期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
瑞金市毛竹产业经营现状及发展对策
1
作者 陈军 钟宝群 罗振瑞 《江西农业》 2023年第6期88-90,共3页
本文以瑞金市毛竹产业为研究对象,通过全面考察评估瑞金市毛竹林资源基础及毛竹产业发展现状、基本成效与制约毛竹产业发展的主要问题,探究毛竹市场潜力,分析市场竞争力,提出毛竹产业建设发展若干建议和产业发展路径,为相关部门的工作... 本文以瑞金市毛竹产业为研究对象,通过全面考察评估瑞金市毛竹林资源基础及毛竹产业发展现状、基本成效与制约毛竹产业发展的主要问题,探究毛竹市场潜力,分析市场竞争力,提出毛竹产业建设发展若干建议和产业发展路径,为相关部门的工作决策提供科学依据。 展开更多
关键词 毛竹林资源 产业现状问题 成效评估分析 发展措施路径 建议
下载PDF
The Bruce Highway Action Plan Program Evaluation
2
作者 Wayne Mark Davies 《Journal of Civil Engineering and Architecture》 2015年第3期350-367,共18页
The BHAP (Bruce Highway Action Plan) Program Evaluation was a momentous task conducted in most part by the TMR (Transport and Main Roads) CBA (cost benefit analysis) team. The evaluation included 189 overtaking ... The BHAP (Bruce Highway Action Plan) Program Evaluation was a momentous task conducted in most part by the TMR (Transport and Main Roads) CBA (cost benefit analysis) team. The evaluation included 189 overtaking lanes, 404 km of road widening and shoulder sealing in various places between Brisbane and Cairns, 56 capacity focused projects and 16 flood immunity focused projects. The total projected capital costs of all projects proposed as part of the BHAP amounted to over 16 billion dollars. The program evaluation conducted, due to the short timeframes, lack of available data and strategic nature of the plan, has been "coined" a strategic evaluation. This paper focuses on the methodology applied to the projects proposed in the BHAP. A TMR designed project/program evaluation model (CARP (Concise Analysis of Road Programs) V1.0) was used to evaluate the majority of the proposed BHAP projects. The model produces streams of discounted benefits and costs of the projects and program using limited and incomplete data. The large scale of work and the close proximity of projects allowed for an integrated approach to the analysis, which considered the impact projects have on each other. The result of the program, if all evaluated projects are included, is a BCR (benefit cost ratio) of approximately 0.7l at a discount rate of 7%. If the less viable projects are removed from the program, the program can obtain a benefit cost ratio of greater than 1 with a sufficiently large number of projects remaining. 展开更多
关键词 Program evaluation cost benefit analysis Bruce Highway.
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部