The relieving pressure parameters, technology process and results of springing blasting by boreholes and excavating pockets in the two sides of entry were introduced. It is demonstrated that springing will not be shaped under the condition of single borehole arrangement after exploded, the arrangement by a group, it will make borehole bottom form springing in 0.6-0.8 m in diameter, that convergence of two sides and roof to floor have some increments by using springing blasting for reliving pressure. This kind of method for reliving pressure is not suitable to use in the deep mine, and that the convergence of two sides obviously declined by excavating pocket in two sides, it can be still used in the entry with metal support, while maintenance of entry in deep mines is difficult, and can not be supported by bolt or bolt with wire mesh.
基金National Natural Science Foundation of China (No. 51304087) Foundation Projects of Yun- nan Province (No. KKSY201404056, No. KKSA201121083)
文摘The scalloped medium-length hole blasting mining method used in Dahongshan Copper Mine accounted for more than 61%of the total amount of mining,but the large boulder yield restricted the intensity of ore supply for mines,and the average boulder yield was as high as 22.7%.In order to develop the mine production efficiency,the circular medium-length hole blasting technology was proposed and field tests were carried out.The test results showed that circular medium-length hole blasting mining can reduce the average boulder yield to 10.3%.Compared with the traditional scalloped medium-length hole blasting mining,the average boulder yield was decreased by 12.4%.The daily yield of ore for the panel on duty was increased by 152.29 t,and the growth rate was 51.1%.The new technology can reduce the time for the handling of boulder and the consumption of explosives and detonators for recrushing,and increase the efficiency of mining while reduce the mining cost,which has received good blasting effects.