One of the most important tasks of security is the quality of the project substation substation construction project management, construction project management, including project bidding and engineering, electrical e...One of the most important tasks of security is the quality of the project substation substation construction project management, construction project management, including project bidding and engineering, electrical engineering and civil construction, engineering, quality control, safety management and supervision costs control, on-site supervision over the links, these links chain, indivisible, so long as a part of the management problems, will lead the entire construction project management effectiveness be affected, so it must be every link control and management work done, in order to guarantee the quality of the entire substation, in order to make security of supply substations, electrical safety and vital interests of users are protected. In this paper, the author details the three aspects substation construction management of the project, namely the concept of substation engineering, project management and construction safety, through these three aspects, the author analyzes the construction project management substation existing problems, To solve these problems and issues proposed some measures and construction process that need attention. It launched separately from the design, schedule, quality and other aspects of security and research, and in the course of the study stressed the importance of coordination between elements of construction and construction sectors as well as cooperation between the construction, explains the importance of the project cost control.展开更多
In order to strengthen cost control in construction project bidding stage, this paper takes the price control in bidding stage as the main line, dedicated to determine the key point in the stage of cost control, and e...In order to strengthen cost control in construction project bidding stage, this paper takes the price control in bidding stage as the main line, dedicated to determine the key point in the stage of cost control, and establishes the more objective and reasonable evaluation in view of the comprehensive evaluation method, and combined with the practical application of engineering to demonstrate. This paper not only improved the tendering and bidding stage method of cost control in construction project in our country, and improves the method system of engineering cost control.展开更多
In the 21st century, especially after the accession to WTO, Construction project bidding price formation mechanism is the main characteristics of the market price of the Construction project is divided in a unified, u...In the 21st century, especially after the accession to WTO, Construction project bidding price formation mechanism is the main characteristics of the market price of the Construction project is divided in a unified, uniform measurement unit, unified in terms of engineering and consumption of fixed rules on the basis of the implementation of market, competition fees.The first to be carried out not only the financial decision-making, corporate contractors in accordance with the different ways, according to market conditions, its technology, economic strength, through the financial decision-making self-quotation. Second, it is necessary to exercise effective control, both the Construction project bidding price by the form of the contract price is fixed.By design, material procurement, construction management on the implementation of bidding for the effective control of prices.展开更多
In recent years,the usage,management and benefit of large-scale scientific research instruments and equipment in scientific research institutes have been a leading issue in the management of scientific research instit...In recent years,the usage,management and benefit of large-scale scientific research instruments and equipment in scientific research institutes have been a leading issue in the management of scientific research institutes.Within the scope of equipment budget,it is necessary for each equipment acquisition team to conduct a round of communication,coordination and negotiation with suppliers in order to improve the cost performance of equipment procurement and maximize the performance index to meet the needs of scientific research.By introducing the practical experience of the State Key Laboratory in purchasing imported equipment and managing large-scale instruments,this paper probes into the management process of the imported large-scale scientific research tax-free equipment of scientific research institutes,and explores the system and methods to guarantee and improve the efficiency of large-scale instruments in scientific research institutes from the aspects of policy,funds and technology.展开更多
One year on from its establishment,how is Shanghai’s free trade zone doing thus far?Hony Capital,founded in 2003,is a leading private equity firm in China.It mainly focuses on investment in advanced manufacturing,he...One year on from its establishment,how is Shanghai’s free trade zone doing thus far?Hony Capital,founded in 2003,is a leading private equity firm in China.It mainly focuses on investment in advanced manufacturing,health-care and service sectors both at home and abroad.In the past,when Hony Capital would bid for overseas acquisition,it had to add a caveat in the bidding papers—if the acquisition failed to展开更多
文摘One of the most important tasks of security is the quality of the project substation substation construction project management, construction project management, including project bidding and engineering, electrical engineering and civil construction, engineering, quality control, safety management and supervision costs control, on-site supervision over the links, these links chain, indivisible, so long as a part of the management problems, will lead the entire construction project management effectiveness be affected, so it must be every link control and management work done, in order to guarantee the quality of the entire substation, in order to make security of supply substations, electrical safety and vital interests of users are protected. In this paper, the author details the three aspects substation construction management of the project, namely the concept of substation engineering, project management and construction safety, through these three aspects, the author analyzes the construction project management substation existing problems, To solve these problems and issues proposed some measures and construction process that need attention. It launched separately from the design, schedule, quality and other aspects of security and research, and in the course of the study stressed the importance of coordination between elements of construction and construction sectors as well as cooperation between the construction, explains the importance of the project cost control.
文摘In order to strengthen cost control in construction project bidding stage, this paper takes the price control in bidding stage as the main line, dedicated to determine the key point in the stage of cost control, and establishes the more objective and reasonable evaluation in view of the comprehensive evaluation method, and combined with the practical application of engineering to demonstrate. This paper not only improved the tendering and bidding stage method of cost control in construction project in our country, and improves the method system of engineering cost control.
文摘In the 21st century, especially after the accession to WTO, Construction project bidding price formation mechanism is the main characteristics of the market price of the Construction project is divided in a unified, uniform measurement unit, unified in terms of engineering and consumption of fixed rules on the basis of the implementation of market, competition fees.The first to be carried out not only the financial decision-making, corporate contractors in accordance with the different ways, according to market conditions, its technology, economic strength, through the financial decision-making self-quotation. Second, it is necessary to exercise effective control, both the Construction project bidding price by the form of the contract price is fixed.By design, material procurement, construction management on the implementation of bidding for the effective control of prices.
文摘In recent years,the usage,management and benefit of large-scale scientific research instruments and equipment in scientific research institutes have been a leading issue in the management of scientific research institutes.Within the scope of equipment budget,it is necessary for each equipment acquisition team to conduct a round of communication,coordination and negotiation with suppliers in order to improve the cost performance of equipment procurement and maximize the performance index to meet the needs of scientific research.By introducing the practical experience of the State Key Laboratory in purchasing imported equipment and managing large-scale instruments,this paper probes into the management process of the imported large-scale scientific research tax-free equipment of scientific research institutes,and explores the system and methods to guarantee and improve the efficiency of large-scale instruments in scientific research institutes from the aspects of policy,funds and technology.
文摘One year on from its establishment,how is Shanghai’s free trade zone doing thus far?Hony Capital,founded in 2003,is a leading private equity firm in China.It mainly focuses on investment in advanced manufacturing,health-care and service sectors both at home and abroad.In the past,when Hony Capital would bid for overseas acquisition,it had to add a caveat in the bidding papers—if the acquisition failed to