In FLAC ^(3D),cable element or modified pile element can be used to build slope anchoring model.However,the difference between the two structural elements and their influence on the calculation results have not been s...In FLAC ^(3D),cable element or modified pile element can be used to build slope anchoring model.However,the difference between the two structural elements and their influence on the calculation results have not been studied in depth.In order to solve this problem,the Xiashu loess slope anchoring models based on cable element and modified pile element were constructed respectively.A variety of anchoring schemes were designed by orthogonal experiment method,and then they were brought into the model for calculation and the calculation results were analyzed by range analysis and variance analysis.The results show that the modified pile element can bear the bending moment and reflect the strain softening property of the grout.From the perspective of slope safety factor,the anchorage length and anchor bolt spacing are the main factors affecting the stability of the slope,and the anchorage angle is the secondary factor.The grout in cable element is assumed to be an elastic-perfectly plastic material,so the safety factor of the slope can be significantly increased by increasing the length of the anchor bolts.This will bring potential risks to the slope treatment project.Therefore,in the calculation of the slope anchoring model,the modified pile element is more suitable for simulating the anchor bolt.展开更多
The mixed model of improved exponential and power function and unequal interval gray GM(1,1)model have poor accuracy in predicting the maximum pull-out load of anchor bolts.An optimal combination model was derived usi...The mixed model of improved exponential and power function and unequal interval gray GM(1,1)model have poor accuracy in predicting the maximum pull-out load of anchor bolts.An optimal combination model was derived using the optimally weighted combination theory and the minimum sum of logarithmic squared errors as the objective function.Two typical anchor bolt pull-out engineering cases were selected to compare the performance of the proposed model with those of existing ones.Results showed that the optimal combination model was suitable not only for the slow P-s curve but also for the steep P-s curve.Its accuracy and stable reliability,as well as its prediction capability classification,were better than those of the other prediction models.Therefore,the optimal combination model is an effective processing method for predicting the maximum pull-out load of anchor bolts according to measured data.展开更多
基金Project(41672258) supported by the National Natural Science Foundation of ChinaProject(2018045) supported by the Science and Technology Project of Jiangsu Provincial Land and Resources,China。
文摘In FLAC ^(3D),cable element or modified pile element can be used to build slope anchoring model.However,the difference between the two structural elements and their influence on the calculation results have not been studied in depth.In order to solve this problem,the Xiashu loess slope anchoring models based on cable element and modified pile element were constructed respectively.A variety of anchoring schemes were designed by orthogonal experiment method,and then they were brought into the model for calculation and the calculation results were analyzed by range analysis and variance analysis.The results show that the modified pile element can bear the bending moment and reflect the strain softening property of the grout.From the perspective of slope safety factor,the anchorage length and anchor bolt spacing are the main factors affecting the stability of the slope,and the anchorage angle is the secondary factor.The grout in cable element is assumed to be an elastic-perfectly plastic material,so the safety factor of the slope can be significantly increased by increasing the length of the anchor bolts.This will bring potential risks to the slope treatment project.Therefore,in the calculation of the slope anchoring model,the modified pile element is more suitable for simulating the anchor bolt.
基金The National Natural Science Foundation of China(No.51778485).
文摘The mixed model of improved exponential and power function and unequal interval gray GM(1,1)model have poor accuracy in predicting the maximum pull-out load of anchor bolts.An optimal combination model was derived using the optimally weighted combination theory and the minimum sum of logarithmic squared errors as the objective function.Two typical anchor bolt pull-out engineering cases were selected to compare the performance of the proposed model with those of existing ones.Results showed that the optimal combination model was suitable not only for the slow P-s curve but also for the steep P-s curve.Its accuracy and stable reliability,as well as its prediction capability classification,were better than those of the other prediction models.Therefore,the optimal combination model is an effective processing method for predicting the maximum pull-out load of anchor bolts according to measured data.