Power systems in Germany mainly containing intermittently operating renewable sources require load/frequency control which is performed up to now at the AC transmissioh and distribution levels. Frequency control can b...Power systems in Germany mainly containing intermittently operating renewable sources require load/frequency control which is performed up to now at the AC transmissioh and distribution levels. Frequency control can be achieved by employing short-and long-term storage plants buffering and complementing renewable energy sources. A representative grid consists of a natural-gas-fired plant serving as frequency leader, long-term storage plant, wind-power farm with associated short-term storage plantfor energy buffering, and photovoltaic farm with associated short-term storage plant interconnected by a long transmission line to two load circuits. Transient analysis is performed with Mathemafica solving the differential equation system for frequency variation. Powerflow through the AC transmission line is limited by its impedance. The long transmission line must be segmented to achieve stability and voltage control over an 800 km distance. The renewable plants must be operated together with the storage plants in order tominimize frequency variations by smoothing the power output of renewable plants, achieving step-wise control of the transmission-line power. Although to date only AC Iransmission lines in Germany exist, it is anticipated that within the next 10 years these will beaugmented by DC high-voltage lines.展开更多
文摘Power systems in Germany mainly containing intermittently operating renewable sources require load/frequency control which is performed up to now at the AC transmissioh and distribution levels. Frequency control can be achieved by employing short-and long-term storage plants buffering and complementing renewable energy sources. A representative grid consists of a natural-gas-fired plant serving as frequency leader, long-term storage plant, wind-power farm with associated short-term storage plantfor energy buffering, and photovoltaic farm with associated short-term storage plant interconnected by a long transmission line to two load circuits. Transient analysis is performed with Mathemafica solving the differential equation system for frequency variation. Powerflow through the AC transmission line is limited by its impedance. The long transmission line must be segmented to achieve stability and voltage control over an 800 km distance. The renewable plants must be operated together with the storage plants in order tominimize frequency variations by smoothing the power output of renewable plants, achieving step-wise control of the transmission-line power. Although to date only AC Iransmission lines in Germany exist, it is anticipated that within the next 10 years these will beaugmented by DC high-voltage lines.