In order to study the distribution of lateral floor abutment pressure at a working face,we first used elasticity theory to establish a distribution model of lateral floor abutment pressure and then analysed its distri...In order to study the distribution of lateral floor abutment pressure at a working face,we first used elasticity theory to establish a distribution model of lateral floor abutment pressure and then analysed its distribution.Second,we established a three-dimensional numerical simulation model of the Haizi Coal Mine No.86 mining area by using FLAC^(3D)(ITASCA Consulting Group) software.We investigated the distribution of lateral floor abutment pressure of a stope,which indicated that the position of abutment pressure peak varies at different floor depths.We then determined the rational reinforcement range of a floor roadway,based on the conclusion reached earlier.Finally,we used our conclusions in support of the No.86 mining area crossing-roadway.The supported crossing-roadway remained stable when mining the upper workface,which validates the accuracy of our numerical simulation and provides a future reference for the support of span-roadways under similar conditions.展开更多
基金supported by the National Basic Research Program of China(No.2010CB226805)the National Natural Science Foundation of China(Nos.50874103 and 50974115)+1 种基金the Natural Science Foundation of Jiangsu Province(No.KB2008135)the State Key Laboratory Fund(No.SKLGDUEK0905)
文摘In order to study the distribution of lateral floor abutment pressure at a working face,we first used elasticity theory to establish a distribution model of lateral floor abutment pressure and then analysed its distribution.Second,we established a three-dimensional numerical simulation model of the Haizi Coal Mine No.86 mining area by using FLAC^(3D)(ITASCA Consulting Group) software.We investigated the distribution of lateral floor abutment pressure of a stope,which indicated that the position of abutment pressure peak varies at different floor depths.We then determined the rational reinforcement range of a floor roadway,based on the conclusion reached earlier.Finally,we used our conclusions in support of the No.86 mining area crossing-roadway.The supported crossing-roadway remained stable when mining the upper workface,which validates the accuracy of our numerical simulation and provides a future reference for the support of span-roadways under similar conditions.