城市排水管网模拟系统(Digital Water Simulation)是基于SWMM和GIS技术的可视化建模与动态模拟评估工具,支持一维管网与二维地表的动态耦合模拟计算,完整反映排水管网整体运行负荷变化规律和城市内涝风险。系统按照《城市排水防涝设施...城市排水管网模拟系统(Digital Water Simulation)是基于SWMM和GIS技术的可视化建模与动态模拟评估工具,支持一维管网与二维地表的动态耦合模拟计算,完整反映排水管网整体运行负荷变化规律和城市内涝风险。系统按照《城市排水防涝设施普查数据采集与管理技术导则》(建城[2013]88号)的要求,存储与管理排水系统相关数据,模拟结果满足《城市排水(雨水)防涝综合规划编制大纲》(建城[2013]98号)和新修订的2014年版《室外排水设计规范》(GB50014—2006)的模型相关技术要求。该系统可有效支持排水系统的规划、改造、现状评估诊断和城市内涝风险分析等工作。展开更多
An optimal drainage tunnel location determination method for landslide prevention was proposed to solve the existing problems in drainage tunnel construction. Current applications of drainage tunnel systems in China w...An optimal drainage tunnel location determination method for landslide prevention was proposed to solve the existing problems in drainage tunnel construction. Current applications of drainage tunnel systems in China were reviewed and the fimctions of drainage tunnel were categorized as catchment and interception. Numerical simulations were conducted. The results show that both catchment and interception tunnels have variation of the function in the simulation of monolayer model, which shows the reduction of permeability condition in lower layer. The function of catchment can be observed in the deep slope, while the function of interception is observed near groundwater source. By using the slope safety factor and discharge water amount as the objectives of optimal drainage tunnel location, and pore-water pressure in fixed node and section flux as the judgment for construction quality of adjacent drainage tunnel, the design principle of drainage tunnel was introduced. The K103 Landslide was illustrated as an example to determine the optimal drainage tunnel location. The measured drainage tunnel efficiency was evaluated and compared with that from the numerical analyses based on groundwater data. The results validate the present numerical study.展开更多
Boundary conditions for the classical solution of the Terzaghi one-dimensional consolidation equation conflict with the equation's initial condition. As such, the classical initial-boundary value problem for the Terz...Boundary conditions for the classical solution of the Terzaghi one-dimensional consolidation equation conflict with the equation's initial condition. As such, the classical initial-boundary value problem for the Terzaghi one-dimensional consolidation equation is not well-posed. Moreover, the classical boundary conditions of the equation can only be applied to problems with either perfectly pervious or perfectly impervious boundaries. General boundary conditions are proposed to overcome these shortcomings and thus transfer the solution of the Terzaghi one-dimensional consolidation equation to a well-posed initial boundary value problem. The solution for proposed general boundary conditions is validated by comparing it to the classical solution. The actual field drainage conditions can be simulated by adjusting the values of parameters b and c given in the proposed general botmdary conditions. For relatively high coefficient of consolidation, just one term in series expansions is enough to obtain results with acceptable accuracy.展开更多
Based on the characteristics of the strong volatility of physical property in vertical direction, high gas content, high resource abundance and large exploitation potentiality of coal reservoir in Bide-Santang basin o...Based on the characteristics of the strong volatility of physical property in vertical direction, high gas content, high resource abundance and large exploitation potentiality of coal reservoir in Bide-Santang basin of Zhina coal field, we study the generation mechanism of interlayer interference, propagation rules of reservoir pressure drop and influencing factors of gas productivity in CBM multi-seam drainage in the paper. On the basis of the actual production data of X-2 well of Zhucang syncline in Bide-Santang basin,by simulating the gas production process of a CBM well under the condition of multiple seam with COMET3 numerical simulation software, we analyze the influencing factors of gas productivity during the process of multi-seam drainage, and illuminate the interlayer interference mechanism of multiseam drainage. The results show that permeability, reservoir pressure gradient, critical desorption pressure and fluid supply capacity of stratum have great influence on gas productivity of multi-seam drainage while coal thickness has little influence on it. Permeability, reservoir pressure gradient and fluid supply capacity of stratum affect the propagation velocity of reservoir pressure drop and thereby affect the final gas productivity. Moreover, the influence of critical desorption pressure on gas productivity of multiseam drainage is reflected in the gas breakthrough time and effective desorption area.展开更多
文摘城市排水管网模拟系统(Digital Water Simulation)是基于SWMM和GIS技术的可视化建模与动态模拟评估工具,支持一维管网与二维地表的动态耦合模拟计算,完整反映排水管网整体运行负荷变化规律和城市内涝风险。系统按照《城市排水防涝设施普查数据采集与管理技术导则》(建城[2013]88号)的要求,存储与管理排水系统相关数据,模拟结果满足《城市排水(雨水)防涝综合规划编制大纲》(建城[2013]98号)和新修订的2014年版《室外排水设计规范》(GB50014—2006)的模型相关技术要求。该系统可有效支持排水系统的规划、改造、现状评估诊断和城市内涝风险分析等工作。
基金Foundation item: Project(1220BAK10B06) supported by the National "Twelfth Five-Year" Plan for Science & Technology Support Program of China Project(20100101110026) supported by the PhD Programs Foundation of Ministry of Education of China Project(2009RS0050) supported by the Key Innovation Team Support Fund of Zhejiang Province, China
文摘An optimal drainage tunnel location determination method for landslide prevention was proposed to solve the existing problems in drainage tunnel construction. Current applications of drainage tunnel systems in China were reviewed and the fimctions of drainage tunnel were categorized as catchment and interception. Numerical simulations were conducted. The results show that both catchment and interception tunnels have variation of the function in the simulation of monolayer model, which shows the reduction of permeability condition in lower layer. The function of catchment can be observed in the deep slope, while the function of interception is observed near groundwater source. By using the slope safety factor and discharge water amount as the objectives of optimal drainage tunnel location, and pore-water pressure in fixed node and section flux as the judgment for construction quality of adjacent drainage tunnel, the design principle of drainage tunnel was introduced. The K103 Landslide was illustrated as an example to determine the optimal drainage tunnel location. The measured drainage tunnel efficiency was evaluated and compared with that from the numerical analyses based on groundwater data. The results validate the present numerical study.
基金Foundation item: Project(50608038) supported by the National Natural Science Foundation of China
文摘Boundary conditions for the classical solution of the Terzaghi one-dimensional consolidation equation conflict with the equation's initial condition. As such, the classical initial-boundary value problem for the Terzaghi one-dimensional consolidation equation is not well-posed. Moreover, the classical boundary conditions of the equation can only be applied to problems with either perfectly pervious or perfectly impervious boundaries. General boundary conditions are proposed to overcome these shortcomings and thus transfer the solution of the Terzaghi one-dimensional consolidation equation to a well-posed initial boundary value problem. The solution for proposed general boundary conditions is validated by comparing it to the classical solution. The actual field drainage conditions can be simulated by adjusting the values of parameters b and c given in the proposed general botmdary conditions. For relatively high coefficient of consolidation, just one term in series expansions is enough to obtain results with acceptable accuracy.
基金supported by the National Major Special Project of Science and Technology of China (No.2011ZX05034)the Innovation Projects of University Graduates in Jiangsu Province (No.CXLX13_948)+1 种基金the National Natural Science Foundation of China (No.41272178)the Natural Science Foundation of Hunan Province (No.2016JJ4031)
文摘Based on the characteristics of the strong volatility of physical property in vertical direction, high gas content, high resource abundance and large exploitation potentiality of coal reservoir in Bide-Santang basin of Zhina coal field, we study the generation mechanism of interlayer interference, propagation rules of reservoir pressure drop and influencing factors of gas productivity in CBM multi-seam drainage in the paper. On the basis of the actual production data of X-2 well of Zhucang syncline in Bide-Santang basin,by simulating the gas production process of a CBM well under the condition of multiple seam with COMET3 numerical simulation software, we analyze the influencing factors of gas productivity during the process of multi-seam drainage, and illuminate the interlayer interference mechanism of multiseam drainage. The results show that permeability, reservoir pressure gradient, critical desorption pressure and fluid supply capacity of stratum have great influence on gas productivity of multi-seam drainage while coal thickness has little influence on it. Permeability, reservoir pressure gradient and fluid supply capacity of stratum affect the propagation velocity of reservoir pressure drop and thereby affect the final gas productivity. Moreover, the influence of critical desorption pressure on gas productivity of multiseam drainage is reflected in the gas breakthrough time and effective desorption area.