期刊文献+
共找到3篇文章
< 1 >
每页显示 20 50 100
黄河内蒙古河段不同开河形势对洪峰形成的影响
1
作者 李军 杨发扬 +2 位作者 王凯 李红 赵娜 《内蒙古水利》 2013年第2期50-51,共2页
文章分析了黄河内蒙古河段的两种开河形势,在不同气温影响下的槽蓄水增量变化,并利用气温变化过程线和槽蓄水增量变化过程线对开河形势进行预测。
关键词 开河形势 槽蓄水增量 开河形势预测
原文传递
2007~2008年度龙、刘水库用于黄河宁蒙河段防凌作用分析 被引量:1
2
作者 雷鸣 高治定 《黑龙江大学工程学报》 2012年第1期37-42,共6页
依据龙、刘水库防凌运用40a的资料,2007~2008年度凌汛期兰州站下泄水量虽较多,但仍处于较常见范围之内;该年度流凌、封河初期、稳封期、开河期流量控制符合水库防凌调度基本要求。流凌初封期下泄流量比较理想,稳封期比近9a平均偏大110m... 依据龙、刘水库防凌运用40a的资料,2007~2008年度凌汛期兰州站下泄水量虽较多,但仍处于较常见范围之内;该年度流凌、封河初期、稳封期、开河期流量控制符合水库防凌调度基本要求。流凌初封期下泄流量比较理想,稳封期比近9a平均偏大110m3/s左右。开河期控泄力度不足。在头道拐站过流能力较小情况下,兰州站从1月中旬流量缓慢递减率和总量偏小,三湖河口站上下河段槽蓄水增量在2月持续增加,至3月中旬最大,加重了开河期负担。在开河前夕三湖河口站槽蓄水释放强度大,导致凌灾发生。 展开更多
关键词 水库泄流过程 最大槽蓄水增量 开河形势 宁蒙河段
下载PDF
Water Security Situation in Haihe River Basin after South-to-North Water Transfer Project
3
作者 JIA Shaofeng YAN Tingting LÜ Aifeng 《Bulletin of the Chinese Academy of Sciences》 2012年第1期92-98,共7页
The over-exploitation of water resources in the Haihe River Basin (HRB) has now become a serious problem. This is clearly evidenced by the fact that many local rivers and lakes are drying up and the total amount of ... The over-exploitation of water resources in the Haihe River Basin (HRB) has now become a serious problem. This is clearly evidenced by the fact that many local rivers and lakes are drying up and the total amount of over-exploited groundwater has reached over 1000×10^8m^3. It is important to note that the exploitation of water resources in HRB was reasonable before 1979. After 1980, however, over-exploitation happened with an annual average amount of 40×10^8m^3. Both the dry season and rapid economic growth in HRB took place at the same time. Therefore, the over-exploitation of water in HRB was actually the negative result of the conjunction of a continuous dry season and rapid economic growth. So the over-exploitation would not be as serious as it is today if either of the above two stopped. After the first stage of south-to-north water transfer project, the water shortage problem in HRB could be eased for the following reasons: firstly, water transfer project will bring to the Basin 60x108m3 water resources; secondly, a wet season will come back eventually according to natural law of climate variability; finally, its agricultural and industrial use and total water consumption all have decreased from the peak value, so that the groundwater table will raise certainly and ecological water in rivers and lakes that were dried-up will be partly restored. In the future, the main problem of water resources security in HRB will include water pollution, operation risk of the south-to-north water transfer project, groundwater pollution and engineering geological hazards that may be brought by groundwater rise. The proposed countermeasures are as follows: keeping strengthening water demand management, raising water price as well as subsidies for the low- income family and improving other water related policies, preventing and dealing with water pollution seriously and getting fully prepared for the operation of south-to-north water transfer project. 展开更多
关键词 Haihe River Basin south-to-north water transfer project water resource security
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部