Mario Monti, Chairman of the EU Competition Committee pointed out in may 20002 that his committee had received many complaint from the users, they said in their letters that the consuming goods for the printers in Eur...Mario Monti, Chairman of the EU Competition Committee pointed out in may 20002 that his committee had received many complaint from the users, they said in their letters that the consuming goods for the printers in Europe were very expensive. The manufactures of the printers sold in Europe now are against the rule of fair competition. The European Union will take measures according to the “circular economic law” “anti-monopoly law” and “WEER recycle law”. It is believed that it will influence the Chinese consuming展开更多
Work study is an area of construction production rationalization in which with scientific, logical, holistic and system analysis methods of the process we gain optimum in way of work and time of work. Chronometry meth...Work study is an area of construction production rationalization in which with scientific, logical, holistic and system analysis methods of the process we gain optimum in way of work and time of work. Chronometry method is one of the work study methods which is appropriate for recording shorter cyclic processes and is based on statistical sampling theory. Determination of cyclic times and work performances of standard cyclic construction machines (SCCM) is one of key assumptions of dynamic planning of machine work on every construction site. Calculation methods of SCCM work performances arc one of basic research objects in the field of construction organization and technology. Study shows applied chronometry method in work of standard cyclic construction machine. Goal of this study is to accomplish regulation through measured time cycle and compare measured effects with effects obtained with standard methodology of calculating hydraulic excavator practical achievement for gaining regulation in order to determine main reasons which effect work performance on site.展开更多
This paper presents an innovative method to facilitate making such a plan. Using an algorithm to schedule the starting time of each evacuation group, the method guarantees that the time of completing a large-scale eva...This paper presents an innovative method to facilitate making such a plan. Using an algorithm to schedule the starting time of each evacuation group, the method guarantees that the time of completing a large-scale evacuation is very close to its theoretically shortest evacuation time. Meanwhile, unlike a simultaneous evacuation, during a staged evacuation planned with the proposed method, all evacuees can take the shortest path to a safe exit. Once evacuees start off, they will not suffer any traffic congestion. The above advantages of this innovative method are achieved by using an algorithm with three nested loops. Experiments have been conducted, and their results have validated the proposed method.展开更多
文摘Mario Monti, Chairman of the EU Competition Committee pointed out in may 20002 that his committee had received many complaint from the users, they said in their letters that the consuming goods for the printers in Europe were very expensive. The manufactures of the printers sold in Europe now are against the rule of fair competition. The European Union will take measures according to the “circular economic law” “anti-monopoly law” and “WEER recycle law”. It is believed that it will influence the Chinese consuming
文摘Work study is an area of construction production rationalization in which with scientific, logical, holistic and system analysis methods of the process we gain optimum in way of work and time of work. Chronometry method is one of the work study methods which is appropriate for recording shorter cyclic processes and is based on statistical sampling theory. Determination of cyclic times and work performances of standard cyclic construction machines (SCCM) is one of key assumptions of dynamic planning of machine work on every construction site. Calculation methods of SCCM work performances arc one of basic research objects in the field of construction organization and technology. Study shows applied chronometry method in work of standard cyclic construction machine. Goal of this study is to accomplish regulation through measured time cycle and compare measured effects with effects obtained with standard methodology of calculating hydraulic excavator practical achievement for gaining regulation in order to determine main reasons which effect work performance on site.
基金supported by the National Natural Science Foundation of China under Grant No.40730526Scientific Research Starting Foundation for Returned Overseas Chinese Scholars(Ministry of Education,China)+2 种基金 the Key Lab of Geographical Information Science under Grant No.KLGIS2011C01Shanghai Natural Science Foundation under Grant No.11ZR1410100Open Grant from Shanghai Key Lab for Urban Ecology and Sustainability(SHUES)
文摘This paper presents an innovative method to facilitate making such a plan. Using an algorithm to schedule the starting time of each evacuation group, the method guarantees that the time of completing a large-scale evacuation is very close to its theoretically shortest evacuation time. Meanwhile, unlike a simultaneous evacuation, during a staged evacuation planned with the proposed method, all evacuees can take the shortest path to a safe exit. Once evacuees start off, they will not suffer any traffic congestion. The above advantages of this innovative method are achieved by using an algorithm with three nested loops. Experiments have been conducted, and their results have validated the proposed method.