The communication in the physical layer between an interrogator and a tag of a passive Radio Frequency Identification (RFID) system operating between 860-960 MHz is defined by the Gen 2 protocol. The tag can be cons...The communication in the physical layer between an interrogator and a tag of a passive Radio Frequency Identification (RFID) system operating between 860-960 MHz is defined by the Gen 2 protocol. The tag can be considered a remote executing unit or a computer that executes instructions from the Gen 2 protocol. The selection of the parameter and command configuration within the protocol limitations is critical especially if the time available for the memory operations in a passive RFID system is limited. An effort is made to map the operation of the tag not in its states of operation as elaborately explained in the protocol but rather in its elementary format. The research reported in this article identifies all the parameters that affect the dynamic operation of the tag. The operation is further divided into singulation, read and write; identifying the significant parameters in each case. The choices of the different commands that can be adopted to perform identical operations on the tag are analyzed. The elements to consider in selecting the optimum command configuration are described. The impact of the different parameter and command configuration on the singulation, read and write time is calculated and recorded using a tested Gen 2 simulator program.展开更多
In this paper, operation characteristic of condensate polishing system is studied during startup, based on generator blowdown limit, given limit ion concentration in condensate during condenser leakage. Further give c...In this paper, operation characteristic of condensate polishing system is studied during startup, based on generator blowdown limit, given limit ion concentration in condensate during condenser leakage. Further give conclusion about condensate polishing system configuration and operation requirement: full flow condensate polishing system (CPS) is necessary to the units cooled by sea water, and it is better that one or two series put in service during normal operation other than all of them in hot standby. While continuous condensate tube leakage is 256 L/h, the units cooled by fresh water will be shutdown immediately, for this level leakage, whichever condensate polishing system capacity is 50% (30%) or 100%, action level 2 will be preformed, so 50% (30%) is enough for fresh water cooled units.展开更多
文摘The communication in the physical layer between an interrogator and a tag of a passive Radio Frequency Identification (RFID) system operating between 860-960 MHz is defined by the Gen 2 protocol. The tag can be considered a remote executing unit or a computer that executes instructions from the Gen 2 protocol. The selection of the parameter and command configuration within the protocol limitations is critical especially if the time available for the memory operations in a passive RFID system is limited. An effort is made to map the operation of the tag not in its states of operation as elaborately explained in the protocol but rather in its elementary format. The research reported in this article identifies all the parameters that affect the dynamic operation of the tag. The operation is further divided into singulation, read and write; identifying the significant parameters in each case. The choices of the different commands that can be adopted to perform identical operations on the tag are analyzed. The elements to consider in selecting the optimum command configuration are described. The impact of the different parameter and command configuration on the singulation, read and write time is calculated and recorded using a tested Gen 2 simulator program.
文摘In this paper, operation characteristic of condensate polishing system is studied during startup, based on generator blowdown limit, given limit ion concentration in condensate during condenser leakage. Further give conclusion about condensate polishing system configuration and operation requirement: full flow condensate polishing system (CPS) is necessary to the units cooled by sea water, and it is better that one or two series put in service during normal operation other than all of them in hot standby. While continuous condensate tube leakage is 256 L/h, the units cooled by fresh water will be shutdown immediately, for this level leakage, whichever condensate polishing system capacity is 50% (30%) or 100%, action level 2 will be preformed, so 50% (30%) is enough for fresh water cooled units.