期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
南村隧道与挖煤巷道交会处理技术 被引量:2
1
作者 申国奎 谷文元 《市政技术》 2012年第2期81-83,115,共4页
南村隧道是北京108国道改建工程中的重点工程,在施工过程中遭遇挖煤巷道,对隧道的施工安全构成了巨大威胁。施工中采取技术措施,为隧道顺利通过挖煤巷道段提供了安全保证。
关键词 公路隧道 挖煤巷道 交会 处理
下载PDF
Deformation effect of lateral roof roadway in close coal seams after repeated mining 被引量:2
2
作者 Xie Jianlin Xu Jialin +2 位作者 Wang Feng Guo Jiekai Liu Donglin 《International Journal of Mining Science and Technology》 SCIE EI 2014年第5期597-601,共5页
This paper analyzed the deformation mechanism in lateral roof roadway of the Ding Wu-3 roadway which was disturbed by repeated mining of close coal seams Wu-8 and Wu-10 in Pingdingshan No. 1 Mine. To determine the str... This paper analyzed the deformation mechanism in lateral roof roadway of the Ding Wu-3 roadway which was disturbed by repeated mining of close coal seams Wu-8 and Wu-10 in Pingdingshan No. 1 Mine. To determine the strata disturbance scope, the strata displacement angle was used to calculate the protection pillar width. A numerical model was built considering the field geological conditions. In simulation, the mining stress borderline was defined as the contour where the induced stress is 1.5 times of the original stress. Simulation results show the mining stress borderline of the lateral roadway extended 91.7 m outward after repeated mining. Then the original stress increased, deforming the road- way of interest. This deformation agreed with the in situ observations. Moreover, the strata displacement angle changed due to repeated mining. Therefore, reselection of the displacement angle was required to design the protective pillar width. Since a constant strata displacement angle was used in traditional design, the orooosed method was beneficial in field cases. 展开更多
关键词 Repeated mining Mining stress borderline Strata displacement angle Lateral roof roadway Protective pillar
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部