期刊文献+
共找到4篇文章
< 1 >
每页显示 20 50 100
马鞍山发电厂浓缩池区故障排灰水的处理
1
作者 周宗毅 《安徽电力技术情报》 1993年第7期6-8,共3页
关键词 浓缩池 故障 排灰水 发电厂
下载PDF
包一电厂节水措施与效果
2
作者 席敏祥 《内蒙古电力技术》 1994年第4期16-18,共3页
1 节水的主要措施为了减少水耗,降低生产成本,我厂在科技兴厂中,把节约用水放在重要地位,采取各种技术和管理措施,大力开展节水工作.(1)冬季采暖期回收蒸发站排污水至热网系统,每小时回收15吨,全年回收六个月,年回收6.48万吨.(2)1986年... 1 节水的主要措施为了减少水耗,降低生产成本,我厂在科技兴厂中,把节约用水放在重要地位,采取各种技术和管理措施,大力开展节水工作.(1)冬季采暖期回收蒸发站排污水至热网系统,每小时回收15吨,全年回收六个月,年回收6.48万吨.(2)1986年分别在#1、#3、#4冷水塔加装了收水器回收汽化汽带水造成的损失,年回收水4.32万吨.并且由于加装了收水器,冬季防止汽化水汽带水使水塔附近马路结冰,给行人带来方便,改善了环境,从这层意义上讲,有明显的社会效益.(3)原来我厂#5、#6机零米辅机水泵轴瓦冷却水,盘根冷却水,凝汽器放空气管之排水,均排人地沟,造成生产用水的浪费.经改进后,由排地沟改为排循环水沟重复利用,减少浪费,每小时回收50吨,年回收43.8万吨. 展开更多
关键词 热电厂 排灰水系统
下载PDF
多管旋风除尘器排灰器的改造
3
作者 崔建桥 张晓笑 《维纶通讯》 2002年第1期34-35,共2页
对多管除尘器排灰器进行改造,有效地防止了除尘器的漏风问题,使除尘效率明显提高,解决了灰尘对工作环境的污染及除尘器排灰系统系统堵塞问题,有利于减轻工人劳动强度。
关键词 排灰 技术改造 漏风 除尘效率 多管旋风除尘器 排灰
下载PDF
Application of polymeric flocculant for enhancing settling of the pond ash particles and water drainage from hydraulically stowed pond ash 被引量:1
4
作者 Mishra Devi Prasad Das Samir Kumar 《International Journal of Mining Science and Technology》 SCIE EI 2013年第1期21-26,共6页
Delayed settling of the ash particles and poor drainage of water from the pond ash are the major problems faced during the hydraulic stowing of pond ash. In this study the effect of polymeric flocculant on settling of... Delayed settling of the ash particles and poor drainage of water from the pond ash are the major problems faced during the hydraulic stowing of pond ash. In this study the effect of polymeric flocculant on settling of the ash particles and drainage of water during pond ash stowing are investigated. In addition, the parameters, viz. drainage and absorption of water during pond ash stowing are quantified by stowing a mine goaf model with pond ash slurries of five different concentrations added with and without flocculant. The study revealed that addition of only 5 10 6 of Sodium Carboxymethyl Cellulose (Na-CMC) flocculant with the pond ash slurries during stowing offers best result in terms of quicker settling of the ash particles and enhanced water drainage from the hydraulically stowed pond ash. Besides, it resulted in drainage of more than 85% of the total water used in the initial 45 min of stowing. The improvement in drainage is caused due to coagulation and flocculation of the pond ash particles because of charge neutralization and particle-particle bridging. This study may provide a basis for estimating the drainage and absorption of water during the real pond ash stowing operation in underground mines. 展开更多
关键词 Fly ash Pond ash Stowing Settling Water drainage Polymeric flocculant
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部