期刊文献+
共找到3篇文章
< 1 >
每页显示 20 50 100
河北金厂峪金矿大竖井卷扬硐室改造实践
1
作者 刘春琦 时跃宁 +1 位作者 王静波 宫建国 《黄金》 CAS 2018年第7期45-48,53,共5页
针对金厂峪金矿大竖井存在的设备老化、提升能力小及安全隐患等问题,对大竖井进行改造,重点介绍了卷扬硐室的改造过程。提出了卷扬硐室片帮压顶与开挖下掘2种改造方案,对2种改造方案进行经济技术分析,确定采用负水平标高布置卷扬硐室的... 针对金厂峪金矿大竖井存在的设备老化、提升能力小及安全隐患等问题,对大竖井进行改造,重点介绍了卷扬硐室的改造过程。提出了卷扬硐室片帮压顶与开挖下掘2种改造方案,对2种改造方案进行经济技术分析,确定采用负水平标高布置卷扬硐室的方案进行施工。在实际改造和使用过程中,卷扬硐室采用负水平标高布置形式,未破坏绳道和卷扬硐室支护,节省了工程量,节约成本37.74万元,应用效果较好,可供同类型矿山卷扬硐室改造借鉴参考。 展开更多
关键词 竖井 卷扬硐室 片帮压顶 开挖下掘 经济性
下载PDF
Lake Mead Intake No. 3 被引量:2
2
作者 Jon Hurt Claudio Cimiotti 《Engineering》 SCIE EI 2017年第6期880-887,共8页
As a result of a sustained drought in the Southwestern United States, and in order to maintain existing water capacity in the Las Vegas Valley, the Southern Nevada Water Authority constructed a new deep- water intake ... As a result of a sustained drought in the Southwestern United States, and in order to maintain existing water capacity in the Las Vegas Valley, the Southern Nevada Water Authority constructed a new deep- water intake (Intake No. 3) located in Lake Mead. The project included a 185 m deep shaft, 4.7 km tunnel under very difficult geological conditions, and marine works for a submerged intake. This paper presents the experience that was gained during the design and construction and the innovative solutions that were developed to handle the difficult conditions that were encountered during tunneling with a dual- mode slurry tunnel-boring machine (TBM) in up to 15 bar (l bar = l0s Pa) pressure. Specific attention is given to the main challenges that were overcome during the TBM excavation, which included the mode of operation, face support pressures, pre-excavation grouting, and maintenance; to the construction of the intake, which involved deep underwater shaft excavation with blasting using shaped charges; to the construction of the innovative over 1200 t concrete-and-steel intake structure; to the placement of the intake structure in the underwater shaft; and to the docking and connection to an intake tunnel excavated by hybrid TBM. 展开更多
关键词 Sub-aqueous tunneling Tunnel-boring machine excavation Water intakes
下载PDF
Production analysis of functionally distributed machines for underground mining
3
作者 Fukui Rui Kusaka Kouhei +3 位作者 Nakao Masayuki Kodama Yuichi Uetake Masaaki Kawai Kazunari 《International Journal of Mining Science and Technology》 SCIE EI CSCD 2016年第3期477-485,共9页
Recent years, underground mining method is becoming popular because of its potentially high productivity and efficiency. In this method, a mining machinery; load haul dump(LHD), is used as both an excavator and a tran... Recent years, underground mining method is becoming popular because of its potentially high productivity and efficiency. In this method, a mining machinery; load haul dump(LHD), is used as both an excavator and a transporter of ore. This paper proposes a distributed system that realizes the excavation and transport functions with separated vehicles, an excavator and a transporter. In addition, this research proposes a mining map and configurations suitable for the proposed distributed system. To evaluate the productivity of the proposed system, a simulation environment has been developed. Analysis using the simulator reveals what performance factors of the excavator and the transporter have large impacts on the productivity. Simulation results also demonstrate the difference of potential between LHD system and the distributed system that can be explained based on their functions allocation. 展开更多
关键词 Underground mining Mining machinery Autonomous system design Distributed system System configuration
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部