期刊文献+
共找到3篇文章
< 1 >
每页显示 20 50 100
镀锌线光整机控制功能优化
1
作者 刘炜 刘宁平 吴庭松 《昆钢科技》 2017年第3期50-52,56,共4页
本文介绍了镀锌线的关键设备光整机,发现光整机自投入运行以来暴露的一些问题,并针对性的提出了解决方法。方案实施以来,改善了光整机的控制功能,提高了设备稳定性。效果显著。
关键词 连续热镀锌 光整机 控制功能优化
下载PDF
Self-adapting Scalable Differential Evolution Algorithm
2
作者 刘荣辉 郑建国 《Journal of Donghua University(English Edition)》 EI CAS 2011年第4期384-390,共7页
Differential evolution(DE) demonstrates good convergence performance,but it is difficult to choose trial vector generation strategies and associated control parameter values.An improved method,self-adapting scalable D... Differential evolution(DE) demonstrates good convergence performance,but it is difficult to choose trial vector generation strategies and associated control parameter values.An improved method,self-adapting scalable DE(SSDE) algorithm,is proposed.Trial vector generation strategies and crossover probability are respectively self-adapted by two operators in this algorithm.Meanwhile,to enhance the convergence rate,vectors selected randomly with the optimal fitness values are introduced to guide searching direction.Benchmark problems are used to verify this algorithm.Compared with other well-known DE algorithms,experiment results indicate that this algorithm is better than other DE algorithms in terms of convergence rate and quality of optimization. 展开更多
关键词 differential evolution (DE) SCALABLE self-adapting parameter control function optimization
下载PDF
The scheme optimization on construction diversion with discharge control feature of upstream operational reservoir
3
作者 Liu Quan Hu Zhigen +2 位作者 Fan Wuyi Ni Jinchu Li Qinjun 《Engineering Sciences》 EI 2012年第4期61-67,82,共8页
There is a discharge control feature of construction diversion system with the upstream operational reservoir. The risk evaluation model of construction diversion is established by taking into consideration the risk f... There is a discharge control feature of construction diversion system with the upstream operational reservoir. The risk evaluation model of construction diversion is established by taking into consideration the risk factors of construction diversion system with discharge control feature as well as their composition. And the risk factors include the upstream operational reservoir discharge control, the interval flood and branch flood and the diversion system itself. And then based on analyzing of the conversion relation between risk index and investment index of diversion scheme, the risk control and conversion principals of diversion system are put forward, and the feasible diversion scheme model is built. At last, the risk and economic evaluation and scheme economic feasibility analysis method of diversion scheme are shown by an example of construction diversion scheme optimization with the discharge control condition of upstream hydropower station. The study is valuable for establishment and optimization of construction diversion scheme with upstream reservoir discharge control. 展开更多
关键词 construction diversion cascade hydropower development risk analysis scheme optimization
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部