智能电网用户接口(smart grid user interface,SGUI)是智能电网重要的跨领域专业内容,近年来,可再生能源、电动汽车及储能装置等的大规模应用,高可靠性优质供电的需求,多元化个性化的互动服务使得电网与用户的信息交互和能源交...智能电网用户接口(smart grid user interface,SGUI)是智能电网重要的跨领域专业内容,近年来,可再生能源、电动汽车及储能装置等的大规模应用,高可靠性优质供电的需求,多元化个性化的互动服务使得电网与用户的信息交互和能源交换更加频繁。SGUI已成为世界智能电网的研究热点,IEC设立了PCI18智能电网用户接口项目委员会,专门研究和制定SGUI国际标准。IEEE与ZigBee联盟合作推出了IEEE2030.5 SEP 2.0,重点关注智慧能源及各种应用。美国NIST牵头组织SGIP发布的优先行动计划中,与SGUI相关的研究包括自动需求响应、能源互操作、能源服务供应商接口和建筑设施智能电网信息模型等。展开更多
In this study, we investigate the optimal location of access points (APs) to connect end nodes with a service provider through power-line communication in smartgrid communication networks. APs are the gateways of po...In this study, we investigate the optimal location of access points (APs) to connect end nodes with a service provider through power-line communication in smartgrid communication networks. APs are the gateways of power-distribution communication networks, connecting users to control centers. Hence, they are vital for the reliable, safe, and economical operation of a power system. This paper proposes a planning method for AP allocation that takes into consideration economics, reliability, network delay, and (n-l) resilience. First, an optimization model for the AP location is established, which minimizes the cost of installing APs, while satisfying the reliability, network delay, and (n-1) resilience constraints. Then, an improved genetic algorithm is proposed to solve the optimization problem. The simulation results indicate that the proposed planning method can deal with diverse network conditions satisfactorily. Furthermore, it can be applied effectively with high flexibility and scalability.展开更多
Constructing an industrial system for a large-scale,non-grid-connected wind power industry is a key step towards the diverse utilization of wind power.However,wind power exploitation is not only a technical challenge ...Constructing an industrial system for a large-scale,non-grid-connected wind power industry is a key step towards the diverse utilization of wind power.However,wind power exploitation is not only a technical challenge but an industrial problem as well.The objective of this study is to introduce a concept of large-scale,non-grid-connected wind power(LSNGCWP) industrial zones and establish an evaluation model to assess their industrial arrangement.The data of wind energy,industry,nature resources and socio-economy were collected in this study.Using spatial overlay analysis of geographic information system,this study proposes a spatial arrangement of the LSNGCWP indus-trial zones in the coastal areas of China,which could be summarized as the 'one line and three circles' structure,which will contribute to the optimization of the industrial structure,advance the wind power technology,coordinate the multi-industrial cooperation,and upgrade the industrial transformation of China's coastal areas.展开更多
In order to fully comprehend the developing status of wind power and photovoltaic (PV) power generation, a special investigation on the integration of wind power and PV power was launched by the agencies of the State ...In order to fully comprehend the developing status of wind power and photovoltaic (PV) power generation, a special investigation on the integration of wind power and PV power was launched by the agencies of the State Electricity Regulatory Commission (SERC) throughout China during July-October 2010. This report is completed based on the investigation along with routine supervisory and management programs. There are totally 573 wind power projects and 94 PV power projects involved. Existing problems in these projects are pointed out and proposals for regulation are put forward.展开更多
The quantity of installed PV (photovoltaic) systems in the German distribution grid is still increasing. In some areas, the installed PV capacity exceeds 5 kW per HC (house connection). Therefore, the load flow ch...The quantity of installed PV (photovoltaic) systems in the German distribution grid is still increasing. In some areas, the installed PV capacity exceeds 5 kW per HC (house connection). Therefore, the load flow changes its characteristics and leads to new requirements for the grid. In some areas, the power feedback is higher than the delivery and the installed PV capacity becomes the decisive factor for grid planning. This paper discusses the impact of PV systems on the flicker level. The focus hereby is on the correlation among the flicker level, the grid voltage and the meteorological parameters. Different approaches to investigate if there is an influence of PV systems on the maximum flicker are taken into account. Furthermore, an investigation if the normative limit is exceeded will be shown.展开更多
基金supported by the National High Technology Research and Development Program of China(2012AA050801)
文摘In this study, we investigate the optimal location of access points (APs) to connect end nodes with a service provider through power-line communication in smartgrid communication networks. APs are the gateways of power-distribution communication networks, connecting users to control centers. Hence, they are vital for the reliable, safe, and economical operation of a power system. This paper proposes a planning method for AP allocation that takes into consideration economics, reliability, network delay, and (n-l) resilience. First, an optimization model for the AP location is established, which minimizes the cost of installing APs, while satisfying the reliability, network delay, and (n-1) resilience constraints. Then, an improved genetic algorithm is proposed to solve the optimization problem. The simulation results indicate that the proposed planning method can deal with diverse network conditions satisfactorily. Furthermore, it can be applied effectively with high flexibility and scalability.
基金Under the auspices of National Basic Research Program (No.2007CB210306)
文摘Constructing an industrial system for a large-scale,non-grid-connected wind power industry is a key step towards the diverse utilization of wind power.However,wind power exploitation is not only a technical challenge but an industrial problem as well.The objective of this study is to introduce a concept of large-scale,non-grid-connected wind power(LSNGCWP) industrial zones and establish an evaluation model to assess their industrial arrangement.The data of wind energy,industry,nature resources and socio-economy were collected in this study.Using spatial overlay analysis of geographic information system,this study proposes a spatial arrangement of the LSNGCWP indus-trial zones in the coastal areas of China,which could be summarized as the 'one line and three circles' structure,which will contribute to the optimization of the industrial structure,advance the wind power technology,coordinate the multi-industrial cooperation,and upgrade the industrial transformation of China's coastal areas.
文摘In order to fully comprehend the developing status of wind power and photovoltaic (PV) power generation, a special investigation on the integration of wind power and PV power was launched by the agencies of the State Electricity Regulatory Commission (SERC) throughout China during July-October 2010. This report is completed based on the investigation along with routine supervisory and management programs. There are totally 573 wind power projects and 94 PV power projects involved. Existing problems in these projects are pointed out and proposals for regulation are put forward.
文摘The quantity of installed PV (photovoltaic) systems in the German distribution grid is still increasing. In some areas, the installed PV capacity exceeds 5 kW per HC (house connection). Therefore, the load flow changes its characteristics and leads to new requirements for the grid. In some areas, the power feedback is higher than the delivery and the installed PV capacity becomes the decisive factor for grid planning. This paper discusses the impact of PV systems on the flicker level. The focus hereby is on the correlation among the flicker level, the grid voltage and the meteorological parameters. Different approaches to investigate if there is an influence of PV systems on the maximum flicker are taken into account. Furthermore, an investigation if the normative limit is exceeded will be shown.