通过现场试验和理论分析研究交通管制对隧道改扩建工程爆破施工进度与交通运营的影响.通过现场监测、数值模拟和理论分析对确定既有隧道衬砌振速控制值的方法进行分析.基于既有隧道衬砌振速控制值对新建隧道爆破参数的优化方法进行分析... 通过现场试验和理论分析研究交通管制对隧道改扩建工程爆破施工进度与交通运营的影响.通过现场监测、数值模拟和理论分析对确定既有隧道衬砌振速控制值的方法进行分析.基于既有隧道衬砌振速控制值对新建隧道爆破参数的优化方法进行分析.对新岭隧道扩建工程的爆破施工关键技术研究表明:(1)改扩建隧道爆破施工时,为了保证爆破施工进度和高速公路的正常营运,既有隧道应采取不实行交通管制的措施;(2)可根据既有隧道的动态监测、健康诊断以及隧道改扩建工程数值模拟来确定既有隧道的爆破振速控制值;(3)提出了基于新建隧道爆破效果与既有隧道安全运营的双目标爆破施工控制措施,给出了基于爆破振速控制值优化新建隧道爆破参数的方法. 展开更多
关键词 隧道改扩建 爆破施工 交通管制 振速控制值 爆破参数优化
下载PDF
Investigation on the threshold control of safety blasting vibration velocity for the extraction of complicated orebody under railway 被引量:6
2
作者 Jiang Lichunt Hu Liuqing Lai Xiuying 《Mining Science and Technology》 EI CAS 2011年第2期169-174,共6页
The threshold control of safety blasting vibration velocity is a significant process for the underground mining of complicated ore deposit under construction,road,and water.According to the equivalent principle of dis... The threshold control of safety blasting vibration velocity is a significant process for the underground mining of complicated ore deposit under construction,road,and water.According to the equivalent principle of displacement and velocity of mass point,differential evolution is put forward based on 3DEC dynamic analysis,making the calculation more efficient and accurate.The 3DEC model of the complicated orebody under railway is established according to the topographic maps and geological data of the eastern Pyrite Mine.The stimulus-response distribution of internal stress and displacement fields are demonstrated by analyzing the on-site monitoring vibration displacement and velocity data of the mass point.The reliability of parameter selection,such as blasting simulation waveforms,rock damping,is identified.The safety vibration velocity of railway is set to 4.5 cm/s in line with the requirement of safety blasting rules.Thus,the maximum amount of single-stage explosive in this region is 44.978 kg.The simulation result is in good agreement with the on-site monitoring datum.No displacement and settlement of the 701 railway special line was achieved by choosing the critical amount of the single-stage explosive. 展开更多
关键词 Mining under construction Road and water Blasting vibration The method of differential evolution Safety velocity Amount of single-stage explosive