期刊文献+
共找到3篇文章
< 1 >
每页显示 20 50 100
酸槽失火原因分析及对策
1
作者 杨必祥 《设备管理与维修》 2005年第7期13-14,共2页
某冷轧薄板厂连轧机组酸洗槽失火,主要原因有:轧辊包胶层脱落、纠偏装置接近开关异常、烟雾抽排装置抽排量不足,就此提出相应的整改措施。
关键词 原因分析 失火 酸槽 冷轧薄板厂 连轧机组 接近开关 纠偏装置 整改措施 酸洗槽 包胶层 抽排量 轧辊
下载PDF
泵站技术改造中主机泵大修方案的选择
2
作者 尹德庆 《排灌机械》 2003年第1期38-39,共2页
介绍了新沭河大浦抽水站改造的过程及存在问题,分析了该站实施的主泵大修方案,具有简单经济、抽排量大的特点。
关键词 泵站 技术改造 主机泵 大修方案 抽排量
下载PDF
Patterns and security technologies for co-extraction of coal and gas in deep mines without entry pillars 被引量:5
3
作者 Nong Zhang Fei Xue Nianchao Zhang Xiaowei Feng 《International Journal of Coal Science & Technology》 EI 2015年第1期66-75,共10页
Retaining gob-side entryways and the stability of gas drainage boreholes are two essential techniques in the co-extraction of coal and gas without entry pillars (CECGWEP). However, retained entryways located in deep... Retaining gob-side entryways and the stability of gas drainage boreholes are two essential techniques in the co-extraction of coal and gas without entry pillars (CECGWEP). However, retained entryways located in deep coal mines are hard to maintain, especially for constructing boreholes in confined spaces, owing to major deformations. Consequently, it is difficult to drill boreholes and maintain their stability, which therefore cannot guarantee the effectiveness of gas drainage. This paper presents three measures for conducting CECGWEP in deep mines on the basis of effective space in retained entryways for gas drainage, They are combinations of retaining roadways and face-lagging inclined boreholes, retaining roadways and face-advancing inclined boreholes, and retaining roadways and high return airway inclined boreholes. Several essential techniques are suggested to improve the maintenance of retained entryways and the stabilization of boreholes. For the particular cases considered in this study, two field trials have verified the latter two measures from the results obtained from the faces 1111(1) and 11112(1) in the Zhuji Mine. The results indicate that these models can effectively solve the problems in deep mines. The maximum gas drainage flow for a single hole can reach 8.1 m^3/min and the effective drainage distance can be extended up to 150 m or more. 展开更多
关键词 Retaining gob-side entryways Stability of borehole Gas pressure relief Co-extraction of coal and gas without the entry pillar
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部