This study investigates the influence of different pantograph parameters and train length on the aerodynamic drag of high-speed train by the delayed detached eddy simulation(DDES) method. The train geometry considered...This study investigates the influence of different pantograph parameters and train length on the aerodynamic drag of high-speed train by the delayed detached eddy simulation(DDES) method. The train geometry considered is the high-speed train with pantographs, and the different versions have 3, 5, 8, 10, 12, 16 and 17 cars. The numerical results are verified by the wind tunnel test with 3.6% difference. The influences of the number of cars and the position, quantity and configuration of pantographs on flow field around high-speed train and wake vortices are analyzed. The aerodynamic drag of middle cars gradually decreases along the flow direction. The aerodynamic drag of pantographs decreases with its backward shift, and that of the first pantograph decreases significantly. As the number of pantographs increases, its effect on the aerodynamic drag decrease of rear cars is more significant. The engineering application equation for the aerodynamic drag of high-speed train with pantographs is proposed. For the 10-car and 17-car train, the differences of total aerodynamic drag between the equation and the simulation results are 1.2% and 0.4%, respectively. The equation generalized in this study could well guide the design phase of high-speed train.展开更多
High-density resistivity method is a new, efficient electrical prospecting method, which can complete a two-dimensional (vertical and horizontal) prospecting process, possesses certain imaging functions for the geo-...High-density resistivity method is a new, efficient electrical prospecting method, which can complete a two-dimensional (vertical and horizontal) prospecting process, possesses certain imaging functions for the geo-electric structure, and integrates electric profiling method with electric sounding method together. In this paper, the basic principle, data processing, and result explanation and inference of high- density resistivity method are introduced by taking the application of high-density resistivity method to the prospecting project in the slope of Gongchangling Open Pit, Liaoyang. The result of the prospecting result map analysis showed that the prospecting result was basically in line with the actual situation and proved the great significance of high-density resistivity method to the evaluation on the slope stability of Gongchangling open pit.展开更多
The significant increase in speed of high-speed train will cause the dynamic contact force of the pantograph-catenary system to fluctuate more severely,which poses a challenge to the study of the pantograph-catenary r...The significant increase in speed of high-speed train will cause the dynamic contact force of the pantograph-catenary system to fluctuate more severely,which poses a challenge to the study of the pantograph-catenary relationship and the design of highspeed pantographs.Good pantograph-catenary coupling quality is the essential condition to ensure safe and efficient operation of high-speed train,stable and reliable current collection,and reduction in the wear of contact wires and pantograph contact strips.Among them,the dynamic parameters of high-speed pantographs are crucial to pantograph-catenary coupling quality.With the reduction of the standard deviation of the pantograph-catenary contact force as the optimization goal,multi-parameter joint optimization designs for the high-speed pantograph with two contact strips at multiple running speeds are proposed.Moreover,combining the sensitivity analysis at the optimal solutions,with the parameters and characteristics of in-service DSA380 highspeed pantograph,the optimization proposal of DSA380 was given.展开更多
基金Projects(2018YFB1201801-4,2018YFB1201804-2)supported by National Key R&D Program of China。
文摘This study investigates the influence of different pantograph parameters and train length on the aerodynamic drag of high-speed train by the delayed detached eddy simulation(DDES) method. The train geometry considered is the high-speed train with pantographs, and the different versions have 3, 5, 8, 10, 12, 16 and 17 cars. The numerical results are verified by the wind tunnel test with 3.6% difference. The influences of the number of cars and the position, quantity and configuration of pantographs on flow field around high-speed train and wake vortices are analyzed. The aerodynamic drag of middle cars gradually decreases along the flow direction. The aerodynamic drag of pantographs decreases with its backward shift, and that of the first pantograph decreases significantly. As the number of pantographs increases, its effect on the aerodynamic drag decrease of rear cars is more significant. The engineering application equation for the aerodynamic drag of high-speed train with pantographs is proposed. For the 10-car and 17-car train, the differences of total aerodynamic drag between the equation and the simulation results are 1.2% and 0.4%, respectively. The equation generalized in this study could well guide the design phase of high-speed train.
文摘High-density resistivity method is a new, efficient electrical prospecting method, which can complete a two-dimensional (vertical and horizontal) prospecting process, possesses certain imaging functions for the geo-electric structure, and integrates electric profiling method with electric sounding method together. In this paper, the basic principle, data processing, and result explanation and inference of high- density resistivity method are introduced by taking the application of high-density resistivity method to the prospecting project in the slope of Gongchangling Open Pit, Liaoyang. The result of the prospecting result map analysis showed that the prospecting result was basically in line with the actual situation and proved the great significance of high-density resistivity method to the evaluation on the slope stability of Gongchangling open pit.
基金the National Natural Science Foundation of China(Grant No.11672297)the Strategic Priority Research Program of the Chinese Academy of Sciences(Grant No.XDB22020200).
文摘The significant increase in speed of high-speed train will cause the dynamic contact force of the pantograph-catenary system to fluctuate more severely,which poses a challenge to the study of the pantograph-catenary relationship and the design of highspeed pantographs.Good pantograph-catenary coupling quality is the essential condition to ensure safe and efficient operation of high-speed train,stable and reliable current collection,and reduction in the wear of contact wires and pantograph contact strips.Among them,the dynamic parameters of high-speed pantographs are crucial to pantograph-catenary coupling quality.With the reduction of the standard deviation of the pantograph-catenary contact force as the optimization goal,multi-parameter joint optimization designs for the high-speed pantograph with two contact strips at multiple running speeds are proposed.Moreover,combining the sensitivity analysis at the optimal solutions,with the parameters and characteristics of in-service DSA380 highspeed pantograph,the optimization proposal of DSA380 was given.